CRITICAL FACTORS FOR ASSESSMENT OF BIM BASED QUANTITY-TAKE OFF

  • Seong-Ah Kim;Chang-Hee Lee ;Sangyoon Chin;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.7-11
    • /
    • 2011
  • Quantity take-off (QT) is one of the most important tasks for determining the total cost of a construction project, and it requires accuracy and reliability for the result. Accuracy and reliability in BIM-based QT are also required to assure the completeness of the result. However, there has been no basis to measure the completeness of the BIM-based QT result. As BIM is increasingly being adopted in the construction industry with a wide variety of purposes, it becomes more important to have a method to improve the completeness of BIM-based QT and criteria to measure it. This research focuses on the hypothesis that the completeness of BIM-based QT relies on the accuracy and reliability of BIM and the BIM-based QT process. As a basic research to determine the completeness of BIM-based QT, this research analyzes and derives factors that affect the completeness of BIM-based QT.

  • PDF

A Study on the Application Method for Recycling Water System (가압형평막(한외여과막)과 자외선 및 오존발생 장치(AOP System)를 이용한 중수설비 적용에 관한 연구)

  • Kim Sang-Sik;Han Mi-Sun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.2 s.20
    • /
    • pp.65-72
    • /
    • 2006
  • The amount of water demand at large buildings is increasing with the concentration of population to city and a rise in the standard of living in the city area. In this reason the Water Shortage is expected and a problem of water pollution by the city sewerage is increasing. One of method of saving city water demand and city sewer is applying recycling water system witch make used water reuse by purification of water. The application of recycling water system witch make used performed since the application of Lotte World Complex. But the popularization of this system is not activated because of cost problem and feeling of people to the water recycled. So in this study, provide application method for recycling water system by propose the estimation method of optimal sizing of recycling water system.

SUSTAINABILITY SOLUTIONS USING TRENCHLESS TECHNOLOGIES IN URBAN UNDERGROUND INFRASTRUCTURE DEVELOPMENT

  • Dae-Hyun (Dan) Koo;Samuel Ariaratnam
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.367-374
    • /
    • 2013
  • Underground infrastructure systems provide essential public services and goods through buried structures including water and sewer, gas and petroleum, power and communication pipelines. The majority of existing underground infrastructure systems was installed in green field areas prior to development of complex urban built environments. Currently, there is a global trend to escalate major demand for underground infrastructure system renewal and new installation while minimizing disruption and maintaining functions of existing superstructures. Therefore, Engineers and utility owners are rigorously seeking technologies that minimize environmental, social, and economic impact during the renewal and installation process. Trenchless technologies have proven to be socially less disruptive, more environmentally friendly, energy conservative and economically viable alternative methods. All of those benefits are adequate to enhance overall sustainability. This paper describes effective sustainable solutions using trenchless technologies. Sustainability is assessed by a comparison between conventional open cut and trenchless technology methods. Sustainability analysis is based on a broad perspective combining the three main aspects of sustainability: economic; environmental; and social. Economic includes construction cost, benefit, and social cost analysis. Environmental includes emission estimation and environmental quality impact study. Social includes various social impacts on an urban area. This paper summarizes sustainable trenchless technology solutions and presents a sustainable construction method selection process in a proposed framework to be used in urban underground infrastructure capital improvement projects.

  • PDF

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

An Ordinary Management System for Updating Construction Equipment Prices in the Poom-Saem Based on the Standard Market Price1 (시가표준액표를 활용한 건설공사표준품셈 건설기계가격 상시관리 시스템 개발)

  • Ahn, Bang-Ryul;Tae, Yong-Ho;Kim, Dae;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.397-404
    • /
    • 2015
  • Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Public construction projects are typically estimated using the Poom-Saem which includes hourly rates for workers and equipments. Despite its importance, the construction equipment cost may not properly reflect the current market value because it is being updated every six years at most. To keep the data for construction equipment cost estimation up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a wide gap to directly adopt the standard market price for updating the construction equipment prices. Therefore, this paper suggests an effective way to develop an ordinary management systems for updating construction equipment prices in the Poom-saem based on the standard market price.

The Study on the System to Estimate the Cost by Using Regression in the Early Stage of the Project (공사 초기단계에서의 회귀분석을 이용한 최종공사비(EAC) 추정 방법)

  • Lee, Youn-Mi;Lee, Man-Hee;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.274-277
    • /
    • 2006
  • The EAC(Estimate at Completion) among existing methods, which estimate cost and time effectively, help managers anticipate changeable several results at the point of $15{\sim}30%$ in the project progress. However, this method may cause such some problems as not to consider the periodically changing circumstances caused by construction risks or uncertainties which can affect the cost and time in the project, and to regard collected and accumulated data only as a single value when predicting the results on the progress. Accordingly, it is very difficult to accept the even small range of variability based on the anticipation of EAC. Consequently, the study focuses on the possibility methodology to anticipate time and cost accurately on the way to utilize EVMS(Earned Value Management System), and also suggest the way to perform the right estimation of EAC as considering various risks and uncertainties in construction projects.

  • PDF

Digital Pen System for Inputting the Actual Amount of Labor Input at Construction Site (건설현장의 실투입 노무량 입력을 위한 디지털펜 시스템)

  • Kim, Daewon;Kim, Tae-Yong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.133-140
    • /
    • 2016
  • The amount of labor input in a construction project is used as source data to estimate construction cost and to understand the productivity of the construction industry. However, there is a significant difference between the standard of estimation and the actual amount of labor input, and a plan is needed to resolve this problem. For this reason, to establish a system with which the actual amount of labor input can be inputted in a more accurate and simpler manner, a new method is proposed in this study. In the new method, a digital pen is used to minimize the difference from traditional handwriting on paper using a pen, and eliminate the redundant input of information. This study is expected not only to reduce the actual amount of labor input but also to contribute to the productivity of construction cost estimate through the sharing or utilization of the information on the web.

Direction of Selecting the Alternative considered Correlation between Building Systems in Remodeling Design Process (리모델링 설계단계에서 건축시스템 상관관계를 고려한 대안선정 방안)

  • Lee Dong-Jun;Park Chan-Gil;Park Sang-Jun;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.415-418
    • /
    • 2002
  • As Remodeling is proceed in the limited condition that is utilization of existing resource, the selection of remodeling objects and scope are affected by the correlation of building systems. Unexpected problems have occurred in construction phase by lack of the consideration about correlation of building systems; increasing of cost, delaying of schedule etc. Therefore, this research suggests the Building System Correlation Diagram Model and the direction of cost estimation .for selecting alternative reasonably in remodeling design process.

  • PDF

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.

Development on the Computerizing Assessment System Model for DSM Investment Programs (수요관리투자사업 평가용 전산화 모델개발)

  • Lee, Sang-Seol;Lee, Chan-Seob;Cho, Sung-Hwan;Park, Sang-Yong
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.249-255
    • /
    • 2008
  • This paper developed the computerizing assessment system modeling of the natural gas and district heating DSM programs. It constructed as each project in accordance with the business investment plans & assessment DB, related M&V data DB and cost-effectiveness analysis data DB. It is composed of total 58 tables which are 22 tables which are used in the plan and the assessment, 16 tables which are used in the cost-effectiveness analysis, 18 tables which are used in the M&V, table which is used in qualitative evaluation, as by each programs. This computer programs can contributed to DSM business investment system construction as implementing for algorithm development and an estimation by each programs.

  • PDF