• Title/Summary/Keyword: Construction Condition

Search Result 3,663, Processing Time 0.029 seconds

Analyzing on the Fluctuation Characteristics of Management Condition of Construction Company (건설업체 경영상태 변동에 대한 특성 분석)

  • Jang, Ho-Myun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.1118-1125
    • /
    • 2014
  • The past IMF foreign exchange crisis and subprime financial crisis had a big influence on variability of macroeconomics, even if the origin of its occurrence might be different. This not only had a significant infrequence on the overall industries, but also produced many insolvent companies by being closely linked with a management environment of an individual construction company leading the construction industry. The purpose of this research is to investigate characteristics of management condition of construction company according to the size of construction company using KMV model developed on the basis of the Black & Scholes option pricing theory. This research has set 28 construction companies listed to KOSPI/KOSDAQ for applying the KMV model and measuring the level of the default risk of construction companies. The data was retrieved from TS2000 established by Korea Listed Companies Association (KLCA), Statistics Korea. The analysis period is between first quarter of 2004 and fourth quarter of 2010. This research examine characteristics of the level and fluctuation process of the management condition of construction company according to the size of construction company.

A study on application of RFID technology for optimum Processing and management of construction waste (건설폐기물의 적정 처리 및 관리를 위한 RFID기술 적용방안)

  • Lee, Seul-Ki;Jeon, Sang-Min;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.774-780
    • /
    • 2007
  • Occurrence amount of construction waste dominates weight that is the most as 44.6% if examine domestic waste occurrence present condition, scales of construction becomes jumbo gradually depending on social environment that change and occurrence amount of construction waste is steadily increasing real condition. Construction waste processing and recycling expense have held about 0.5% to 1% of whole construction cost, but if do not manage construction waste efficiently in each construction site, ratio that construction waste processing and recycling expense hold in whole construction cost is expected that will rise more. This does hint that environmental harm and economical damage are serious by construction waste. In this study, system is activated in each construction site at information interchange system and waste electron succession and waste government official makes radio frequency realization technology (RFID) purpose suggest plan that can be applied efficiently through example analysis that a RFID technology is already applied by efficiently attained plan.

  • PDF

Study on the Fractures Types of PHC Pile by Impact Load of Follower (보조말뚝의 충격하중에 의한 PHC말뚝의 파손유형 고찰)

  • Seo, Dong-Nam;Choi, Sang-Ho;Kim, Jin-Sik;Kim, Min-Kab;Lee, Dong-Hyeon;Cho, Seong-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.144-145
    • /
    • 2021
  • This study analyzed the cases of cracks in piles due to the use of followers under construction conditions where water exists inside the piles, and confirmed whether the piles were cracked through a field test simulating the construction conditions in which water pressure inside the piles was generated by a hammer. According to the construction case, under the construction condition where the pile length is 20% to 30% shorter than the drilled length, about 80% cracks occur, so there is a high possibility of cracking due to water inside the pile. A field test was conducted to confirm the type of pile failure due to hammer under the construction condition in which water exists inside the pile. The pile head was not destroyed by the compressive load, and one or more longitudinal cracks occurred along the PC steel wire. The closed end pile generates water pressure by hammer. the follower and cushion(compression plywood) must be drilled at least 0.4D. It is expected that improved quality control will be possible as the water pressure inside the pile is reduced.

  • PDF

Improvement on the Non-standardized Name Use of Chinese Granite for Korean Building Constructions (건축공사용 중국산 화강석의 명칭혼란 개선방안)

  • Kim, Jae-Yeob;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.81-87
    • /
    • 2015
  • The purpose of this study is to analyze the problem of confusing the names of Chinese granite used in Korean construction work and suggest the improvement plans for them. Interviews of the experts from the stone company, studies on the existing research literature, and analyses of construction work documents of the 23 construction works which used Chinese granite were carried out to analyze the real condition of name confusion of granite stone. In the analytical result of the real condition, name confusion was classified into 4 types and problems derived from it were done into 4 ones. An additional survey was carried out targeting 34 masonry experts to draw the improvement plans based on the analytical results of the real condition of name confusion. The results show that the most fundamental solution is to continue to make efforts to use exact names when main agents related to construction works communicate with each other regarding Chinese granite stone and the process to make out construction contract documents.

Numerical Evaluation of Tidal Characteristic Changes after Saemangeum Sea-dike Closing (수치모형(數値模形)을 이용(利用)한 새만금 방조제(防潮堤) 축조후(築造後)의 조석(潮汐) 운동(運動) 예측(豫測))

  • Park, Chang-Kyu;Lee, Nam-Ho
    • Journal of Korean Society of Rural Planning
    • /
    • v.7 no.1 s.13
    • /
    • pp.61-76
    • /
    • 2001
  • During the performance of large scale tidal land reclamation project along the coast line, the construction of large scale structures such as sea-dikes, closing estuaries will induce big changes of near-shore hydraulic behavior. In this paper, its is aimed to verify the change of tide and currents after the construction of sea-dike of the Saemangeum project along the coast line. Numerical scale model "TRISULA" which development by Delft Hydraulics in the Netherlands was used. "TRISULA" is adopting the finite difference numerical scheme, and mostly using for hydro-dynamic solution along the sea and estuaries. Model boundary is covering $100{\times}170$ Km and constructed with $133{\times}337$ grids. Outer side boundary is divided 48 sections, and input 37 tidal components are gained from another big scale numerical "Yellow Sea" model. Model calibrations & verifications were performed th field tide & current datas which were measured along sea-dike alignment during Aug. $1997{\sim}Apr$. 1999. And then, numerical simulation with the tide condition dated 17 Apr. 1999 was performed with & without sea-dike construction condition for the comparison. Evaluated boundary is 20 km out-side from sea-dike alignment. Four cross lanes were set up, each of lane contains 3 points, for the comparison of sea-dike construction effects. Results showing the tidal amplitude is reducing approximately 20 cm after the construction of sea-dike during spring tide condition, amplitude 6.9m. Currents after construction of sea-dikes along the alignment, the northern part shows 50%(inner), 90%(outer) and the southern part shows 10%(inner) 50%(outer) of the currents before construction.

  • PDF

A Study for Determining the Rehabilitation Method Group using NHPCI on Asphalt Concrete Pavement of National Highway (국도 아스팔트 포장의 NHPCI(National Highway Pavement Condition Index)를 활용한 보수공법그룹 결정에 관한 연구)

  • Son, Hyeon Jang;Kwon, Soo-Ahn;Lee, Jae Jun;Baek, Cheolmin;Lim, Jae Kuy;Sin, Hyun Jin
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.1-9
    • /
    • 2013
  • PURPOSES : The PMS(Pavement Management System) has been utilized in order to efficiently allocate the limited budget for the maintenance of national highway system. In the PMS of national highway, surface pavement condition is evaluated by using the VI (Visual Index). However, the VI is determined only by considering the cracking rate (%) and rut depth (mm), which is not reflecting the IRI (International Roughness Index) that is known as an important factor of pavement performance. In this study, the NHPCI (National Highway Pavement Condition Index) which includes the cracking rate (%), rut depth (mm), and IRI (m/km) is suggested for determining the rehabilitation methods group. METHODS : First, the rehabilitation methods performed between 2008 and 2010 on the national highway is classified and then, NHPCI is determined for each rehabilitation method. Next, the NHPCI for each rehabilitation method is grouped through the interval estimation of the population mean and T-test analysis. RESULTS : According to NHPCI range, the rehabilitation methods are divided into four categories: Not Required, Preventive Maintenance, Overlay Treatment (with or without cutting), and Full-scale Treatment (i.e., reconstruction). CONCLUSIONS : Based on this study, it is recommended that the appropriate NHPCI range should be determined through the combination of the rehabilitation categories and Decision Procedure of Pavement Distress Condition Visual Index.

Developing noise prediction software for Improvement of the construction noise management (공사장 소음 관리 효율화를 위한 소음예측프로그램 개발)

  • An, Jang-Ho;Lee, Jun-Seo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.155-156
    • /
    • 2009
  • Construction companies can easily understand present noise condition of their construction site via C-Noise. C-Noise is noise simulation software that simple to use. Construction companies spend time and cost for public complaints about construction noise. Construction site noise management using noise simulation software like C-Noise can reduce public complaint. achieve cost reduction to treat it.

  • PDF

A Study on the Efficient Technical Assistance for Small-sized Construction Sites (소규모 건설현장의 효율적인 기술지원 방안 연구)

  • Lee, Gi-Tae
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.72-76
    • /
    • 2006
  • This study deals with problems of technical assistance through accidents analysis and questionnaires on small-sized construction sites which are difficult to understand real condition and administrate legally and indicated following efficient methods of technical assistance. (1) Ensuring access to the small-sized construction sites. (2) Delegation technical assistance service to civilian and supporting selected. (3) Raising of the person's safe consciousness concerned with the small-sized construction sites. (4) Safety consulting for the head office of small-sized construction sites.

A Study on the Change of Physical Capability of Waterproofing Layer after the Application of Static Load and Moving Load to a Non-Exposed Type Waterproofing Layer (비노출 방수층에 작용하는 정하중과 동하중 작용 후의 방수층 물성변화에 관한 연구)

  • Seon, Yun-Suk;Kim, Jin-Seong;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.141-145
    • /
    • 2007
  • The part in the structure that is most affected by changes of external temperature is the protective concrete layer that protects a waterproofing layer. Also, the waterproofing layer that is situated under or on the back of such a protective concrete layer is affected by temperature and the behavior of the protective concrete layer under the condition of consolidation or close adhesion. In particular, in many cases, the damage is serious mainly around the projection (such as a parapet), crack, and joint (expansion joint). However, there is no proper way of examining again the non-exposed waterproofing layer once it has been constructed. Therefore, there is an assessment only on the physical property of materials and the capability of the layer in construction, and there is no actual assessment in consideration of its environmental condition or the condition of the use of buildings after construction. Therefore, in order to create more pleasant buildings and to enhance the durability of structures, this study conducts research into the change of capability of non-exposed waterproofing material after the application of a static load and moving load on the waterproofing layer situated under or on the back of protective concrete.

  • PDF

An experimental evaluation of hardened property of concrete using early-strength-binder with curing temperature (조강형 결합재를 사용한 콘크리트의 양생온도에 따른 경화특성 실험적 평가)

  • Kim, Kwang-Ki;Kim, Young-sun;Lee, Joo-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.88-89
    • /
    • 2015
  • In cold weather, the speed of concrete strength development is slow. As a result, construction speed becomes slow and it is problem for all construction site to solve this. So in this study, to shorten removing frame time after placing concrete, mix proportion using early-strength-binder(ESB) and curing method such as using heat line in concrete was considered. At first, concrete mix proportion was examined at -5℃ temperature between ordinary portland cement(OPC) and ESB. And second step, concrete, using mix proportion with OPC, was examined according to curing method(: 1) heat line used and 2) no heat line) and kinds of form (: 1) Deck slab, 2) Half PC slab and 3) SOG slab). All cases are same condition: slab thickness is 1,500mm, double-bubble sheet is used as a curing sheet after placing concrete. After the test, OPC is enough to get strength compared to ESB in special condition and 48~60 hours is needed according to form condition.

  • PDF