• Title/Summary/Keyword: Construction Cost Estimation System

검색결과 181건 처리시간 0.024초

오브젝트-파라미터 통합 오피스 마감공사비 개산견적 모델 (Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs)

  • 박성호;구교진;박성철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.159-165
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The Object-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by object supplementary and parameter work item. This research presents the Integrated Object-Parameter Schematic Estimation Model in the design development stage that can lead to more accurately estimate the cost through analyzing historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item using regression analysis. In addition, a case study is performed for the effectiveness as comparing the proposed model with the previous estimating model.

  • PDF

Cost Normalization Procedure for Phase-Based Performance Measurement

  • Choi, Jiyong;Yun, Sungmin;Oliveira, Daniel;Mulva, Stephen;Kang, Youngcheol
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.72-76
    • /
    • 2015
  • Capital project benchmarking requires an effective cost normalization process to compare cost performance of projects accomplished in different time and location. Existing cost normalization approaches have been established based on the assumption that all required information for cost normalization is fully identified once a project is completed. Cost normalization, however, is sometimes required to evaluate phase-level outcomes of an ongoing project where the required information is not fully available. This paper aims to provide a cost normalization procedure for phase-based performance assessment. The procedure consists of three normalization steps: currency conversion, location adjustment, and time adjustment considering various scenarios where the required information is not fully identified. This paper also presents how the cost normalization procedure has been applied to the 10-10 Performance Assessment Program, which is a phase-based performance assessment system developed by the Construction Industry Institute (CII). Both researchers and industrial professionals can apply the cost normalization procedure to studies and practices regarding to cost estimation, feasibility analysis, and performance assessment.

  • PDF

추계적 EVMS 기반 예비비 산정 방법론 (Contingency Estimation Method based on Stochastic Earned Value Management System)

  • 곽한성;최병윤;이창용;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.72-73
    • /
    • 2018
  • The accuracy of contingency estimation plays an important role for dealing with the uncertainty of the financial success of construction project. Its' estimation may be used for various purposes such as schedule control, emergency resolve, and quality expense, etc. This paper presents a contingency estimation method which is schedule control specific. The method 1) implements stochastic EVMS, 2) detects a specific timing for schedule compression, 3) identifies an optimal strategy for shortening planned schedule, 4) finds a probability density function (PDF) of project cost overrun, and 5) estimates the optimal contingency cost based on the level of confidence. The method facilitates expeditious decisions involved in project budgeting. The validity of the method is confirmed by performing test case.

  • PDF

사업기획단계에서의 현수교의 물량추정을 위한 모델연구 (Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage)

  • 박원태;천경식
    • 복합신소재구조학회 논문집
    • /
    • 제6권4호
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

실적공사비 산정시스템에 관한 연구 - 공동주택을 중심으로 - (A Study on the Construction Cost Estimating System based on Historical Data in Apartment Housing)

  • 전석한;최인성
    • 한국건축시공학회지
    • /
    • 제5권1호
    • /
    • pp.111-121
    • /
    • 2005
  • This study purposed to derive a model to estimate appropriate construction costs for the application of the estimation system based on historical construction data. For this purpose, it analyzed data ($1999\sim2004$) on the construction costs of reinforced concrete apartments (Long-Lamina-type apartments), which have been highly standardized and have a lot of relevant objective data using statistical analysis techniques and developed an estimation model.

택지개발사업의 공공주택건설공사비 추정의 실증적 분석 (An Empirical Analysis on the Presumption of Public Apartment's Construction Cost in Housing Land Development Project)

  • 김성희
    • 한국건설관리학회논문집
    • /
    • 제12권2호
    • /
    • pp.81-88
    • /
    • 2011
  • 최근, 공공주택에 대한 소비자의 요구사항이 더욱 다양해지는 반면, 이를 공급하는 공급자 입장에서 개발사업의 불확실성은 상대적으로 증가되고 있어 건설공사 예정가격의 불확실성을 더욱 가속시키는 요인으로 작용하고 있다. 이에 본 연구는 택지개발사업 공공주택건설공사의 사업초기단계에서 공사비를 합리적으로 추정하여 발주자 입장에서 적정한 자금 투자계획 마련과, 공사수행 전반의 원가관리를 지원할 수 있는 신뢰성 있는 도구 개발을 목적으로 하였다. 2007년 상반기에서 2008년 상반기에 설계된 총 20개 공공아파트 단지를 사례로 하여 회귀분석을 실시하였다. 사례의 대표성 및 설명력을 높이기 위해 건축, 기계, 토목, 승강기, 조경, 전기, 통신공사의 단지 내 총공사금액을 합산하여 1개 표본으로 활용하였다. 또한 모형의 적합성과 실제 활용도를 높이기 위해 총공사비를 설계, 계약, 준공금액으로 구분하여 분석을 다양화 하였다. 개발모형을 실제공사비와 검증한 결과 총공사비를 준공, 설계 금액으로 설정한 추정모델은 오차율 2%이내의 매우 우수한 결과를 보였다. 본 연구를 통해 개발한 공사비 추정모델은 사업초기단계에서 소수의 데이터만으로 실제공사비에 근접하게 개략공사비를 추정할 수 있는 유용한 도구로 활용되리라 기대한다.

도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축 (An Estimation Model of Historical Cost Using BIM Library for Road Project)

  • 문현석;주기범
    • 한국CDE학회논문집
    • /
    • 제20권4호
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

시스템 다이내믹스를 이용한 터널공사비 모델 개발 (Development of Tunnel Construction Cost Model Using System Dynamics)

  • 박용우;박희성
    • 한국콘텐츠학회논문지
    • /
    • 제12권4호
    • /
    • pp.468-475
    • /
    • 2012
  • 도로건설공사의 주요 구조물인 터널의 경우 건설지역, 지반 환경, 공법 등 다양한 변수에 의해 공사비가 결정된다. 그러나 NATM 터널 초기 공사비를 결정하기 위한 모델에 대한 연구는 부족한 실정이다. 따라서 본 논문은 시스템 사고를 활용하여 터널공사비 예측을 위한 모델을 제시하였다. 기존 문헌 조사를 통해 터널공사비의 영향요인을 파악하고 영향 요인간 상관관계를 고려하여 터널공사비 인과지도를 작성하였다. 그리고 터널공사의 내역서를 활용하여 터널 길이와 굴착량, 암질 등에 의한 터널공사비 변화정도를 분석하였다. 본 연구를 통해 다양한 영향요인을 고려한 NATM 터널공사비 예측에 대한 대안을 제시할 수 있을 것으로 기대한다.

A Proposal of Repair Cost Estimating Criteria for Persistent Defects in Apartment Houses

  • Lee, Hae-Jin;Lim, Nam-Gi
    • 한국건축시공학회지
    • /
    • 제11권6호
    • /
    • pp.597-608
    • /
    • 2011
  • 공동주택의 건설 분쟁(Claim)발생 시 지속적으로 발생하는 하자의 보수비용 산정 방안에 대한 객관적 기준이 없어 건설전문가들도 각자의 경험과 성향에 따라 다양하게 판단하게 되므로 문제점을 발생 시키고 있다. 따라서 본 연구에서는 이에 대한 분석을 통하여 보수비용 산정기준과 방안을 제시한 후 건축물 하자관련 담당자들에게 합리적인 하자 판단기준을 제안 하고자 한다. 연구결과, 실적공사비를 우선 적용하며 실적공사비에 없는 항목은 표준품셈을 활용하여 산정한다. 지속형 하자 유형인 법규위반 하자의 보수비용 산정은 위반 건물부위만 철거하여 재시공하는 비용을 산정하고, 진행성(확대)하자는 건물 준공의 경과연수에 비례하여 기여율로 산정하며, 반복성 하자는 하자를 최소화시키는 방법의 설비공법을 대안으로 강구하여 산정하고, 가치감소 하자는 내용연수대비 하자보증기간의 비율로 산정하는 방법을 제안하였다. 이중 가치감소하자 보수비용의 산정은 향후 보다 많은 연구가 필요할 것으로 사료된다.

BIM기반 건축물 수선교체비 산정 프로세스 (BIM-based Repair&Replacement (R&R) Cost Estimating Process)

  • 박지은;유정호
    • 한국건설관리학회논문집
    • /
    • 제17권2호
    • /
    • pp.31-38
    • /
    • 2016
  • 건설사업비 중 건축물의 유지관리비용이 차지하는 비중이 초기투자비만큼이나 상당하며 국내의 경우 건설공사의 생애주기비용(LCC)관점에서 설계VE검토 업무를 시행하고 있다. 건설산업의 정보화와 고도화 급속히 진행됨에 따라 BIM에 대한 관심이 고조되고 있다. 2012년부터 조달청은 500억원 이상인 공공공사에 BIM적용을 의무화를 시작으로 2016년부터 조달청이 발주하는 모든 공공공사에 BIM적용이 의무화된다. 건축설계의 패러다임이 2D방식에서 3D, 데이터관리 관점의 BIM으로의 전환이 정책적으로 이루어지고 있는 환경에서, LCC측면에서의 BIM활용에 대한 연구는 미흡한 실정이다. 특히, LCC분석 요소 중 하나인 수선교체비 산정을 위한 BIM 소프트웨어는 부재하며 상용화된 BIM저작도구에서 수선교체비 산정을 위한 정보의 전달이 부족하다. 따라서 본 연구에서는 데이터 표준 포맷인 IFC기반 수선교체비 산정을 위한 프로세스를 제안한다. 먼저, 현재 존재하는 수선교체 기준을 분석하고 BIM기반 수선교체비 산정 요구정보를 정의한다. 정의된 요구정보는 각 정보에 해당하는 IFC를 통해 추출되고, BIM기반 수선교체비 산정 요구정보 DB에 저장된다. 이는 외부 DB인 수선교체기준DB와 단가DB와 연계하여 수선교체비를 산정한다. 본 연구가 제시하는 프로세스를 통해 BIM환경에 대응하여 BIM모델을 활용한 수선교체비 산정의 효율화를 기대하며 수선교체비 뿐만 아니라 초기공사비, 에너지비용, 유지관리비용에 이르기까지 향후 LCC분석 요소에 확장하여 적용이 가능할 것이며 BIM기반 LCC분석의 표준화에 기여할 수 있다.