Since most of the industries have adopted automation system, the industrial disaster has been declined sharply. Also automation system has offered many benefits such as productivity and assured quality. However, the construction industry is still relying on man power and because of this there are many victims occurring due to the industrial disaster. Construction industry has to overcome uncertainty of incidents and changing natural surroundings to actualize automation. Therefore, the efficient working plan and intelligent decision making process are needed to run more developed techniques and automations. Specially to decline the rate of industrial accidents occurred in basic construction in earth work, the automation via excavator is necessary and also the development of planning process system is too. This research is to establish Task Planning System to prevent disaster which is used for planning automated earth work.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.710-713
/
2007
This paper presents the findings obtained from several series of analysis on the fatal accident, which are maintained by Korean Production Household Mascot Safety Industrial Complex, relative to fall. The fall accidents occurred in 5 years, from 2002 to 2006, were analyzed. The statistic relative to the fatal accidents analyzed according to different classifications such as accident rate, project amount, project type, cause, type of occupation. years of experience, and time in a day. This research would contribute to ensure the effectiveness of safety policy so as to enhance worker safety. In addition, cluster analysis was applied to find the major contributors on the fall accidents. Cross referencing between occupation and type of work, and occupation and cause were established so that the occurrence statistics of fall accidents were investigated.
Background; In the event of an industrial accident, the appropriate choice of hospital is important for worker health and prognosis. This study investigates whether the choice of hospital by the employer in the case of industrial accidents affects the prognosis of injured employees. Methods; Data from the 2018 Panel Study of Workers' Compensation Insurance in Korea were used in an unmatched case-controlled study. The exposure variable is "hospital selection by an employer," and the outcome variable is 'worker's disability." Odds ratios (ORs) were estimated by modified Poisson regression and adjusted for age, gender, underlying disease, injury severity, and workplace size and stratified by industrial classification. The group at increased risk was analyzed and stratified by age, gender, and area. Results; In the construction industry, hospital selection by the employer was significantly associated with increased risk of disability (adjusted OR 1.26; 95% confidence interval [CI]; 1.20-1.32) and severe disability (adjusted OR 1.38; 95% CI; 1.08-1.76) among the injured. Female and younger workers not living in the Seoul capital area were more at risk of disability and severe disability than those living in the Seoul capital area. Conclusions; Hospital selection by employers affects the prognosis of workers injured in an industrial accident. For protecting workers' health and safety, workplace emergency medical systems should be improved, and the selection of appropriate hospitals to supply treatment should be reviewed.
The public safety management guidelines were introduced in 2019 and continue to be dedicated to advancing comprehensive measures for public safety management, with a primary focus on prioritizing the safety and well-being of the public within governmental institutions. To achieve this goal, our previous study developed a establishment procedure of risk assessment-based safety inspection system for public institutions that order construction projects and applied it to highway construction projects to evaluate its effectiveness. To enhance the practicality of the establishment procedure, it is essential to collect and analyze feedback from stakeholders regarding its performance and suitability. This study conducted a survey involving 200 participants who had experience with the establishment procedure, and performed statistical analyses to evaluate its performance and applicability. The survey results indicated that the participants reported a high level of satisfaction (scoring 4 and above on a 5-point Likert scale) in several areas: specialization of safety inspection items for different types of work (with a satisfaction rate of 65%), the evaluation process for safety ratings (64.5%), and their willingness to recommend the procedure to other institutions (75.5%). In the factor analysis with Varimax rotation, two factors emerged: (1) a specialization factor related to safety inspection items, and (2) a grading factor associated with safety evaluation results. Regression analyses of these factors unveiled significant positive relationships with improvements in safety and health performance, including the prevention of fatal accidents, heightened safety responsibility, and raised safety inspection standards. The establishment procedure of safety inspection system developed in our previous study can play a crucial role in reducing accidents resulting in fatalities and injuries at construction sites, ultimately contributing to a safer working environment for all involved parties.
Safety accidents, which are called industrial accidents in construction work, are often caused by unstable physical and personal conditions combined during preparation and execution of work. It is difficult to manage all the construction works, but especially in the field of apartment construction work, complex and many kinds of works are being carried out at the same time. In the current construction, safety regulations such as safety management guidelines are generally well maintained, but the execution of manpower resources that can fulfill them is limited, and it is difficult to reduce the accident rate and loss cost. Therefore, in this study, it is a reality that most of the types of construction work are under contruction by subcontracting contract, so they are limit by methods of manual maintenance and safety education. Currently, the subcontractor is also allowed to perform safety management through the composition of the safety management review body, but it is operated formally. So alternatives to this were studied. As a result, safety accidents occur in the subcontractor's worker due to vertical integration, which is characteristic of the construction industry, together to the contractor, the safety management system is based on a safety construction system in which a worker who has a certain qualification condition such as career experience of the work type, work understanding of the work type, and management experience of the work type among the subcontractor, when we manage based on mutual personality which is the personality of interpersonal relationship that can communicate with each other by work type, process and grouping, it is concluded that effective and practical safety management can be achieved to reduce the accident rate and loss cost.
Lee, Jeong Han;Kim, Yong Gon;Lee, Jae Won;Kim, Jong Hoon
Journal of the Korean Society of Safety
/
v.37
no.5
/
pp.33-41
/
2022
As the number of automobile registrations increases yearly, parking spaces that are located in downtown areas are increasing, and mechanical parking facilities are also increasing. Therefore, there is a high risk of accidents when installing and repairing a mechanical parking facility. In the preceding six years (from 2012 to 2018), the statistics that pertain to accidental disasters indicated that a total of 137 disaster victims were generated by the construction sector, 33 accidents occurred, and 10 people died. However, only the safety management items pertaining to accidents that occur during maintenance work and the use of the installed mechanical parking facilities are being studied; furthermore, there is no ongoing research with respect to the risk management that is conducted at the construction site. In 2017, the Korea Occupational Safety and Health Agency (KOSHA) announced the "Guidelines for Safe Installation and Maintenance of Mechanical Parking Equipment"; however, it is a safety guideline that is limited to the installation of basic protective equipment and to facility installation. There is no model for mechanical parking facilities that is indicated in the "Risk Assessment Model by Construction Industry Type", which is issued by the Safety and Health Corporation and is widely utilized for risk assessment in the construction industry; moreover, elevator installation work CODE N0: 22 is the only major example of a disaster. In this study, "risk assessment through a focus group interview" was performed, and data was derived from the "risk assessment of Article 41 (2) of the Industrial Safety and Health Act", which reflects the characteristics of the construction industry based on AHP analysis. The results of this study can be utilized for the risk assessment that is conducted during the construction stage of mechanical parking facilities.
If industrial safety statistics are analyzed, among the total of 2,114 dead people from industrial disasters in 2011, construction workers took 29.4% with 621. The construction industry makes a lot of efforts to reduce the death toll. However, since the measures are not from the analysis of root causes but from superficial countermeasure plans near general matters, it is in a situation that the actual effectiveness is marginal. Therefore, in this paper, improvement measures were intended to be prepared in order to reduce accidents, by inspecting safety control systems of target companies with high accident rates among major construction firms and extracting overall problems of them.
Construction industry has one of the worst occupational health and safety records amongst all other industries. In this study, we developed a method to compute the severity rate (SR) and measured SR values of apartment construction incidents. The two-year records (1996-1997) from database by the Korea Industrial Safety Corporation (KISCO) were used in the current study. To determine the severity rate (SR), the lost workdays (LW) and the number of injured workers and fatalities (NIW) as well as the number of accidents (NA) were considered. These results appear to indicate that the SR measurement we developed in this study is adequate to estimate the safety of apartment construction environment.
Safety aspect in the manufacturing facility or at the construction site is increasingly emphasized in Korea for last a decade. As a result, the number of industrial accident is decreased slowly by improving the reliability of equipments and human performance through organizational efforts. This paper proposes a mathematical model to estimate and predict the human reliability level corresponding to the worker's job experience. For this purpose, we used the statistics of industrial accidents issued by the Department of Labor in the years of 94-96. The methodology developed in this research will provide a basis for better cost estimation in planning labor policy in the early stage of a project. We believe that this effort would eventually lead to a basis for a new approach to the safety planning.
This study is concerned with the disasters that occure in the field of industrial explosives and analyzed by two side the disaster of the manufacturing factory and that of the field, and is studied about the safety and the countermeasure. The industrial explosives accidents occure just accidentaly and unforeseeable, and reappearance experiments are more difficult. The 3E of J.H. Harvey was applied in this study to establish the counter measure of preventation of accidents, overcoming these restricted factores. As a method of technical safety countermeasures. The blasting vibration formula which had been conformed from the Seoul Subway Construction work during 1980-1984 year, was uilized, and, using the formula $V=Kw^{0.5}D^{-1.5}$ for the gneiss which is widely distributed in Pusan area, an index of the minimum and maximum amount of gun powder, to be used according to safety distance was made, and it helped the gun powder managing technician's practical business. During the fore work discharging, the safety distances of felling were theoretically established based on the writer ${\diagdown}s$ experiences of more than 10 years on this field.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.