• 제목/요약/키워드: Construction Cost Rate

검색결과 499건 처리시간 0.027초

CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 - (Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit -)

  • 정운수;최기수
    • 한국조경학회지
    • /
    • 제40권2호
    • /
    • pp.97-111
    • /
    • 2012
  • 본 연구는 공공건설공사 중 조경공사 적산의 단가 비교로 적정 공사비 산출방안을 모색하고자 하였다. 2011년 상반기 실적단가에서 조경공사로 분류되는 12항목 중 유사기준인 7항목을 대비하며, 준용 공종은 5개 현장에 적용된 실적단가 80항목 중 비교 가능한 35항목을 유사기준인 2011년 3월의 표준품셈 단가로 대비하였다. 조경부문 7항목의 실적공사비율은 항목별로는 104.86%, 총공사비로는 92.09%이다. 실적공사비율이 높은 이유는 암반 적용 여부로 씨앗뿜어붙이기의 높은 비율도 있지만, 근본적인 이유는 잔디와 씨앗뿜어붙이기의 사면처리 비용 때문이므로, 품셈의 불합리성과 토양 종류별 기준별 보정계수 규정을 세분할 필요가 있다. 토목과 건축 준용부문 35항목의 실적공사비율은 항목별로 78.65%, 총공사비로는 71.31%(70.17%)이다. 이는 실적단가가 구조적으로 실제 금액을 반영하지 못하는 점과, 품셈은 인력시공에서 현실성이 결여된 때문으로 판단된다. 국토해양부 발표인 85.1~91.2%의 실적공사비율은 신규 전환품목 단가이므로, 이 결과는 실제적인 실적공사비율로 추정되며, 실적단가가 적정 비율을 보이도록 검증 후 보완하고 표준품셈도 이러한 실적자료 등으로 보완이 필요하다.

엔지니어링대가 공사비 요율 산출방법 고찰 (Calculation of Construction Cost Rate to Telecommunications Engineering Service)

  • 홍완표;최광돈
    • 한국정보통신학회논문지
    • /
    • 제10권12호
    • /
    • pp.2121-2125
    • /
    • 2006
  • 본 논문은 엔지니어링 기술진흥법 제10조에 근거하여 엔지니어링 대가를 계산하는 경우에 적용하고 있는 공사비 요율방식의 공사비 요율을 산출하는 방식을 이론적으로 고찰하였다. 기존의 공사비 요율은 경험치에 의한 통계방식 또는 외국에서 적용되고 있는 요율을 기준으로 산출하여 왔다. 이 논문에서 제시하는 공사비 요율 산출방식은 기존의 경험통계에 의한 요율곡선을 적용하면서 요율산출에 필요한 요소를 이론적으로 적용하는 것으로서 통신부문의 엔지니어링 대가 산정에 필요로 하는 공사비 요율을 합리적으로 산출할 수 있다.

완성공사 원가구성 분석에 의한 간접노무비율 산정방법에 관한 연구 (A Study on the Method of Estimating Indirect Labor Cost Rate Using the Analysis of Cost Items in Complete Works)

  • 정순길;이학기
    • 한국건설관리학회논문집
    • /
    • 제2권2호
    • /
    • pp.81-89
    • /
    • 2001
  • 건설산업은 생산의 단속성, 시장의 불안정성 등 다른 산업과 비교하여 독특한 특성을 갖고 있다. 이러한 특성으로 인해 건설 공사의 비용은 일반 제조업분야에 비해 실제 투입되는 생산비용을 파악하기가 어려우며 프로젝트별로 많은 차이를 나타낸다. 따라서 건설비용을 표준화하는 것은 매우 어려운 작업이며, 비용의 정확한 측정과 분석은 매우 중요한 의미를 갖는다 본 연구에서는 원가계산에 의한 예정가격 산정시 문제점인 획일적인 비율적용에 의한 기존 간접노무비율 산정기준의 문제점을 완성공사 원가구성 분석자료를 통해 고찰한다. 이상의 분석자료를 바탕으로 합리적인 건설공사 간접노무비율의 산정방법 및 기준을 제시하여 실제공사의 예정가격 작성시 의사결정을 돕고자 한다.

  • PDF

일반건설업의 직접시공과 하도급시공의 공사원가 및 수익성 비교분석 (The Analysis about Construction Costs and Profitability of Direction between Subcontracting Construction in General Construction Industry)

  • 황욱선;이현숙
    • 산학경영연구
    • /
    • 제19권1호
    • /
    • pp.25-34
    • /
    • 2006
  • 직접시공이나 하도급시공은 건설산업기본법에 의해 정한 시행령에 따라 시공하는 것이 원칙이나 직접시공이나 하도급시공시 수익성을 비교하여 이익 창출을 극대화하는 방향으로 의사결정이 된다. 이 연구에서는 민간공사 사례를 바탕으로 직접시공과 하도급시공의 공사원가와 수익성을 비교분석하였다. 자료 수집은 S건설에서 2002년과 2003년에 공사한 근린생활 및 단독주택을 토대로 하였다. 공사건수의 사례는 직접시공과 하도급시공 각각 3건의 공사에 의한 평균비율 값에 의하여 비교분석하였다. 이 연구의 사례를 분석한 결과, 공급가액 대비 매출총이익에 대한 수익률은 하도급시공이 직접시공 보다 1.3% 높은 수익률을 올린 것으로 분석되었다. 영업이익에 대한 수익률은 하도급시공이 직접시공보다 2.3% 높은 수익률을 올린 것으로 분석되었다. 마지막으로 하도급시공(영업이익률 11.7%)이 직접시공 공사에 대해 4대 보험료 차감후의 최종 영업 이익률이 4.4% 더 많이 발생한 것으로 분석되었다. 그러므로 건설회사는 하도급을 주는 것이 수익률이 높다는 것을 알 수 있고, 노무자 관리 또한 용이한 것으로 나타났다.

  • PDF

공동주택 슬래브 두께변화에 따른 공사비 증가 산정 평가 - 바닥충격음 법제화 시행에 따른 표준바닥구조를 중심으로 - (An Evaluation on a calculation the increased cost of construction according to the Depth change of Concrete Slabs in Apartment Building by executing the law of floor impact sound)

  • 이원열;정상민;신덕
    • 한국건축시공학회지
    • /
    • 제5권2호
    • /
    • pp.161-166
    • /
    • 2005
  • This study is to evaluate on the increased cost of construction according to the depth change of concrete slabs in apartment building. When we increased the depth of concrete slab from 150mm to 180, 210mm, the qualitative and cost of construction were calculated by the high-rise type, the unit-size type. As a result of this study, in 32 Pyong type, increment of construction cost rate appeared by $5.1\%$ in case of increase from slab 150mm to 180mm, and $10.0\%$ in case of increase from slab 150mm to 210mm. In 45 Pyong type, Increment of construction cost rate appeared by $5.7\%$ in case of increase from slab 150mm to 180mm, and $10.2\%$ in case of increase from slab 150mm to 210mm. In 55 Pyong type, Increment of construction cost rate appeared by $2.4\%$ in case of increase from slab 150mm to 180mm, and $8.9\%$ in case of increase from slab 150mm to 210mm.

공공건축물 실적자료 분석에 따른 중위수를 활용한 총공사비의 적정보정율 추정방법 (Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings)

  • 임진호;박준모;김옥규
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.415-422
    • /
    • 2014
  • 본 연구는 공공건축물의 실적공사비 분석을 통해 총공사비에 대한 적정보정율을 기초자료로 제시하고자 한다. 이에 대해 조달청에서 발주한 2009~2011년에 준공된 53개 프로젝트를 연구 대상으로 하였다. 공사비 분석은 주요 공정인 건축, 기계, 전기, 통신, 부대시설에 대하여 빈도론적 관점에서 중위수를 활용한 절대오차율을 기반으로 총공사비에 대해 비교 분석하였다. 이를 통해 적합회귀모형을 선정하고 보정율을 책정하였다.

건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안 (The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris)

  • 이희선;김동식
    • 한국재난정보학회 논문집
    • /
    • 제4권1호
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

해외 건설엔지니어링분야 대가기준 사례분석을 통한 개선방향 마련 (The Establishment of Improvement Direction through Case Analysis of Cost Standards in Overseas Construction Engineering)

  • 고현아;한재구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.165-166
    • /
    • 2020
  • The standard for the cost calculation in the field of domestic construction engineering can be largely divided into the construction cost ratio method and the actual cost addition method. However, the standard for calculating the cost of the construction cost ratio method is a trend to switch to the actual cost addition method due to limitations such as not reflecting the characteristics of the construction. Therefore, this study aims to derive implications by investigating and analyzing examples of cost standards in the field of overseas construction engineering, such as the United States, and deriving directions for improvement in domestic cost standards in the future.

  • PDF