Jae-won Shin;Han-kook Ryu;Moon-seo Park;Hyun-soo Lee
International conference on construction engineering and project management
/
2005.10a
/
pp.1124-1128
/
2005
The duration of a construction project is not only a key element for taking a new order, but also a strict yardstick to determine certain project successful or not. However, since construction project is basically outdoor job and most of the activities are proceeded out-air, no matter how the schedule plan has been established accurately, actual project proceeds due to the weather condition, beyond anyone's control. In this paper, the functional relationship between work productivity rate and weather elements is suggested by regression analysis. Difference of the relationship and influence of weather due to the seasonal group are also revealed. With these results, by simulating actual weather data and generating weather forecast through historical data, more accurate schedule would be obtained.
International conference on construction engineering and project management
/
2015.10a
/
pp.463-467
/
2015
Mega-shock means a sporadic event such as the earning shock, which occurred by sudden market changes, and it can cause serious problems of profit loss of international construction projects. Therefore, the early response and prevention by analyzing and predicting the Mega-shock is critical for successful project delivery. This research is preliminary study to develop a prediction model that supports market condition analysis and Mega-shock forecasting. To avoid disadvantages of classic statistical approaches that assume the market factors are linear and independent and thus have limitations to explain complex interrelationship among a range of international market factors, the research team explored the Fractal Theory that can explain self-similarity and recursiveness of construction market changes. The research first found out correlation of the major market factors by statistically analyzing time-series data. The research then conducted a base of the Fractal analysis to distinguish features of fractal from data. The outcome will have potential to contribute to building up a foundation of the early shock warning system for the strategic international project management.
International conference on construction engineering and project management
/
2011.02a
/
pp.493-497
/
2011
Project delivery systems have evolved over the years. Continuous changes in technology and the increasing sophistication in buildings required specialization of design and construction services. IPD as a delivery method has been used in the USA and other countries. With the development of BIM, lots of construction companies have been realizing this method since BIM came out in China. However IPD are not considered with BIM, IPD will be an important role in management system of construction. This study introduced the definition of IPD and based on the flow process of IPD, compared the process in china and other countries. Through the real project and the condition in China this paper analyzed the feasibility of IPD in China.
This study investigated how 5th grade students found and understood triangle congruence conditions (SSS, SAS, ASA). In particular, this study focused on children's processes of discovering triangle congruence conditions and the obstacles which they encountered in the process of making sense of these conditions. Our data indicates that inquiring the cases in which less than three factors of triangle are given is helpful for children to guess triangle congruence conditions and understand the minimal characteristic of these conditions. And the degree of difficulty of discovering each congruence condition is different. Children discovered SAS condition and ASA condition easily, but it was hard for them to discover and understand that SSS was also a triangle congruence condition because they connected the length of a given side with the use of a scaled ruler not a compass.
Journal of The Korean Digital Architecture Interior Association
/
v.12
no.1
/
pp.61-70
/
2012
A construction project is very costly and takes a long time to make investment and yield profit. For this reason, financial institutions are cautious about financing construction projects. Meanwhile, a construction company needs financing from financial institutions to cover a large expense of a construction project. Thus, there is likely to be a close correlation between financing conditions and business operation of a construction company. To examine the relationship, variables were identified that are related to insolvency of a construction company and changes in financing conditions. The analysis period is between the second quarter of 2001 and the fourth quarter of 2010. Data was retrieved from TS2000 established by Korea Listed Companies Association (KLCA), Statistics Office, and Construction Economy Research Institute of Korea (CERIK). In terms of methodology, VECM (Vector Error Correction Model) was used to analyze dynamic relationship between changes in financing conditions and insolvency of a construction company based on the identified variables. The hypothesis was that changes in financing conditions would significantly affect business of a construction company, but, the analysis did not find a close relation between the two factors. However, it was shown that poor business of a construction company affects financing conditions adversely.
Almost accidents in construction sites are occurred by unsafe work conditions and failure making safe environment. As recent construction projects become more complex, various and diversified, So the potential of construction-related accidents is increased as well. Comparing the frequency of construction-related accidents in large-sized construction sites, small-sized construction sites are more vulnerable because of lack of workforce and less effective technology system. Furthermore, the absence of safety committee, poor financial condition leads to lack of safety education, installation of safety facilities, and provision of individual protective equipment, which indicates difficulties handling even basic safety management. Therefore, in order to lower the hazard rate at small-Sized construction sites, it is necessary to proceed with more structural and thorough actions for preventing accidents. In other words, it is necessary to analyze the causes of the accidents at small-sized construction sites, set criteria for safety management, and suggest safety management items according to work classification by evaluating the relative importance of the items.
On Seong-Won;Park Hyeon-Yong;Lee Young-Hwan;Woo Sungkwon
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.490-493
/
2004
The domestic construction industry need to do productivity improvement through technology development than improvement of manpower control or system and develop competitive power through technology in international construction market. Upon this, government for elevation of technological level enacts and operates the advanced construction technology endorsement system but is not looking at effect as that the actual use-results also expected first. Therefore, in this paper, present improvement and direction for activation plan of construction new technology development through comparison with other connection system, literature investigation and questionnaire after grasp present condition of the advanced construction technology endorsement system with specialty construction company as the central figure which occupy most of appointed new technology.
As construction project is becoming larger, construction progress and works are more various and complex according to recent Korean construction tendency. The growth of construction induces much pollution on the progress of construction and the problems due to the construction pollution are raised into social problem strongly, because it is increasing the need on the quality of lift and the desire of clean environment. This study aimed to seek far the effective solving plan of the construction popular complaints by surveying the real condition of construction popular complaints and analyzing the cause and tansaction period of popular complaints. For this study, the laws related and popular complaints were analysed focusing on the documents in low district offices of Gwangju from 2000 to 2004. As a result, the types of construction popular complaints were divided into 17 and the causes were as follows in order: crack and subsidence of ground(14.90%), infringement of private life(11.55%), noise(10.80%), infringement of a right to sunshine(10.07%) and breakdown(6.7%). Consequently, it is considered that these complaints are occurred by physical and environmental causes.
Journal of the Architectural Institute of Korea Structure & Construction
/
v.35
no.1
/
pp.47-56
/
2019
As the zero interest rate era was over with the end of quantitative easing, the economy of several global markets observed the fluctuations of the base interest rate. Interest rate, which is the change of money value with respect to time, is negatively correlated with construction investment. Considering the characteristics of interest rates and construction investment as economic variables, the necessity of cross-border analysis between base interest rate and construction investment was suggested in this paper. Cross-correlation analysis between base interest rates and construction investment crossing the border was performed. The effective correlations were confirmed with values varying by countries. Similar characteristics were also observed among countries with similar economy, which were then divided into three groups. Additionally, identifying the base interest rate that affects the construction investment of a particular country was made possible by reflecting a self-cycle of base interest rates. Lastly, from the result of examining the influence of each rise and fall of the interest rate, it was verified that the difference was more than twice as large in some countries. These results are expected to contribute to construction-related policy makers or investors to make decisions in response to the economic status of the construction market.
International conference on construction engineering and project management
/
2022.06a
/
pp.736-743
/
2022
Construction workers experience a high rate of fatal incidents from mobile equipment in the industry. One of the major causes is the decline in the acoustic condition of workers due to the constant exposure to construction noise. Previous studies have proposed various ways in which audio sensing and machine learning techniques can be used to track equipment's movement on the construction site but not on the audibility of safety signals. This study develops a novel framework to help automate safety surveillance in the construction site. This is done by detecting the audio sound at a different signal-to-noise ratio of -10db, -5db, 0db, 5db, and 10db to notify the worker of imminent dangers of mobile equipment. The scope of this study is focused on developing a signal processing model to help improve the audible sense of mobile equipment for workers. This study includes three-phase: (a) collect audio data of construction equipment, (b) develop a novel audio-based machine learning model for automated detection of collision hazards to be integrated into intelligent hearing protection devices, and (c) conduct field experiments to investigate the system' efficiency and latency. The outcomes showed that the proposed model detects equipment correctly and can timely notify the workers of hazardous situations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.