• Title/Summary/Keyword: Construction Engineer

Search Result 420, Processing Time 0.029 seconds

Impact Analysis of BIM Spread on Mechanical Design Process Based on Consciousness Survey among Japanese Mechanical Engineers

  • Hiyama, Kyosuke;Diao, Yunting;Kato, Shisuke;Koganei, Makoto
    • International Journal of High-Rise Buildings
    • /
    • v.2 no.2
    • /
    • pp.97-104
    • /
    • 2013
  • Recently, the demand for Building Information Modeling (BIM) construction drawings and specifications has increased rapidly. Many countries have also started to implement BIM. The BIM implementation can change the design flow of buildings including high-rise buildings. Against this background, many companies are focusing on the development of BIM software. BIM involves a three-dimensional CAD program that can examine the placement of ductwork and machinery. It significantly increases the efficiency of a mechanical design through data unification using standard Industry Foundation Classes (IFC). In addition, BIM functions as a database to simplify the use of simulation technology for designing air-conditioning systems. To further develop BIM, it is important to know the expectations of mechanical engineers who will become frequent users of BIM in the future. A survey was conducted among Japanese mechanical engineers using a questionnaire to analyze the expectations of mechanical design using BIM. The results show that many respondents strongly recognize BIM as a three-dimensional CAD program. However they also expect that BIM can help the optimization of their design works and enhance design functionality by running simulations utilizing BIM.

News Focus - Today and Tomorrow of the Korea-made NPP, SMART (뉴스초점 - 한국 토종 원자로 'SMART"의 오늘과 내일)

  • Kim, Hak-Roh
    • Journal of the Korean Professional Engineers Association
    • /
    • v.44 no.6
    • /
    • pp.40-44
    • /
    • 2011
  • Nuclear energy in Korea began in 1958, when the Korea's atomic energy act was formulated and the relevant organizations were founded. Since then, notwithstanding the two catastrophe like TMI and Chernobyl accident, Korea made a wise decision to expand the peaceful uses of the nuclear energy as well as to localize the essential nuclear design technology of fuel and nuclear steam supply system. This decision resulted in the success of export of nuclear power plants as well as research reactor in 2010s. The Korea's nuclear policy, which well utilized 'international crisis in nuclear business' as 'opportunity of Korea to get. nuclear technology', is believed nice policy as a role model of nuclear new-comer countries. Based upon the success story of localization of nuclear technology, Korea had an eye for a niche market, which was a basis of development of SMART, Korea-made integral PWR. The operation of a SMART plant can sufficiently provide not only electricity but also fresh water for 100,000 residents. Last two years, Korea's nuclear industry team led by the Korea Atomic Energy Research Institute completed the standard design of SMART and applied to the Korea's regulatory body for standard design approval. Now the Korea's licensing authority is reviewing the design with the relevant documents, and the design team is doing its best to realize its hope to get the approval by the end of this year. From next year, the SMART business including construction and export will be explored by the KEPCO consortium.

  • PDF

Experimental Studies on the Corrosion of Reinforcement Steel in Reinforced Concrete with Corrosion Inhibitors (방식재를 사용한 철근 콘크리트의 철근부식에 관한 실험적 연구)

  • Y.S Chung;G.H Han;Lee, G.G.;J.W. Jang;Park, E.K.
    • Magazine of the Korea Concrete Institute
    • /
    • v.9 no.6
    • /
    • pp.175-183
    • /
    • 1997
  • 경제성장에 따른 항만구조물의 건설 및 유지관리에 관한 관심이 급격히 고조되고 있다. 이러한 항만구조물은 해양환경에 노출되어 콘크리트에 매입된 철근의 부식을 야기시키는 요인에 접해있다. 한편, 콘크리트 내부의 염분침투는 매입철근의 부식을 가속화시켜 콘크리트 구조물의 내구성에 상당히 큰 피해를 입힐 수 있다. 본 연구의 목적은 여러 가지 방식제를 사용함과 동시에 물/시멘트을 달리한 실험변수를 이용한 시험체에 대한 부식평가 및 매입철근의 적절한 부식방지 기법의 개발에 있다. 해양환경 조건을 simulation한 해수 및 담수 순환장치를 이용한 실내 시험체의 철근 부시도 평가 및 항만현장에 직접 거치된 시험체 등 다양한 조건하의 2년간의 실험이 현재 진행 중에 있다. 40주에 걸쳐 간헐 침투되는 해수조건에서 60개의 콘크리트 시험체의 철근 부시도 평가결과를 기초하여 180여개의 콘크리트 시험체를 새로이 제작하여 Half-Cell Test를 통한 Instant-Off Potential, Current Method를 통한 Corrosion current, Chloride Content 및 시험 종료후 시험체를 파쇄하여 부식된 철근의 무게측정등을 통하여 거동 및 부식을 예측.평가하고 이를 통한 부식방지기법을 개발하고자 한다.

Effect of Wave Load on the Member Force of Steel Structure of Floating Buildings

  • Lee, Young-Wook;Park, Tae-Jun
    • International journal of steel structures
    • /
    • v.18 no.4
    • /
    • pp.1431-1439
    • /
    • 2018
  • For floating buildings may fl oat on the water for a long time, they are constantly affected by various environmental loads such as wind and wave loads. In this study to find the wave effect on the floating building, five models are designed using steel moment resisting frame. It is assumed that the lower part of the floating building is a reinforced concrete pontoon, while the upper part is a three-story steel frame. To analyze floating buildings affected by wind and wave loads, hydro-dynamic and substructure analysis are performed. As input loads, this study set limits that the mean wind velocity is 35 m/s and the significant wave height is 0.5 m for the residential building. From the hydrodynamic analysis, the time-history acceleration of building is obtained and transformed into a base ground input for a substructure analysis of the superstructure of the building. Finally the mean of the maximum from 30 dynamic analysis of the floating buildings are used to be compared with the results of the same model on the ground. It was shown that the dynamic results with wind and wave loads are not always lesser than the static results which are calculated with static equivalent wind load for a building that is located on the ground.

Weathering durability of biopolymerized shales and glacial tills

  • Amelian, Soroosh;Song, Chung R.;Kim, Yongrak;Lindemann, Mark;Bitar, Layal
    • Geomechanics and Engineering
    • /
    • v.28 no.4
    • /
    • pp.375-384
    • /
    • 2022
  • The glacial tills and shales in Midwestern states of the USA often show strength degradation after construction. They are often in need of applying soil modification techniques to remediate their strength degradation with weathering process. This study investigated the weathering durability of these natural soils and biopolymer treated soils by comparing direct shear test results for wet-dry and wet-freeze-thaw-dry cycled specimens. The tests showed that untreated glacial tills maintained only 62% and 50% initial shear strength after eight wet-dry cycles and eight wet-freeze-thaw-dry cycles, respectively. These untreated soils could not withstand by themselves after 16 weathering cycles. The same soils treated with 1.5% (by dry weight) food-grade Xanthan gum maintained 140% and 88% initial shear strength of untreated soils after 16 weathering cycles for wet-dry cycles and wet-freeze-thaw-dry cycles, respectively. The same soils treated with 1.5% (by dry weight) Gellan gum maintained 82% and 60% initial shear strength of untreated ones after 16 weathering cycles, respectively. Similar results were obtained for crushed shales, manifesting that the biopolymerization method may be adopted as a new eco-friendly method to enhance the weathering durability of these problematic soils of glacial tills and shales.

Causes of local collapse of a precast industrial roof after a fire

  • Bruno Dal Lago;Paride Tucci
    • Computers and Concrete
    • /
    • v.31 no.5
    • /
    • pp.371-384
    • /
    • 2023
  • Precast roofing systems employing prestressed elements often serve as smart structural solutions for the construction of industrial buildings. The precast concrete elements usually employed are highly engineered, and often consist in thin-walled members, characterised by a complex behaviour in fire. The present study was carried out after a fire event damaged a precast industrial building made with prestressed beam and roof elements, and non-prestressed curved barrel vault elements interposed in between the spaced roof elements. As a consequence of the exposure to the fire, the main elements were found standing, although some locally damaged and distorted, and the local collapse of few curved barrel vault elements was observed in one edge row only. In order to understand and interpret the observed structural performance of the roof system under fire, a full fire safety engineering process was carried out according to the following steps: (a) realistic temperature-time curves acting on the structural elements were simulated through computational fluid dynamics, (b) temperature distribution within the concrete elements was obtained with non-linear thermal analysis in variable regime, (c) strength and deformation of the concrete elements were checked with non-linear thermal-mechanical analysis. The analysis of the results allowed to identify the causes of the local collapses occurred, attributable to the distortion caused by temperature to the elements causing loss of support in early fire stage rather than to the material strength reduction due to the progressive exposure of the elements to fire. Finally, practical hints are provided to avoid such a phenomenon to occur when designing similar structures.

Developing the Accurate Method of Test Data Assessment with Changing Reliability Growth Rate and the Effect Evaluation for Complex and Repairable Products

  • So, Young-Kug;Ryu, Byeong-Jin
    • Journal of Applied Reliability
    • /
    • v.15 no.2
    • /
    • pp.90-100
    • /
    • 2015
  • Reliability growth rate (or reliability growth curve slope) have the two cases of trend as a constant or changing one during the reliability growth testing. The changing case is very common situation. The reasons of reliability growth rate changing are that the failures to follow the NHPP (None-Homogeneous Poisson Process), and the solutions implemented during test to break out other problems or not to take out all of the root cause permanently. If the changing were big, the "Goodness of Fit (GOF)" of reliability growth curve to test data would be very low and then reduce the accuracy of assessing result with test data. In this research, we are using Duane model and AMSAA model for assessing test data and projecting the reliability level of complex and repairable system as like construction equipment and vehicle. In case of no changing in reliability growth rate, it is reasonable for reliability engineer to implement the original Duane model (1964) and Crow-AMSAA model (1975) for the assessment and projection activity. However, in case of reliability growth rate changing, it is necessary to find the method to increase the "GOF" of reliability growth curves to test data. To increase GOF of reliability growth curves, it is necessary to find the proper parameter calculation method of interesting reliability growth models that are applicable to the situation of reliability growth rate changing. Since the Duane and AMSAA models have a characteristic to get more strong influence from the initial test (or failure) data than the latest one, the both models have a limitation to contain the latest test data information that is more important and better to assess test data in view of accuracy, especially when the reliability growth rate changing. The main objective of this research is to find the parameter calculation method to reflect the latest test data in the case of reliability growth rate changing. According to my experience in vehicle and construction equipment developments over 18 years, over the 90% in the total development cases are with such changing during the developing test. The objective of this research was to develop the newly assessing method and the process for GOF level increasing in case of reliability growth rate changing that would contribute to achieve more accurate assessing and projecting result. We also developed the new evaluation method for GOF that are applicable to the both models as Duane and AMSAA, so it is possible to compare it between models and check the effectiveness of new parameter calculation methods in any interesting situation. These research results can reduce the decision error for development process and business control with the accurately assessing and projecting result.

An Experimental Study on Establishing Criteria of Gripping Work in Construction Site (건설 현장 악력 작업안전 기준 설정에 관한 실험적 연구)

  • 손기상;이인홍;최만진;안병준
    • Journal of the Korean Society of Safety
    • /
    • v.10 no.3
    • /
    • pp.81-95
    • /
    • 1995
  • Now, safety assurance in construction sites should be accomplished by its own organization rather than control of the code or government. It is believed that the safety assurance can be considerably improved by a lecture or an education using the existing theories or literatures up to now, but it is thought that fundamental safety assurance we not able to be accomplished without developing safety devices '||'&'||' equipment or taking fundamental measures, based on the result analyzed from workers behaviors. There are various behaviors of the workers showed in construction site, but only tests for hammerusing works such as form, re-bar, stone workers directly related to the grip strength are mainly performed, investigated and measured here for the study. The above works are similar to power grip, 7th picture on seven items which are categorized for hand grip types(Ammermin 1956 ; Jones ; Kobrick 1958). Measurements of grip strength are commonly taken in anthropometric surveys. They are easy to administer but unfortunately it is rather dubious whether they yield any data that are of interest to the engineer. Very fewer controls of tools are grasped and squeesed studies showed very little overall correlation between grip strength and other measures of bodily strength (Laubach, Kromer, and Thordsen 1972), but hammer-using work which is practically progressed in construction site are mainly influenced with grip strength. According to the investigation on work measurement, it is shown that 77% of form worker are using hammer to be related to grip strength. In this study, it is particularly noticed that wearing safety gloves in construction site is required for workers safety but 20% difference between grip strength with safety gloves and without ones are commonly neglected in the site(Fig. 1). Nevertheless, safety operation with consideration of the above 20% difference is not considered in the construction site. Factors of age, kinds of work, working time, with or without safety gloves are in vestigated '||'&'||' collected at the sites for this study. Test, not at each working hour but at 14 : 00 when the almost all of the workers think the most tired, resulting from the questionaires, also when it is shown on the research report has been performed and compared for main kinds of works : form '||'&'||' re-bar work. Tests were performed with both left SE rightand of the workers simultaneously in construction site using Rand Dynamometer(Model 78010, Lafayette Instrument Co., Indiana, U.S.A) by reading grip strength on the gauge while they are pulling, and then by interviewing on their ages, works, experiences and etc., directly. The above tests have been performed for the dates of 15th march-26th May '95 with consideration of site condition. And even if various factors of ambient temperature on the testing date, working condition, individual worker's habit and worker's condition of the previous ate are concerned with the study. Those are considered as constants in this study. Samples are formwork 53, rebar 62, electrician 5, plumber 4, welding 1 from D construction Co., Ltd, ; formwork 12, re-bar 5, electrician 2, from S construction Co., Ltd, , formwork 78, re-bar 18, plumber 31, electrician 13, labor 48, plumber 31, plasterer 15, concrete placer 6, water proof worker 3, maisony 5 from B construction Co., Ltd. As In the previously mentioned, main aspect to be investigated in this study will be from '||'&'||' re-bar work because grip strength will be directly applied to these two kinds of works ; form '||'&'||' re-bar work, eventhough there are total 405 samples taken. It is thought that a frequency of accident occurrence will be mainly two work postures "looking up '||'&'||' looking down" to be mainly sorted, but this factor is not clarified in this study because It will be needed a lot of work more. Tests has been done at possible large scale of horizontally work-extended sites within one hour in order to prevent or decrease errors '||'&'||' discrepancies from time lag of the test. Additionally, the statistical package computer program SPSS PC+has been used for the study.

  • PDF

A Study on Current Status of Landscaping Supervision Quality Control and Improvement Measures in Apartment House Construction (공동주택 건설사업에서 조경 감리의 품질관리 현황과 개선방안 연구)

  • Kim, Jung-Chul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.1
    • /
    • pp.1-18
    • /
    • 2021
  • This study was intended to present measures for the improvement of the apartment house landscaping supervision system by examining the adequacy of landscaping supervision, which is aimed at improving the quality of landscape plants and facilities in apartment house landscaping sites. Additionally, this study aims to identify the problems occurring in the process of the performance of landscaping supervision and to provide the evidence for legislative activities and revision of the laws currently being pushed forward for the mandatory deployment of apartment house landscaping supervision personnel. The results of the analysis showed that no landscaping supervision personnel was deployed to apartment complexes with less than 1,500 households and that the landscaping comprised 19% to 46% of the entire construction process. The civil engineering firm performed the landscaping supervision, which made it impracticable to fully focus on the construction quality in the field of landscaping. The quality control in terms of landscape plants revealed differences in quality control, depending on the competence and experience of the civil engineer supervising the personnel, where the landscaping supervision personnel was not deployed. The apartment houses landscaping supervision activity index was analyzed, and the results showed that the supervision activity index for apartment house A was 72.0, B was 70.4, and apartment houses C to G ranged from 38.7 to 46.9, which suggested that the difference in quality control, process control, and technical support affected the construction quality and occurrence of defects.The improvement of landscaping process quality control and process management will be carried out more smoothly and the rate of defects will be drastically reduced if the landscaping supervision personnel placement threshold is lowered from 1,500 households to 300 households in complexes. The results of this study are expected to be useful in promoting and re-establishing the landscaping industry based on the improvement of construction quality in the field of landscaping in connection with the construction of apartment houses.

A Study of the Korean Historical Development of Explosives Technology(Korean Traditional Explosive Technology) (화약기술발전의 사적고찰에 관한 연구 (한국의 고대 화약기술))

  • 나윤호;손선관
    • Journal of the Korean Professional Engineers Association
    • /
    • v.12 no.1
    • /
    • pp.12-20
    • /
    • 1979
  • The early history of gun powder (black powder) and explosives was closely connected with the discovery of methods of preparing and purifing salpetre (potassium nitrate KNO$_3$). The Chineses apparently became acquainted with salpetre firstly on about 11th century, and they were possibly the original discoverers of salpetre for raw material of gun powder. The Egyptians called it “Chinese snow”, and it is significant that Chingis-Khan, the Mongol conqueror, took the Chinese eenginees with him in 1218 to use it for attacking the fortifications of the Persian cities. The black powder was invented by chance by Chinese alchemists during the Song dynasty (11th century) in the process of manufacturing medicine, and the powder was introduced to Europe by Mongol army. The manufacturing method of salpetre and gun powder was introduced to Korea from China in 1374, and the powder alld gunnery manufacturing project was developed by Mu Sun Choe(崔茂宣), the first Korean engineer late in Koryo dynasty. Coming in to Yi dynasty the explosive technic, extractive method of salpetre, and gunnery manufacturing process were developed greatly by Mu Sun Choe and Hai Sin Choe (崔海臣). However, confronting with the Japanes invasion at Imjin War (1597) with more powerful western style rifles which had been introduced from the Portuguese, on the contrary Korean army with the traditional guns couldn't compete with them. The Chochong(烏銃, the western rifle introduced in Japane) were much superior to the Chinese style traditional guns in the shooting power and striking efficiency. On the other hand, the Japanese battle ships armed only with the Chochong, when confronted with the Korean turtle shaped ships under the commanding of Admiral Yi Sun-Sin(李舞臣), were defeated by the Korean canons on the ships. The technical development of the modern powder industry in Korea. with the construction of four big explosive plants from 1930 to 1945, has resulted the mass-production of explosives. This study was purposed to investigate to the process with regard to the details of introduction to the explosive technology in Korea, and intended to give a help to the engineers who are engaged in study of the explosive technics by means of giving a spot light data on the early process of the designs, and making suggestion to the researchers for further study and invent a new and modern explosive.

  • PDF