Guidelines for Provisional Sum in Public Construction Projects

국내공공공사의 잠정금액(Provisional Sum) 집행기준

  • Published : 2005.10.31

Abstract

Recently, the term 'Provisional Sum(PS)' has been used in domestic public construction projects especially for civil works. Nevertheless, the guideline for PS has not been clearly stipulated in contract documents or construction-related laws. Due to these ambiguous contract situations, disputes between owners and contractors are surely expected to settle down PS in construction projects. This paper focused on suggesting a guideline to settle down PS in these ambiguous contract situations. The guideline suggested in the paper is expected to be used as a reasonable method to settle down PS avoiding nonproductive disputes about PS in construction projects

최근 국내 공공건설사업에 Provisional Sum(이하 PS)이라는 단어를 잠정공사비 또는 미확정설계공종이라 번역하여 적용하고 있으나 PS에 대한 정의 및 집행주체, 정산방법 등에 대한 기준이 계약조항이나 관련법규에서 규정되지 않은 채 적용되고 있어 분쟁이 발생될 가능성이 높다. 본 연구에서는 국내에서 논란이 되고 있는 PS의 정의 및 업무범위, 정산방법 등에 대한 명확하고 설득력 있는 자료 및 사례를 제시함으로써 PS의 집행기준을 제안하고자 하였다. 제안된 집행기준의 도출과정에서 관련법규 및 유권해석 내용과의 부합성을 제시하고 해외공사에서 적용된 사례와의 비교 검토를 통하여 본 기준이 합리적인 해석과 처리방법임을 제시하였다. 연구결과 PS 항목의 집행주체는 발주자이나 별도 발주는 가능치 않으며, PS 항목은 수량과 단가를 모두 정산할 수 있으며, 순공사비에 포함되는 PS 항목에 대해서는 간접비의 적용이 가능하나 물가변동(에스컬레이션)은 적용되지 않는 것이 합리적임을 알 수 있었다.

Keywords

References

  1. 기획예산처, 2005년도 총사업비 관리지침, 2005.4
  2. 김성일.이형찬.김재영, 공공공사의 클레임 실태분석과 개선방안, 국토연구원, 2003
  3. 대우건설, Quantity Surveyor 교육연수보고서, 1994
  4. 박준기, 건설계약영어, 동화기술, 2001
  5. 일간건설신문, 국가계약관계법령, 2004.2
  6. 일간건설신문, 신정부계약 유권해석, 2003,6
  7. 일간건설신문, 지방자체단체 공사계약 유권해석, 2004.3
  8. 정기영, 입찰.계약.클레임론, C&R 연구소, 2001.7
  9. 조달청 계약과, 최저가낙찰제 대상공사에 대한 입찰금액의 적정성심사세부기준, 2004. 3. 9
  10. 현학봉, 건설공사 계약관리와 클레임, 일간건설신문, 2003
  11. John Murdoch, Will Huges, Construction Contracts - Law and management, E&FN SPON, 1992
  12. 大隈ー武, 海外工事請負契約論,商事法務研究會,1991
  13. 平野 實,海外工事の契約紛争と對策,日刊工業新聞社, 1981