Deriving Key Risk Sub-Clauses for EPC/Turnkey Contract Conditions for Overseas Construction Projects - Based on FIDIC Conditions of Contract for EPC/Turnkey Projects, second edition 2017 - (해외건설공사 EPC/Turnkey 계약조건 핵심 리스크 세부조항 도출 - FIDIC Silver Book 2017년 개정판 기준으로 -)

  • Hong, Seong Yeoll;Jei, Jae Yong;Seo, Sung Chul;Park, Hyung Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.101-110
    • /
    • 2022
  • Recently, the global construction market is expected to grow at an annual average of 4.8% by 2025 and the risk of overseas construction is also expected to increase accordingly. In particular, domestic construction companies intensively participated in the EPC(Engineering, Procurement, Construction)/Turnkey project, but as a result of failing to respond to contractual risks, they have suffered losses of trillions of won in overseas business since 2013. Nevertheless, there have been not many studies on the derivation of EPC/Turnkey's contractual key risk sub-clauses. Therefore, in this study, the key risk sub-clauses were studied for the conditions of the 2017 Silver Book contract issued by the International Consulting Engineering Federation(FIDIC). To this end, 30 experts with more than 10 years of experience in international construction contracts were formed as a panel to conduct a Delphi survey on 170 sub-clauses of 21 clauses of FIDIC Silver Book to derive 62 main risk sub-clauses. In addition, the RPN(Risk Priority Number) was finally calculated using the FMEA(Failure Mode and Effect Analysis) technique, and 25 key risk sub-clauses within the Critical Risk range were derived. Through the results of this study, the practical point of view is able to refer to the contract provisions to be carefully reviewed at the bidding and contract signing stage in overseas construction projects. From an academic point of view, it provides direction and basic knowledge of how to study the contract fields used in overseas construction EPC/Turnkey projects.

Guidelines for Provisional Sum in Public Construction Projects (국내공공공사의 잠정금액(Provisional Sum) 집행기준)

  • Lee, Jae-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.157-165
    • /
    • 2005
  • Recently, the term 'Provisional Sum(PS)' has been used in domestic public construction projects especially for civil works. Nevertheless, the guideline for PS has not been clearly stipulated in contract documents or construction-related laws. Due to these ambiguous contract situations, disputes between owners and contractors are surely expected to settle down PS in construction projects. This paper focused on suggesting a guideline to settle down PS in these ambiguous contract situations. The guideline suggested in the paper is expected to be used as a reasonable method to settle down PS avoiding nonproductive disputes about PS in construction projects

A Study on the Liability of the Builder in the Shipbuilding Contract and Products Liability. (선박건조계약상 건조자책임과 제조물책임)

  • Jeong, Seon-Cheol
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2005.11a
    • /
    • pp.92-93
    • /
    • 2005
  • A contract for the shipbuilding is usually a complicated and involves statement of rights, obligations and responsibilities which each party agrees vis-a vis the other. The ultimate purpose of the contract is the sale and transfer of the finished ship by the builder to the buyer. Contracts for the construction and sale of ships are categorized as contracts for the sale of goods under English, United States, Germany and some countries law. On the other hand, The shipbuilding contract may be classified, not as a contract of sale but as a contract for work and materials under Korea, Japan and some countries law. Especially, most of countries are now well settled with regard to liability of a manufacturer in tort for physical injury and on the other for pure economic loss to remote owners of chattels. Where there is either a breach of contractual warranty or an implied warranty, there may be admiralty jurisdiction, depending once again on the situs of the event and its relationship to traditional maritime activity. Contract principles will be applied to the first type of warranty and tort principles will be applied to the second. First of all, this thesis is dealt with the contents of contract under English Law. Secondly, this thesis is analysed into the liability of shipbuilder in Products Liability under English, American and Korean Law comparisons. In conclusion, the author tries to give some suggestions as countermeasures of Products Liability to the shipbuilder in Korea.

  • PDF

A Comparative Study on a Supplier Credit and a Buyer Credit in International Transactions of Capital Goods - Focusing on Industrial Plant Exports, Shipbuilding Exports, and Overseas Constructions -

  • Kim, Sang-Man
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.48
    • /
    • pp.127-155
    • /
    • 2010
  • The international transactions of capital goods such as industrial plant exports, overseas constructions, and shipbuilding exports, are so huge that tremendous amount of funds are required, and that most of the loans are long-term credits of over five years. In the export of huge capital goods, financing is more crucial than technology itself. Some of the importing countries are developing ones that are politically and economically unstable. Therefore the financing mechanism for these transactions is conclusive in winning these projects. Global financial market instability caused by US sub-prime mortgage financial crisis expanded all over the world, and the international transactions have been decreased due to global credit crisis. This indicates how much influential the financing market is in international transactions. The financing schemes are classified into supplier credit and buyer credit by who provides the financing. A supplier credit is a credit extended by an exporter(seller) to an importer(buyer) as part of an export contract. Cover for this transaction may be extended by an export credit agency('ECA') to the exporter. In a sales contract a seller shall provide fund required to manufacture goods, and in a construction contract a contractor shall provide fund required to complete a construction. A buyer credit is an arrangement in which an exporter enters into a contract with an importer, which is financed by means of a loan agreement A Comparative Study on a Supplier Credit and a Buyer Credit in International Transactions of Capital Goods 155 where the borrower is the importer. In a sales contract a buyer shall provide fund required to manufacture and procure the goods, and in a construction contract an owner shall provide fund required to complete a construction. Therefore an exporter is paid on progressive payment method. A supplier credit and a buyer credit have their own advantages and disadvantages in the respect of the parties respectively. These two financing methods are selectively used considering financing conditions such as funding cost, importer's and/or exporter's financial conditions, importing country's political risk.

  • PDF

A Study on the Contractor's Liability for Defect in Public Construction Project - through comparing Civil Law with Government Contract Law - (공공건설사업 하자에 대한 수급인의 책임에 대한 연구- 민법과 국가계약법령의 비교를 통하여 -)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.69-79
    • /
    • 2001
  • Characteristics of Contactor's Defect Liability was too many discussed. But it's not clearly defined yet. Because recent Government Construction Projects are very complex and executed through long time, too many conflicts were appeared related to Contactor's Defect Liability. Therefore to analyse and to resolve the conflicts legal aspects of Contactor's Defect Liability stated in Civil Law and Government Contract Act was systematically compared. The result of this research is as follows : (1) Characteristic of Contactor's Defect must be regarded as a breach of Contract and be an incomplete contract implementation. (2) To decide the range of Damage, Characteristic of Defect must be regarded. (3) Contactor's Defect Liability must be effectual from the day of delivery. (4) Retainage must be added to secure the completion during the Contract Period and Defect Repairing Liability must be omitted in the Contract performance Security.

  • PDF

Case Study in Current State of Amount of Order for Turnkey Project (설계 $\cdot$ 시공일괄입찰제도의 수주현황 사례분석)

  • Lee Yang-Kyoo;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.197-202
    • /
    • 2004
  • Turnkey contract system is an effective ordering system for the organizations that technical engineers are insufficient in their construction projects. It is possible to reduce project duration and to improve project Quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system in our country. The results includes various methods for improving the system based on the analysis of bid price nd selection procedure.

  • PDF

A Basic Study on the Methodology to Introduce Warranty Contracting for Pavements in Korea (도로포장 성능보증(Warranty) 계약제도 도입방안에 관한 기초연구)

  • Kim, Tae-Song;Seo, Yong-Chil;Lee, Sang-Beom;Koo, Jai-Dong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.66-74
    • /
    • 2008
  • Warranty contracting for pavements construction has been widely used in Europeans countries, Japan, and the U.S. and the benefits of warranty contract has been proven. This research investigated the European, U.S., and Japanese warranty contract policies and compared pros and cons. The most appropriate warranty contract policy solution is developed to fit in the Korean construction industry culture. Three main conclusions have been developed in this study: (1) performance specifications should be developed; (2) the systematic method is required to estimate the appropriate costs of performance bond and warranty period, etc.; and (3) short and long term plans for adopting performance warranty contract in Korea are suggested.

Improvement of contract sum adjustment method caused by price fluctuation using construction cost index (건설공사비지수를 활용한 물가변동에 의한 계약금액 조정방안 개선)

  • Cho Hun-Hee;Doe Geun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.162-168
    • /
    • 2005
  • Index adjusted ratio method has been widely utilized in public construction sector for contract sum adjustment by price fluctuation. In this method, the Production Price Index are used for the base ratio, but the PPI can't reflect the character of construction project in respect of the selected items and weight. In this research we prove the problem of using the index adjusted ration method in contact sum adjustment by price fluctuation, and improve it by using the construction cost index, which has the property of construction project. And we figure out the efficiency of the proposed method by case study.

A Reduction of Claims for Efficient Turn-key Project (효율적인 턴키사업 추진을 위한 클레임 저감방안)

  • Oh, Ye-Keun;Sohn, Jeong-Rak;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.122-130
    • /
    • 2012
  • Currently, TK(Turn-key) projects have been implemented, the projects on TK basis still have shown several problems rather than its own merits as a bidding method. Increasing the number of claims being occurred during construction process of the projects is reality because of unclear notice of tender documents and conditions of the contract, design review system, and decision process of the qualified bidder. To establish desirable TK projects in domestic market, not only should resonable alternatives for carrying out design review system and selecting the bid winner be set up, but also proper standards for reforming irrational system of contract, bid, and notice of tender related to TK projects. This study is intended to reduce the number of claims and implement efficient projects of apartment construction on TK basis by identifying potential problems through analysis of claim examples of TK projects which have difficulties of revising contract agreement such as drawings and suggesting improvement methods for contract conditions and notice of tender docuements.

A Proposal of Improvement Devices for General Conditions of Contract in Claim-related Provisions (공사계약일반조건의 클레임 관련 조항의 개선방향)

  • paik, Hwa-Sook;Yang, Chang-Hyun;Yoon, Ja-Young;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.273-276
    • /
    • 2007
  • Construction work has character which claim or dispute is frequently raised. This means that each construction project has it's own contract documents due to the difference of environment and time. Therefore to overcome the associated risks, domestic contract rules and acts should be reformed. Several well-recognized contract documents developed by FIDIC, AlA, CMAA and general conditions of the contract is investigated and analyzed. Based on the research outcomes the direction of reformation is suggested.

  • PDF