• Title/Summary/Keyword: Construction Condition

Search Result 3,663, Processing Time 0.03 seconds

ANALYSIS OF THE INFLUENCE OF WEATHER ON CONSTRUCTION PRODUCTIVITY RATE FOR SUPER-HIGHRISE BUILDING CONSTRUCTION FRAMEWORK

  • Jae-won Shin;Han-kook Ryu;Moon-seo Park;Hyun-soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1124-1128
    • /
    • 2005
  • The duration of a construction project is not only a key element for taking a new order, but also a strict yardstick to determine certain project successful or not. However, since construction project is basically outdoor job and most of the activities are proceeded out-air, no matter how the schedule plan has been established accurately, actual project proceeds due to the weather condition, beyond anyone's control. In this paper, the functional relationship between work productivity rate and weather elements is suggested by regression analysis. Difference of the relationship and influence of weather due to the seasonal group are also revealed. With these results, by simulating actual weather data and generating weather forecast through historical data, more accurate schedule would be obtained.

  • PDF

Preliminary Study on Market Risk Prediction Model for International Construction using Fractal Analysis

  • Moon, Seonghyeon;Kim, Du Yon;Chi, Seokho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.463-467
    • /
    • 2015
  • Mega-shock means a sporadic event such as the earning shock, which occurred by sudden market changes, and it can cause serious problems of profit loss of international construction projects. Therefore, the early response and prevention by analyzing and predicting the Mega-shock is critical for successful project delivery. This research is preliminary study to develop a prediction model that supports market condition analysis and Mega-shock forecasting. To avoid disadvantages of classic statistical approaches that assume the market factors are linear and independent and thus have limitations to explain complex interrelationship among a range of international market factors, the research team explored the Fractal Theory that can explain self-similarity and recursiveness of construction market changes. The research first found out correlation of the major market factors by statistically analyzing time-series data. The research then conducted a base of the Fractal analysis to distinguish features of fractal from data. The outcome will have potential to contribute to building up a foundation of the early shock warning system for the strategic international project management.

  • PDF

A STUDY ON THE FEASIBILITY OF IPD METHOD IN CONSTRUCTION PROJECT IN CHINA

  • Teng Li;Jae-Jun Kim;Ju-Hyung Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.493-497
    • /
    • 2011
  • Project delivery systems have evolved over the years. Continuous changes in technology and the increasing sophistication in buildings required specialization of design and construction services. IPD as a delivery method has been used in the USA and other countries. With the development of BIM, lots of construction companies have been realizing this method since BIM came out in China. However IPD are not considered with BIM, IPD will be an important role in management system of construction. This study introduced the definition of IPD and based on the flow process of IPD, compared the process in china and other countries. Through the real project and the condition in China this paper analyzed the feasibility of IPD in China.

  • PDF

Children's sense-making of triangle congruence conditions (초등학교 아동들의 삼각형 의 합동조건 구성 과정 분석)

  • Son, So-Hyun;Yim, Jae-Hoon
    • The Mathematical Education
    • /
    • v.48 no.3
    • /
    • pp.287-302
    • /
    • 2009
  • This study investigated how 5th grade students found and understood triangle congruence conditions (SSS, SAS, ASA). In particular, this study focused on children's processes of discovering triangle congruence conditions and the obstacles which they encountered in the process of making sense of these conditions. Our data indicates that inquiring the cases in which less than three factors of triangle are given is helpful for children to guess triangle congruence conditions and understand the minimal characteristic of these conditions. And the degree of difficulty of discovering each congruence condition is different. Children discovered SAS condition and ASA condition easily, but it was hard for them to discover and understand that SSS was also a triangle congruence condition because they connected the length of a given side with the use of a scaled ruler not a compass.

  • PDF

A Relation between Financing Conditions and Business Operation of a Construction Company (자금조달환경과 건설업체 경영상태 간의 관계성 분석 연구)

  • Seo, Jeong-Bum;Lee, Sang-Hyo;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.1
    • /
    • pp.61-70
    • /
    • 2012
  • A construction project is very costly and takes a long time to make investment and yield profit. For this reason, financial institutions are cautious about financing construction projects. Meanwhile, a construction company needs financing from financial institutions to cover a large expense of a construction project. Thus, there is likely to be a close correlation between financing conditions and business operation of a construction company. To examine the relationship, variables were identified that are related to insolvency of a construction company and changes in financing conditions. The analysis period is between the second quarter of 2001 and the fourth quarter of 2010. Data was retrieved from TS2000 established by Korea Listed Companies Association (KLCA), Statistics Office, and Construction Economy Research Institute of Korea (CERIK). In terms of methodology, VECM (Vector Error Correction Model) was used to analyze dynamic relationship between changes in financing conditions and insolvency of a construction company based on the identified variables. The hypothesis was that changes in financing conditions would significantly affect business of a construction company, but, the analysis did not find a close relation between the two factors. However, it was shown that poor business of a construction company affects financing conditions adversely.

A Study on the Intensive Safety Management Items of Small-Sized Construction Sites (소규모 건축공사 중점안전관리항목에 관한 연구)

  • Go, Seong-Seok;Song, Do-Heom;Jang, Yun-Ra
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.5
    • /
    • pp.27-34
    • /
    • 2013
  • Almost accidents in construction sites are occurred by unsafe work conditions and failure making safe environment. As recent construction projects become more complex, various and diversified, So the potential of construction-related accidents is increased as well. Comparing the frequency of construction-related accidents in large-sized construction sites, small-sized construction sites are more vulnerable because of lack of workforce and less effective technology system. Furthermore, the absence of safety committee, poor financial condition leads to lack of safety education, installation of safety facilities, and provision of individual protective equipment, which indicates difficulties handling even basic safety management. Therefore, in order to lower the hazard rate at small-Sized construction sites, it is necessary to proceed with more structural and thorough actions for preventing accidents. In other words, it is necessary to analyze the causes of the accidents at small-sized construction sites, set criteria for safety management, and suggest safety management items according to work classification by evaluating the relative importance of the items.

A study on activation plan of development of the advanced construction technology (건설신기술 개발의 활성화 방안에 관한 연구 - 전문건설업체를 중심으로 -)

  • On Seong-Won;Park Hyeon-Yong;Lee Young-Hwan;Woo Sungkwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.490-493
    • /
    • 2004
  • The domestic construction industry need to do productivity improvement through technology development than improvement of manpower control or system and develop competitive power through technology in international construction market. Upon this, government for elevation of technological level enacts and operates the advanced construction technology endorsement system but is not looking at effect as that the actual use-results also expected first. Therefore, in this paper, present improvement and direction for activation plan of construction new technology development through comparison with other connection system, literature investigation and questionnaire after grasp present condition of the advanced construction technology endorsement system with specialty construction company as the central figure which occupy most of appointed new technology.

  • PDF

A Study on the Types and Solves Plan of Popular Complaint by Construction Work Types - Focus on the Gwang-Ju City - (건축공사 공종에 따른 진정민원의 유형과 처리에 관한 연구 - 광주 지역을 중심으로 -)

  • Song, Hyuk;Go, Seong-Seok;Park, Hyeon-Ku
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.97-105
    • /
    • 2005
  • As construction project is becoming larger, construction progress and works are more various and complex according to recent Korean construction tendency. The growth of construction induces much pollution on the progress of construction and the problems due to the construction pollution are raised into social problem strongly, because it is increasing the need on the quality of lift and the desire of clean environment. This study aimed to seek far the effective solving plan of the construction popular complaints by surveying the real condition of construction popular complaints and analyzing the cause and tansaction period of popular complaints. For this study, the laws related and popular complaints were analysed focusing on the documents in low district offices of Gwangju from 2000 to 2004. As a result, the types of construction popular complaints were divided into 17 and the causes were as follows in order: crack and subsidence of ground(14.90%), infringement of private life(11.55%), noise(10.80%), infringement of a right to sunshine(10.07%) and breakdown(6.7%). Consequently, it is considered that these complaints are occurred by physical and environmental causes.

Cross-border Relationship Analysis Between Base Interest Rates and Construction Investment (국경을 넘어선 기준금리와 건설투자 간의 관계 분석)

  • Kim, Toseung;Lee, Hyeon-soo;Park, Moonseo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.1
    • /
    • pp.47-56
    • /
    • 2019
  • As the zero interest rate era was over with the end of quantitative easing, the economy of several global markets observed the fluctuations of the base interest rate. Interest rate, which is the change of money value with respect to time, is negatively correlated with construction investment. Considering the characteristics of interest rates and construction investment as economic variables, the necessity of cross-border analysis between base interest rate and construction investment was suggested in this paper. Cross-correlation analysis between base interest rates and construction investment crossing the border was performed. The effective correlations were confirmed with values varying by countries. Similar characteristics were also observed among countries with similar economy, which were then divided into three groups. Additionally, identifying the base interest rate that affects the construction investment of a particular country was made possible by reflecting a self-cycle of base interest rates. Lastly, from the result of examining the influence of each rise and fall of the interest rate, it was verified that the difference was more than twice as large in some countries. These results are expected to contribute to construction-related policy makers or investors to make decisions in response to the economic status of the construction market.

Collision Hazards Detection for Construction Workers Safety Using Equipment Sound Data

  • Elelu, Kehinde;Le, Tuyen;Le, Chau
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.736-743
    • /
    • 2022
  • Construction workers experience a high rate of fatal incidents from mobile equipment in the industry. One of the major causes is the decline in the acoustic condition of workers due to the constant exposure to construction noise. Previous studies have proposed various ways in which audio sensing and machine learning techniques can be used to track equipment's movement on the construction site but not on the audibility of safety signals. This study develops a novel framework to help automate safety surveillance in the construction site. This is done by detecting the audio sound at a different signal-to-noise ratio of -10db, -5db, 0db, 5db, and 10db to notify the worker of imminent dangers of mobile equipment. The scope of this study is focused on developing a signal processing model to help improve the audible sense of mobile equipment for workers. This study includes three-phase: (a) collect audio data of construction equipment, (b) develop a novel audio-based machine learning model for automated detection of collision hazards to be integrated into intelligent hearing protection devices, and (c) conduct field experiments to investigate the system' efficiency and latency. The outcomes showed that the proposed model detects equipment correctly and can timely notify the workers of hazardous situations.

  • PDF