• Title/Summary/Keyword: Construction Assessment

검색결과 2,406건 처리시간 0.03초

건설공사장 소음의 위해성 평가 (Assessment of Annoyance Cause by Different Types of Construction Noises)

  • 이성찬;전진용
    • 한국소음진동공학회논문집
    • /
    • 제23권12호
    • /
    • pp.1111-1116
    • /
    • 2013
  • In the present study, annoyance caused by diverse construction noises was evaluated through surveys. A survey with a total of 110 construction workers was carried out to investigate annoyance from construction noises at different construction phases. The most effective item of adverse by construction noise was annoyance and the most annoyed construction stage was destruction construction. There were high correlation between work performance and work safety as well as work safety and speech interference. Participant's noise sensitivity were significant between low and high group at work performance, work safety, speech interference.

건설공사장 소음의 위해성 평가 (Assessment of Annoyance cause by Different Types of Construction Noises)

  • 이성찬;이평직;전진용;정진연;임정빈
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2011년도 추계학술대회 논문집
    • /
    • pp.408-413
    • /
    • 2011
  • In the present study, annoyance caused by diverse construction noises was evaluated through surveys and laboratory experiments. A survey with a total of 110 construction workers was carried out to investigate annoyance from construction noises at different construction phases. The most effective item of adverse by construction noise was annoyance and the most annoyed construction stage was destruction construction. Between work performance and work safety had correlation as well as between work safety and speech interference. Participant's noise sensitivity were significant between low and high group at work performance, work safety, speech interference.

  • PDF

A Probabilistic Fuzzy Logic Approach to Identify Productivity Factors in Indian Construction Projects

  • Princy, J. Darwin;Shanmugapriya, S.
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.39-55
    • /
    • 2017
  • Preeminent performance of construction industry are unattainable with poor productivity resulting in time and cost over runs. Enhancement in productivity cannot be achieved without identifying and analyzing factors that adversely affect productivity. The objective therefore is to propose a productivity analysis model to quantify the probability of effect of factors influencing productivity by using fuzzy logic incorporated with relative importance index method, for various types of construction projects. To achieve this objective, a questionnaire survey was carried out targeting respondents of Indian construction industry, from four distinct projects, namely, residential, commercial, infrastructure and industrial projects. Based on questionnaire administered, the relative importance and ranks of factors demonstrated using relative importance index method. Probability assessment model to analyze productivity was then developed by using Fuzzy Logic Toolbox of MATLAB. The applicability of the proposed model was tested in seven construction projects and the probability of impact of factors on productivity evaluated. The results of application of model in the construction firms infers that the most contributing factor groups for most of the projects were discerned to be manpower, motivation and time group.

Analysis of Quality Improvement Priority for Construction PMIS

  • An, Hyo-Kyung;Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
    • 한국건축시공학회지
    • /
    • 제12권1호
    • /
    • pp.10-21
    • /
    • 2012
  • As one of the key IT applications, the project management information system (PMIS) played a significant role in construction management processes in Korea. On increasing use of PMIS, regular quality assessment to identify user's requirements of PMIS is necessary. However, there have been rare research efforts for quality assessment for the construction PMIS. This paper aims to propose a priority index of quality improvement for construction PMIS using the importance and satisfaction measures and to verify the discrimination power of the priority index by comparing it with other quality improvement priority index. In addition, this paper discusses some possible ways of PMIS quality improvement. The analysis of quality improvement priority was based on a questionnaire responded by 253 PMIS users (construction managers and constructors). The methods of PMIS improvement were based on the interviews with eight experts. These findings would be the foundation of further researches on PMIS quality improvement. However, more efforts are required to enhance the priority index, in terms of reflecting weighted values of quality assessment factors.

터널 굴착시 발생하는 지하수의 유출량 예측에 관한 연구 (A Study on the Prediction of Outflow of Groundwater in Tunnel Construction Areas)

  • 박선환;장윤영;강형식;최준규;양근호
    • 환경영향평가
    • /
    • 제16권6호
    • /
    • pp.407-419
    • /
    • 2007
  • This study investigated the predicted and abserved outflow of groundwater which occurred during tunnel constructions. Among the 586 road construction projects from 1986 to 2006, 4 route 25 tunnel construction areas and 26 waste water treatment facilities under construction were studied. Most of the tunnel outflow prediction in EIA (Environmental Impact Assessment) process have been classified into the 17 types of units depending on the assessor's options, which have not conformed to the request of the residents and non government organizations. The investigation results showed that the outflow of underground water in tunnel construction areas averaged about $0.133m^3/km{\cdot}min$ with the maximum $0.386m^3/km{\cdot}min$, and that the outflow mostly occurred in the early stage of tunnel excavation and diminished gradually. The prediction of outflow of underground water in the EIA process showed excessive results compared to observed outflow, the even 51.7 times. Consequently for more realistic prediction, current EIA method for prediction of outflow of underground water in tunnel construction areas has to adopt numerical methods coupled with hydraulics and geologic informations from unit methods of present time.

스마트 고로슬래그미분말 혼입 콘크리트의 CO2 배출량 평가에 관한 연구 (The Analysis of CO2 Emission Assessment in Concrete with Smart Blast Furnace Slag)

  • 김태형;태성호;하성균;박정훈;노승준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.43-45
    • /
    • 2012
  • As a part of recent CO2 emission reduction studies in the concrete industry with active use of concrete admixtures with low basic unit of CO2 emission such as blast furnace slag (BFS), basic unit of CO2 emission by SBFS was computed in order to assess CO2 emission by reinforced concrete building with smart blast furnace slag (SBFS). In addition, SBFS concrete was applied to the subject building for assessment of CO2 emission during material production step among construction steps. Life cycle CO2 emission assessment on the subject building was classified into 7cases according to mix ratio of BFS and SBFS.

  • PDF

Modelling and integrity assessment of shear connectors in precast cast-in-situ concrete bridges

  • Moyo, Pilate;Sibanda, Bongani;Beushausen, Hans
    • Structural Engineering and Mechanics
    • /
    • 제42권1호
    • /
    • pp.55-72
    • /
    • 2012
  • Precast-cast insitu concrete bridge construction is widely practiced for small to medium span structures. These bridges consist of precast pre-stressed concrete beams of various cross-sections with a cast in-situ reinforced concrete slab. The connection between the beams and the slab is via shear links often included during the manufacturing process of the beams. This form of construction is attractive as it provides for standardisation, reduced formwork and construction time. The assessment of the integrity of shear connectors in existing bridges is a major challenge. A procedure for assessment of shear connectors based on vibration testing and finite element model updating is proposed. The technique is applied successfully to a scaled model bridge model and an existing bridge structure.

외국인 대학생이 작성 중인 학술 보고서에 나타난 제(諸) 문제 (Procedural Problems in Academic Writing Faced by International Students)

  • 김지영
    • 한국어교육
    • /
    • 제28권1호
    • /
    • pp.23-47
    • /
    • 2017
  • This research analyzed procedural problems presented in academic writing faced by international students. The result of this research will serve as a basis for suggesting methods of developing a curriculum in Korean writing as a liberal arts education designed for international students. To analyze problems presented in academic writing by international students, the standard of assessment was divided into interaction, knowledge construction, and material quotation. Then, knowledge construction was divided into contents, structure, and expression, and the items were subdivided in each category. These categories of assessment correspond to the genre of academic writing and are different from the existing standard of assessment for academic writing. Applying these standards, this research analyzed 43 texts of academic writing in process for a final paper by international students in an class and presented problems in them. Furthermore, this paper aims to give detailed feedback that can help solve those problems.

건설 프로젝트의 재해영향요인 기반 위험성 평가방법 (A Risk Assessment Method using Disaster Influence Factors on Construction Project)

  • 유용신;최재욱;김태완;이찬식
    • 대한건축학회논문집:계획계
    • /
    • 제35권6호
    • /
    • pp.3-12
    • /
    • 2019
  • Current risk assessment methods typically determine accident risks embedded in construction projects by combining severity and frequency; however, they do not reflect the characteristics of construction projects. To solve the problem, this study aims to develop a novel risk assessment method that combines severity, frequency, and disaster influence factors (i.e., weather conditions and worker's characteristics) for assessing risks of activities occurring on a construction site actually. In this study, a severity was estimated by death against victims, and a frequency was estimated by the victim rate. The frequency was then converted to probability taking disaster influence factors into account. Thus, instead of considering severity and frequency for assessing the original risks (RO), the proposed method uses severity and probability to yield adjusted risks (RA) for each activity. A case study was conducted to determine if the proposed method works as intended in a real setting. The results show that RA is more sensitive to disaster influence factors than RO and, therefore, is able to assess the actual risks reflecting the working environment and conditions of a construction site. This study contributes to risk management of construction projects by offering a risk assessment method that measures a possibility of potential disasters from the probabilistic perspective. This method would help project managers assess accident risks in a more systematic and quantitative manner.

소각로 건설사업에 대한 건강영향평가 사례연구 - 중금속 흡입에 따른 인체 위해성 평가 - (A Case Study of Health Impact Assessment on Incinerator Construction Project - Human Risk Assessment due to Inhalation Exposure to Heavy Metals -)

  • 김영하;최상기;이영수
    • 환경영향평가
    • /
    • 제18권1호
    • /
    • pp.11-19
    • /
    • 2009
  • We conducted human risk assessment due to inhalation exposure to heavy metals emitted from incinerator. The process of health impact assessment(HIA) on incinerator is as follows: The first step is to presume and calculate the amount of heavy metals emitted using emission factor. The second step is to conduct an exposure assessment using the K-SCREEN model which is used for predicting the concentration in a conservative method. The last step is to carry out a risk assessment on carcinogenic and non-carcinogenic substances. This study revealed that rank of carcinogenic human risk was $Cr^{+6}$ > As > Ni > Cd, and values of human risk assessment on carcinogenic and non-carcinogenic substances is lower than the US criteria for risk assessment except $Cr^{+6}$. It is expected that the technique of HIA, especially human risk assessment on heavy metals, would be applied to the incinerator construction project. In addition, more systematic studies are needed to overcome some weak points and limits found in this study.