Investigation of three-dimensional deformation mechanisms of existing tunnels due to nearby basement excavation in soft clay

  • Wanchun Chen;Lixian Tang;Haijun Zhao;Qian Yin;Shuang Dong;Jie Liu;Zhaohan Zhu;Xiaodong Ni
    • Geomechanics and Engineering
    • /
    • 제34권2호
    • /
    • pp.115-124
    • /
    • 2023
  • By conducting three-dimensional simulation with consideration of small-strain characteristics of soil stiffness, the effects of excavation geometry and tunnel cover to diameter ratio on deformation mechanisms of an existing tunnel located either at a side of basement or directly underneath the basement were systematically studied. Field measurements were used to verify the numerical model and model parameters. For basement excavated at a side of an existing tunnel, the maximum settlement and horizontal displacement of the tunnel are always observed at the tunnel springline closer to basement and tunnel crown, respectively, regardless of basement geometry. By increasing basement length and width by five times, the maximum movements of tunnel located at the side of basement and directly underneath the basement increase by 450% and 186%, respectively. Obviously, tunnel movements are more sensitive to basement length rather than basement width. For basement excavated at a side of an existing tunnel, tunnel movements at basement centerline become stable when basement length reaches 10 He (i.e., final excavation depth). Moreover, tunnel heaves due to overlying basement excavation become stable when the normalized basement length (L/He) is larger than 8.0. As tunnel cover to diameter ratio varies from 2.5 to 3.0, the maximum heave and tensile strain of tunnel due to overlying basement excavation decrease by up to 41.0% and 44.5%, respectively. If basement length is less than 8 He, the assumption of plane strain condition of basement-tunnel interaction grossly overestimates tunnel movements, and ignores tensile strain of tunnel along its longitudinal direction. Thus, three-dimensional numerical analyses are required to obtain a reasonable estimation of tunnel responses due to adjacent and overlying basement excavations in clay.

Structural monitoring of movable bridge mechanical components for maintenance decision-making

  • Gul, Mustafa;Dumlupinar, Taha;Hattori, Hiroshi;Catbas, Necati
    • Structural Monitoring and Maintenance
    • /
    • 제1권3호
    • /
    • pp.249-271
    • /
    • 2014
  • This paper presents a unique study of Structural Health Monitoring (SHM) for the maintenance decision making about a real life movable bridge. The mechanical components of movable bridges are maintained on a scheduled basis. However, it is desired to have a condition-based maintenance by taking advantage of SHM. The main objective is to track the operation of a gearbox and a rack-pinion/open gear assembly, which are critical parts of bascule type movable bridges. Maintenance needs that may lead to major damage to these components needs to be identified and diagnosed timely since an early detection of faults may help avoid unexpected bridge closures or costly repairs. The fault prediction of the gearbox and rack-pinion/open gear is carried out using two types of Artificial Neural Networks (ANNs): 1) Multi-Layer Perceptron Neural Networks (MLP-NNs) and 2) Fuzzy Neural Networks (FNNs). Monitoring data is collected during regular opening and closing of the bridge as well as during artificially induced reversible damage conditions. Several statistical parameters are extracted from the time-domain vibration signals as characteristic features to be fed to the ANNs for constructing the MLP-NNs and FNNs independently. The required training and testing sets are obtained by processing the acceleration data for both damaged and undamaged condition of the aforementioned mechanical components. The performances of the developed ANNs are first evaluated using unseen test sets. Second, the selected networks are used for long-term condition evaluation of the rack-pinion/open gear of the movable bridge. It is shown that the vibration monitoring data with selected statistical parameters and particular network architectures give successful results to predict the undamaged and damaged condition of the bridge. It is also observed that the MLP-NNs performed better than the FNNs in the presented case. The successful results indicate that ANNs are promising tools for maintenance monitoring of movable bridge components and it is also shown that the ANN results can be employed in simple approach for day-to-day operation and maintenance of movable bridges.

응집 pH와 응집제 종류에 따른 Al(III)가수분해종 특성변화에 대한 연구 (A Study of Al(III) Hydrolysis Species Characterization under Various Coagulation Condition)

  • 송유경;정철우;손인식
    • 한국물환경학회지
    • /
    • 제22권5호
    • /
    • pp.958-967
    • /
    • 2006
  • The overall objective of this research was to find out the role of rapid mixing conditions in the species of hydrolyzed Al(III) formed by Al(III) coagulants and to evaluate the distribution of hydrolyzed Al(III) species by coagulant dose and coagulation pH. When an Al(III) salt was added to water, monomers, polymers and solid precipitates may form. Different Al(III) coagulants (alum and PSOM) show to have different Al(III) species distribution over a rapid mixing condition. During the rapid mixing period, for alum, formation of dissolved AI(III) (monomer and polymer) increases, but for PSOM, precipitates of $Al(OH)_{3(S)}$ increases rapidly. During the rapid mixing period, for high coagulant dose, Al-ferron reaction increases rapidly. The kinetic constants, Ka and Kb, derived from AI-ferron reaction. The kinetic constants followed very well the defined tendencies for coagulation condition. For pure water, when the rapid mixing time increased, the kinetic constants, Ka and Kb showed lower values. Also, for raw water, when the rapid mixing time increased, the kinetic constants, Ka and Kb showed lower values. At A/D(Adsorption and Destabilization) and sweep condition, both $Al(OH)_{3(S)}$ and dissolved Al(III) (monomer and polymer) exist, concurrent reactions by both mechanism appear to cause simultaneous precipitation.

벌채지내(伐採地內) 운재로(運材路)의 토양물리성(土壤物理性) 및 식생(植生)의 회복과정(回復過程) - 운재로(運材路) 개설(開設)이후 9년 경과의 경우 - (Progression of Restoration of Soil Physical Properties and Vegetation in Logging Roads - In Case of 9 Years Results after Construction of Logging Road -)

  • 우보명;김경훈;박재현;최형태
    • 한국환경복원기술학회지
    • /
    • 제1권1호
    • /
    • pp.18-27
    • /
    • 1998
  • To investigate the restoration progression on soil physical properties and vegetation at the surface of logging road affected by timber harvesting operation. This study was carried out at logging roads constructed from 1989 to 1994 in Mt. Baekwoon, Kwangyang, Chollanam-do. Judging from the analysis of soil hardness, there were significant changes in the depth of soil between 5 and 10cm. Soil hardness was recovered from the compacted condition to the natural forest condition after 9 years passed. Soil macroporous ratio (pF2.7) of topsoil was higher than that of deep soil. Soil moisture retention of topsoil was more improved than that of deep soil. From the view of soil bulk density, the necessary time for recovering to the undisturbed condition of forest soil was about 10 years in the logging road left. Soil physical properties such as soil bulk density and porous ratio were recovered as time passed. Improved soil physical properties promoted the plant recovery on the logging road surface. The dominant species on the logging roads were Comus kousa, Prunus sargentii as overstory species, Rubus crataegifolius, Lespedeza bicolor as understory species, and Saussurea gracilis, Pteridium aquilinum var. latiusculum as herbaceous species. The plant recovery of bank-slopes was faster than that of cut-slopes and road surface. In progress of year, average plant coverage were 70 to 90% in cut- and bank-slopes and 30 to 60% on the logging road, surface which was elapsed 9 years after logging road construction. Therefore, additional planting and seeding work could be effective to the soil condition and vegetation restoration.

  • PDF

운항조건에서 11,000TEU 컨테이너선의 소요마력 저감을 위한 트림변화 연구 (A Study on Trim Variation to Reduce the Required Power of 11,000TEU Container Ship in Operation Condition)

  • 이준형;천장호;김명수;박범진;유용완;이영연;안해성;김영선;임일진
    • 대한조선학회논문집
    • /
    • 제58권3호
    • /
    • pp.198-205
    • /
    • 2021
  • In this paper, the effect of trim variation on the required power of 11,000TEU container ship was investigated under conditions considering the actual operation speed and draft. For each draft condition, the effective power (PE) and delivered power (PD) trends were investigated with changes in trim and ship speed. At this time, the displacement volume was fixed same as the value of the even trim condition and the both sinkage at the fore and after perpendicular are confirmed. The test ship speeds were determined by considering the operating speed. Both numerical and experimental methods were used to analyze the effects of trim variation. Numerical analysis results were used for evaluating the resistance performance, and the self-propulsion performance was estimated using experimental data obtained from model test.

상재하중의 크기와 이격거리에 따른 강성벽체의 토압분포 (Earth Pressure on a Rigid wall due to Loads Condition and Distance)

  • 오범진;이상덕
    • 한국지반공학회논문집
    • /
    • 제26권12호
    • /
    • pp.51-60
    • /
    • 2010
  • 자중에 의한 토압은 일반적으로 깊이에 따라 선형비례하여 증가되지만, 상재하중에 의해 발생되는 토압은 분포형태와 지반상태 및 경계조건에 따라 다르게 분포한다. 본 연구에서는 변위가 구속된 강성벽체에 연직상재하중에 의한 토압분포를 실험적으로 연구하기 위하여 실내모형토조[30 cm(폭) ${\times}$ 110 cm(길이) ${\times}$ 88 cm(높이)]에 각 2개의 로드셀이 배치된 8개의 토압판으로 구성된 강성벽체를 설치하여 연직상재하중의 크기와 위치(벽체에서 이격거리)를 변화시켜 가면서 토압분포와 토압의 영향범위를 관찰하였다. 실험결과, 연직상재하중에 의해 발생되는 수평토압은 일정위치에서 최대값을 보이고 깊어질수록 감소하여 한계깊이를 초과하면 무시할 만큼 작아졌다. 수평토압이 최대가 되는 깊이와 한계깊이는 연직상재하중의 크기와는 무관하게 벽체와의 이격거리에 따라 다르게 나타났다.

철도와 지역발전 - 대구권 광역전철망 구상과 지역발전 효과 (A Study on Construction of Metro Rapid Transit Network in Daegu Area)

  • 한근수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 특별세미나.특별세션
    • /
    • pp.27-41
    • /
    • 2008
  • Construction of metro transportation infra is a large-scale project requiring tremendous financial resources. This study suggests operation method to use for rapid transit line existing infra such as Gyeongbu line and spare line capacity following second phase KTX construction. Reviewing various constraints of metro rapid transit operation, we found that the conditions for metro rapid transit operation are already satisfied in Daegu area, just like the case of Gyeongbu line in Seoul Metro area. Also, the evaluation of the economic feasibility of metro rapid transit operation in Daegu area shows that B/C is about 2.4, which implies that there is sufficient economic feasibility. According to the result of sensitivity analysis, the project is economically feasible unless the passenger demand decreases 15% and construction costs increases more than 70%. B/C is evaluated large because the utilization of already exiting infra lowers the initial cost. As one of mass transportation system of large capacity, metro rapid transit can generate significant spillover effect: It will strengthen competitiveness of metro area by connecting cities within the area and by extending one-day life zone of the area, to say nothing of the benefit of improving traffic condition. The construction of metro rapid transit network is necessary for the mass transportation system of Yeongnam area as well as Daegu area, and it may work as a starting point for uniting Daegu and Gyeongbuk and strengthening regional competitiveness.

  • PDF

Structural Health Monitoring of Shanghai Tower Considering Time-dependent Effects

  • Zhang, Qilin;Yang, Bin;Liu, Tao;Li, Han;Lv, Jia
    • 국제초고층학회논문집
    • /
    • 제4권1호
    • /
    • pp.39-44
    • /
    • 2015
  • This paper presents the structural health monitoring (SHM) of Shanghai Tower. In order to provide useful information for safety evaluation and regular maintenance under construction and in-service condition, a comprehensive structural health monitoring (SHM) system is installed in Shanghai Tower, which is composed of a main monitoring station and eleven substations. Structural responses at different construction stages are measured using this SHM system and presented in this study. Meanwhile, a detailed finite element model (FEM) is created and comparison of results between SHM and FEM is carried out. Results indicate that the time-dependent property of concrete creep is of great importance to structural response and the measured data can be used in FEM updating to obtain more accurate FEM models at different construction stages. Therefore, installation of structural health monitoring system in super-tall buildings could be considered as an effective way to assure structural safety during the construction process.

가상 시뮬레이션에 의한 도로설계정보 최적화 방법론 및 지원체계 개발 (Development of VR Simulation Algorithm and System for Supporting Optimal Road Design Information)

  • 문현석;강인석
    • 한국건설관리학회논문집
    • /
    • 제10권4호
    • /
    • pp.101-110
    • /
    • 2009
  • 본 연구는 기존 시공단계 중심의 VR시뮬레이션 활용체계를 설계단계까지 확장하여 도로의 최적 설계정보 지원을 위한 시각화 분석 기능을 개발하는 것이 목적이다. 연구에서는 설계지원을 위한 VR기능으로 도보 선형(alignment)에 의한 토공 시뮬레이션, 대안 노선 선정 시뮬레이션 구조물 타입 선정 시뮬레이션 및 지하시설물 분석 시뮬레이션 기능들을 제안하고 있다. 이러한 VR시뮬레이션 기능을 통해 노선 및 토공 상태의 시각적 확인이 가능하고, 대안 노선의 가상적인 모의 배치를 수행함으로써 최적 설계노선을 선정할 수 있다. 이를 위해 본 연구에서는 도로설계정보 지원을 위한 VR시뮬레이션 기능 개발 방법론 및 시스템(VR Presenter)을 구현하며, VR기능을 적용한 개선된 도로설계 프로세스를 제안하고 있다.

국내 아파트공사의 클레임요인 분석 및 예방대책 (Analysis and Prevention Countermeasures of Claim factors in Domestic Apartment Construction)

  • 임종찬;송용식;김선국;한충희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.341-344
    • /
    • 2002
  • 건설시장의 개방 분위기와 더불어 클레임에 대한 부정적 시각의 변화로 인해 국내 건설업계에도 클레임의 제기가 조금씩 증가하고 있는 추세이다. 그러나 아직도 국내 건설업계는 발주자 우위의 오랜 관행으로 인해 많은 클레임요인이 잠재적으로 내재해 있는 상태이며, 이러한 요인들이 관리 및 해결되지 않으면 앞으로 많은 건설분쟁이 발생하리라는 것은 분명한 사실이다. 이에 본 논문은 국내 아파트공사를 대강으로 클레임요인을 조사한 후 설문분석을 통해 클레임요인들이 공기, 원가, 품질과 같은 공사관리항목에 미치는 영향도를 분석하여 가장 먼저 개선되어야 할 클레임요인들을 도출하였으며, 이러한 클레임요인이 발생되는 원인을 관련 계약조항 상에서 찾아 문제점을 지적하고, 예방대책을 제시하였다.

  • PDF