• Title/Summary/Keyword: Construction Condition

Search Result 3,663, Processing Time 0.036 seconds

Numerical Study for Tunnel Shotcrete Lining Operated Stress Measurement Techique Development During a Construction (시공중 터널 숏크리트 라이닝 작용응력 측정기법 개발을 위한 수치해석적 연구)

  • Shin, Hyu-Seong;Kim, Dong-Gyou;Jung, Yong-Su;Hwang, Jae-Hong;Bae, Gyu-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.754-761
    • /
    • 2008
  • In general, stress measurement of existent shotcrete lining be used by pressure cells. but, measuring instrument is lost by high pressure at shotcrete lining construction and pressure cell's measurement value have to low believability by natural conditions like curing temperature. In this study, proposed techniques to measure without utilizing sensitive stress sensor in natural condition at point that want stress of shotcrete lining after shotcrete lining construction. Executed numerical analysis to forecast stress level that interact in tunnel shotcrete lining, measured strain of hole by load action through hole in shotcrete lining. 3D FEM(finite element method) is enforced through various parameters curing time of shotcrete lining, thickness, load condition. Different model cases applied by parametic study. As analysis result, it could grasp development possibility of method that propose this time because it could examine corelation with strain by near hole of shotcrete lining and stress about load condition.

  • PDF

A Case Study for Deformation of Caisson caused by Friction Shortage (케이슨 하부의 마찰저항 부족에 따른 케이슨 안벽 변위발생 사례연구)

  • Shim, Dong-Hyun;Park, Jun-Ho;Lee, Kyung-Sook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.325-336
    • /
    • 2008
  • Deformation of caisson occurred during the backfilling behind the caisson and some caisson moved toward seaside. A series of site investigation were conducted to figure out various circumstances at site and also used to analyze the cause of deformation. The soil condition of backfilling is also investigated because dredged material was used as a backfill material. The friction angle of backfill is supposed to be lower than the estimated one which was used in design stage. To determine the cause of friction shortage, back analysis for sliding safety were carried out with considering the soil condition of backfilling. A remedial plan, re-rising and relocating a caisson with backfilling good earth after treatment of caisson rubble mound to achieve the safety for sliding was proposed as a best solution based on the back analysis results. Reform concrete structure including service gallery and crane rail was also considered with the remedial work to improve the cape line of caisson.

  • PDF

Study on the Application of Site for Exposure Type of Complex Waterproofing Method with Liquefied Waterproof using of Vertical Type Reinforcing Sheet Material Reinforced Sheet Rising System in the Roof Tops (돌기 시스템을 이용한 입체보강형시트의 옥상노출복합방수공법 적용에 관한 재료 및 공법적 연구)

  • Oh, Sang-Keun;Son, Mun-Se;Kim, Jin-Seong;Yeo, In-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.17-20
    • /
    • 2006
  • It often happen water leakage that roof membrane have a poor condition such as direct exposed to rain, ultraviolet lays, temperature change compare with other part of waterproofing. There are difficult to maintain the quality of waterproofing and durability due to use only few waterproofing materials in practical in spite of development and use the various waterproofing material as solution of these poor condition. Therefore, in this thesis, I would like to know the property to apply field and suggest other method to develop for this waterproofing method to adopt various field condition for roof tops, as searching exposed and complex waterproofing technology for roof tops which is reinforced sheet using rising system have a regular pitch, depth, space.

  • PDF

A Fundamental Study on Manufacturing Condition the High Quality Recycled Fine Aggregate by Low Speed Wet Rotary Mill (저속습식마쇄기를 이용한 고품질 순환잔골재 제조에 관한 기초적 연구)

  • Kim, Ha-Seog;Lee, Gyung-Hyun;Ra, Jeong-Min;Park, Hyo-Jin;Lim, Dae-Bin;Kim, Jin-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.65-68
    • /
    • 2009
  • Recycled aggregate by the recycling construction waste has a lot of advantage such as the developing the alternative resource and protecting of environment. However, recycled aggregate is used as the low quality grade, because the technic to remove old mortar from aggregate is low level. To use the recycled aggregate as high quality grade, it is important to develop the technic to produce the high quality recycled aggregate. To manufacture the high quality recycled aggregate, old mortar attached on the aggregates should remove efficiently. Therefore, in this study, we suggested the optimum condition to remove old mortar effectively using sulfuric acid and low speed wet rotary mill for high quality recycled fine aggregate. The results shows that the recycled aggregate satisfy on the standards of KS F 2573 in density, absorption and solid volume when, adequate condition of sulfuric mole ratio and aggregate ratio are make.

  • PDF

A Civilian Reporting Service to Guide Converging Resources for Search and Rescue in Disaster Response

  • Chen, Albert Y.;Han, Sang-Uk;Lee, Sang-Hyun;Pena-Mora, Feniosky
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.3
    • /
    • pp.45-51
    • /
    • 2011
  • During disaster response, prioritization of limited resources is one of the most important but challenging tasks. At the same time, it is imperative to timely provide to the rescuers with the adequate heavy equipment to facilitate lifesaving operations. However, supply of high demand equipment is usually insufficient during the initial phase of disaster response, challenging lifesaving operations. At the same time, resources outside of the disaster affected zone converge into the area to assist the response efforts, which is the effect of convergence that often made resource coordination challenging in large scale disasters. Meanwhile, the initial condition of the disaster is usually best known by civilians already at the area before and during impact of the disaster. The knowledge of the civilians is not always received and considered by the responding organizations. With the help of these civilians, critical information such as victim location, infrastructure damage, and risk condition could be better know before any response actions are taken. To efficiently collect information and utilize the converging resources, this paper proposes a geospatial information repository for initial condition reporting and update to guide search and rescue operations and deployment of equipment with safety considerations for the rescuers in large scale disaster response scenarios.

Study on the Application of Site for Exposure Type of Complex Waterproofing Method with Liquefied Waterproof using of Vertical Type Reinforcing Sheet Material Reinforced Sheet Rising System in the Roof Tops (돌기 시스템을 이용한 입체보강형시트의 옥상노출복합방수공법 적용에 관한 재료 및 공법적 연구)

  • Oh, Sang-Keun;Son, Mum-Se;Kim, Jin-Seong;Yeo, In-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.4 s.22
    • /
    • pp.69-75
    • /
    • 2006
  • It often happen water leakage that roof membrane have a poor condition such as direct exposed to rain, ultraviolet lays, temperature change compare with other part of waterproofing. There are difficult to maintain the quality of waterproofing and durability due to use only few waterproofing materials in practical in spite of development and use the various waterproofing material as solution of these poor condition. Therefore, in this thesis, I would like to know the property to apply field and suggest other method to develop for this waterproofing method to adopt various field condition for roof tops, as searching exposed and complex waterproofing technology for roof tops which is reinforced sheet using rising system have a regular pitch, depth, space.

A Study on the Selection of Construction Method by Decision Making Method (의사결정기법을 통한 건축공법선정에 관한 연구)

  • Yang, Keek-Young;Yoon, Yer-Wan
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.1
    • /
    • pp.147-154
    • /
    • 2002
  • In the Past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need very careful process. The purpose of this study is to present the best suitable methodology for selection of construction method by considering potential risk of construction method and variables together with external condition for underground construction. The purpose of this study Is to select the most suitable construction method by analysing potential conditions(construction site situation and client request in designing ) To do this, We prepared arrangement rule to arrange the conditions for construction method. And thin make checklist of the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy process among Multiple-Criteria Decision making, the professional opinions is to be adapted. By doing this, it can lead and select the most suitable construction method considering the data which get from risk density test.

A Study on Construction policy for Seoul Metropolitan Railway (서울 도시철도 건설방향에 대한 연구)

  • Woo, Nam-Jik;Lee, Won-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.6
    • /
    • pp.67-71
    • /
    • 2008
  • This study is to retest of seoul traffic, all sorts of statistical data, the present condition of urban railway that local government and all sorts of research institution had researched. Even though, or something else with population and regional industrial distribution of seoul with worker and the present condition of the registrated cars and the change of increase, we have predicted the medium term and long-range solution. we have proposed the alternative plan about both of the problem that is the developmental construction direction of seoul urban railway and the resource insurance for urban railway construction.

A study on the characteristic of adhesion on the low temperature concrete of self adhesive waterproofing sheet using interface leakage test. (계면 누수를 통한 자착형 방수시트의 저온 부착 특성에 관한 연구)

  • Choi, Su-Young;Kim, Meong-Ji;Lee, Jung-Hoon;Choi, Sung-Min;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.234-235
    • /
    • 2014
  • Recently, waterproof construction used to self adhesive waterproofing sheet in the actual field in winter for reduce cost and term. However self adhesive waterproofing sheet's quality is declined in low temperature condition. So, this study was to confirm on the low temperature condition of concrete substrate effecting the adhesion of self adhesion waterproofing sheet using interface leakage test. As a result of this study, self adhesion waterproofing sheet must not be used at temperature below 5℃. Also, adhesion between waterproofing sheet and concrete is declined in low temperature.

  • PDF

Behavior of a Reinforced Retaining Wall During Construction (보강토의 시공중 거동 평가)

  • 노한성;최영철;백종은;김영남
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.95-100
    • /
    • 2000
  • When compared with conventional retaining wall system, there are many advantages to reinforced soil such as cost effectiveness, flexibility and so on. The use of reinforced soil have been increased in the last 17 years in Korea. In this study, a full-scale reinforced soil with rigid facing were constructed to investigate the behavior of reinforcing system. The results of soil pressure and strain of reinforcement during construction are described. The influence of compaction on soil pressure and strain of reinforcement is addressed. The results show that lateral earth pressures on the wall are active state during backfill. It is obtained that the lateral soil pressure depends on the installation condition of pressure cell and construction condition. It is also observed that maximum tensile strains of reinforcement are located on 50cm to 150cm from the wall. Long-term measurement will be followed to verify the design assumptions with respect to the distribution of lateral stress in the reinforcement

  • PDF