Journal of Applied Tourism Food and Beverage Management and Research
/
v.13
no.1
/
pp.81-110
/
2002
The temporary tax deduction on investment cutting the corporate income tax within 10% of the amount of investment is aimed at stimulating the investment for economic activity. 25 business sectors are applied to this tax law and in tourism, the accommodation registered by tour promotion law and international convention plan business belong to it. I'd like to mention the problem of the temporary tax deduction on investment amount for hotels and suggest better solutions. This tax law is so temporary applied that we shouldn't get tax deduction after June 30, 2002. So, we can't get income tax deduction on the investment out of the available period. And further more this tax law has a rule not real investment but solely new project investment for hotels. There are numbers of difference between real investment and new project investment. The amount of investment is based on an object of acquisition taxation. And also there are numbers of difference between real investment and an object of acquisition taxation. For example, landscape construction is a great part of hotel construction but it's not an object of acquisition taxation. For running hotel business, we also need lots of equipments such as linens utensils for restaurant and decorations for hotel interior. But these are also excluded from this tax law. As you know, these equipments can be regarded as product equipments in manufacture industry. Therefore we should take the specificity of hotel investment into consideration and expand the role of the temporary income tax deduction on investment amount for hotels.
Journal of the Korea Institute of Building Construction
/
v.9
no.1
/
pp.49-55
/
2009
In this study, reduction methods of surface air void were examined for high performance concrete having high viscosity. The effects of assumed influencing factors such as form types, form-coating materials, tamping equipments and methods were examined based on the tests on mock-up specimens made of high performance concrete. The test results can be summarized as follows: As for form types, the most favorable results were obtained when coated plywood form was used with panel-shape tamping equipments at the contact region with concrete, the second and the third being the water/air-permeable sheets and steel with coated plywood, respectively. As for tamping equipments, a vibrator with 6.5cm diameter was most effective. Finally, the shorter the tamping intervals, the better the reduction effect of surface air void. As a conclusion, an improved method was proposed to reduce surface air void and it was verified with the test result that only four air voids as large as $5{\sim}10mm$ are found in the are of $1m^2$.
This paper describes the construction scheme of new distribution system using HTS(High Temperature Superconducting) power equipments such as cable, transformer and FCL(fault current limiter). At present, one of the most serious problems in distribution power system, especially for metropolitan complex city, is to obtain the ROW for cable line routes, space for downtown substations and satisfy the environmental protection caused by NIMBY phenomena. Unfortunately, it is expected that this situation will get more and more worse. As the HTS technology to apply in power system Is developed, HTS cable utilizing mass-capacity characteristic can be a useful countermeasure to overcome this problem. This paper describes the application methodology of 22.9kV HTS cable with low-voltage, mass-capacity characteristics replacing the 154kV conventional cable. By applying 22.9kV HTS cable, the HTS transformer with higher capacity for the reduction of space and transformer numbers of downtown substation is necessary. Also, if the leakage Impedance of HTS transformer is same as or lower than that of conventional transformer, the fault current of 22.9kV bus will increase because the HTS transformer capacity is larger than that of the conventional transformer. This means the parallel application of HTS-FCL to reduce the fault current in addition to the HTS cable and transformer can be necessary. With the basic construction scheme of new distribution system, this paper describes the future study points to realize this new distribution system using HTS equipments.
Journal of the Korea Construction Safety Engineering Association
/
s.41
/
pp.80-87
/
2007
The purpose of this paper is to investigate the removal efficiency of fine dusts as the configuration condition of machinery and equipments in Clean Room and to analyze the flowing behaviors of fine dusts as the layout of Clean Room. The layout of the Clean Room was classified into side layout type, 2 center line type and center concentration type layout, and the flow rates used in this research were 0.22m/s, 0.44m/s and0.80m/s. Dust removal efficiency as layout change was decreased 37% for side layout type, 31% for 2 centerline type and 20% for center concentration type layout at the flow rate of 0.22m/s, compared with the state without machinery and equipments in Clean Room. The efficiency was decreased 42% for side layout type,22% for 2 center line type and 8% for center concentration type layout at the flow rate of 0.44m/s, and decreased 20% for side layout type, 18% for 2 center line type and 10% for center concentration type layout at the flow rate of 0.80m/s. According to the result of dust removal behavior, $0.3\mum$, $1\mum$and $3\mum$dust except for $5\mum$showed the higher change of the behavior in side layout type than in center concentration type layout due to the change of air flow. It was confirmed that removal behavior depends on the layout of machinery and equipments as the dust size decreases.
Proceedings of the Korean Geotechical Society Conference
/
2000.03b
/
pp.591-598
/
2000
In the present study, the variation of settlement, pore water pressure and undrained shear strength through model tests were measured. Also, the variation of water content, unit weight and shear strength by the vane shear tests were observed. In this study, appropriate deposit time of construction equipments used in treatment of hydraulic fills is determined from the prediction curve of increased shear strength in dredged fills.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2005.05a
/
pp.535-540
/
2005
In environmental impact assessment, noise impact assessment usually consists of three stages surveying the existing noise levels by measurements, predicting noise levels induced by construction works and predicting noise levels after the completion of project. When predicting noise level in urban area, this method does not consider acoustic phenomena like multi reflection, diffraction and absorption due to complex topographic configuration of building and terrains. For the purpose, a noise mapping tool is utilized to produce a series of noise maps, which are those for the present, for the works of construction and for the future. For accurate noise mapping, acoustical and topographic information is essential. Standard sound power levels and directivities of various construction equipments are required and scheduling of construction processes and locations of the equipments should be provided. In the case of exceeding legal limit, mitigation measures are applied to satisfy the legal limits and subsequent noise map is obtained and checked.
Journal of the Korea Academia-Industrial cooperation Society
/
v.12
no.8
/
pp.3758-3765
/
2011
The operators' visibility of underwater construction equipments plays a key role for safe and efficient construction. The visibility can be limited within 30cm in the West Sea of South Korea where water is considerably turbid. This paper investigates the appropriate location and projection angle of light to be used for construction equipments using model tests. It was discovered that visibility was obtained when the light was located near the target objects with a projection angle of $45^{\circ}$.
Transactions of the Korean Society for Noise and Vibration Engineering
/
v.15
no.11
s.104
/
pp.1311-1317
/
2005
In environmental Impact assessment, noise impact assessment usually consists of three stages-surveying the existing noise levels by measurements, predicting noise levels induced by construction works and predicting noise levels after the completion of a project. The distance-attenuation relation of a point source, which has been used to predict the noise level due to its simplicity does not consider complex acoustic phenomena like multi-reflection, -diffraction and -absorption due to complex topographic configuration of buildings and terrains. For the consideration of such physical complexities. a noise mapping tool is adopted to produce a series of noise maps, which are those for the present, tot the works of construction and for the future. For accurate noise mapping, acoustical and topographic Information is used. Standard sound power levels and directivities of various construction equipments are need and scheduling of construction processes and locations of the equipments should be provided. In the case of exceeding legal limit, mitigation measures are applied to satisfy the legal limits and subsequent noise map is obtained and checked.
Yeom, Dong Jun;Seo, Jung Hoon;Yeom, Han Seung;Yoo, Hyun Seok;Kim, Young Suk
Korean Journal of Construction Engineering and Management
/
v.17
no.3
/
pp.143-155
/
2016
Recently, the interest on applying AVM(Around View Monitoring) systems in construction equipments have been increasing due to the demand for better control, work efficiency and safety. Most of the existing AVM systems have been developed focusing on the application in automobiles and only several AVM systems have been developed for construction equipments. However, the original technology of AVM remained the same as in the automobiles that failed to consider the main properties of construction equipments and suggest appropriate range of AVM display (Top-view). Therefore, the purpose of this study is to suggest a pilot type of AVM system for construction equipment. Accordingly, literature review, deduction of main consideration factors, selection of sensors, system design, algorithm development of a pilot type of AVM system for construction equipment have been conducted. A laboratory experiment has also been conducted for the deduction of further improvements. As a result, a minimum image refresh rate of 20 fps has been achieved that clearly reflects the actual situation of the equipment and also, the actual motions of Boom, Arm, Bucket have been displayed appropriately on the AVM system based on the angle data collected by sensors. However, the experiment results have also shown that the following tasks still remain for future work: 1)Improvement of AVM image interpolation, 2)Development of calibration module for variety construction equipment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.