In this study, we propose a piping material supply management method using CAD system. The piping materials installed in super large offshore plants have very complicated connection conditions. Therefore, it is very difficult to determine the order of receipt of a large number of installation materials. Therefore, we have developed a system that can automatically check the preparation rate of installation materials prior to the installation process. We have developed an algorithm to obtain connection information among installation items from PDMS system. We have developed an algorithm that can determine the order of installation materials to be installed using the connection information. The order of the installation material is determined by taking into account the constraint conditions for the complete installation of the piping material. We confirm the effectiveness of the developed algorithms in the operating system. This system is also used to manage installation schedules and plan the installation manpower.
The purpose of the study is to survey the effective methodology of composition and connection for the third pedestrian routes in mixed-use building by case studies. The study is performed as follows: First of all, pedestrian routes are classified into malling route, evacuation route, and the Third route. Secondly, case studies are conducted based on the classification. Thirdly, it is investigated about the composition and connection of the malling and the Third pedestrian route. The investigation is focused on gate, path, central area, vertical circulation(EV and escalator) and the four circulation elements. Finally, the effective methodology is extracted for setting the Third route in mixed-use buildings. The conclusion of the study is as follows: The enhancement of consistency and connection between the main route and the Third route is important for providing convenient paths especially to users who needs shortcut, EV/ES users. Additionally, the connections between EV and gate, between shortcut and EV/ES should be increased to enable users choosing their path as needed.
In order to keep and increase a competitive potential, industrial enterprises have to reduce their costs for product development as well as shorten lead time in product development processes. Moreover they have to respond to market factors and conditions such as increasing demands for functionality and individuality of products, short product life cycles, high pressure on prices and time to market. The improved functional requirement in connection with high time and cost pressure lead to high risk in product development. Technological fine improvements in connection with high time and cost pressure lead to high development risk. To cope with these challenges many enterprises have to collaborate globally. The collaborative engineering in product development is aimed to create distributed collaborative corporations and to facilitate the management of design conflicts. This paper provides a methodology for analyzing collaborative design process as well as the tools and the framework to support collaborative product development. The methodology can identify the interdependences among design tasks and teams. The tools and framework are implemented to facilitate the management of product development process.
Nowadays, remodeling cases for some apartment like Hyundai through the support of government are reported. Conventionally, balcony and aisle are extended for additional private area or balcony which is supported by new frame is extended. In extension work at site, dowel bar is conventionally inserted in old concrete slab for connection with old and new slab, however, an examination for structural safety is rarely performed prior to construction, if ever, vertical load is only considered for structural analysis. When conventionally connected structures are exposed to earthquake, the old and new structures have individual earthquake behavior with different mode, which may lead the elimination of resistance to earthquake in new structures. As of this reason, new detailing connection system which can have light weight and sufficient ductility performance is developed for application to domestic extension works. Additionally, user manual and specification are also developed for fertilization of application for the developed technology.
In internationalization age, growth plan of a railway have to research with the opening of a train express and connection with a transcontinental railway. Especially, in the opening of a train express, the North Korea is located in an important place. So the North Korea must research for growth of railway of the South Korea. This study make an investigation the present condition of railway of the North Korea into a report, paper, article etc.. And then, it make a comparative study with a case study of Germany. Then, a policy object, have to be stand at the head in the opening of a train express, exhibited.
The value of space is changing with change of modern society value. In this change, there is consistent subject about 'public'. So, design studies of public space for indoor and outdoor space are being carried out. Also, the concept of total design for space is a essential element and substance plan about space design and marketing is accomplished based on the total design. Now days, multiplex cultural space which have the concept of public and total design is increasing interest. Therefore, a case of multiplex cultural space, a purpose of this paper is elements investigate which design elements in public space of indoor and outdoor how it have been connecting fundamental design elements.
The Purpose of this paper is a study on the characteristics of Campidoglio hill plan by Michelangelo. 1. The plan of the Campidoglio hill is composed of the harmonized and united space, in spite of the existing conditions of a steep flight of land, a irregular site shape, a building of each other different dimension and form. And it is newly changed by site left through the modification of existing building elevation, utilization of existing building for new planning, connection with existing building and newly planned building from plaza composition of trapezoid form. 2. The concept of planning of the Campidoglio hill is planned by compromising for requirements of Baroque after Renaissance which urban planning characteristics of Baroque is as the relation with urban street through a inclined stairs and process such as street-approach stairs-plaza-symbol of inside plaza-building. 3. The section plan of the Campidoglio hill is planned by which can be easily approached to the plaza through the inclined stairs of gentle angle from street at the center east-west direction of main axis such as main axis, utilizing the existing site shape, and it is composed of the convex shape ascending gently at the center central part of the plaza. 4. The plan of the Campidoglio hill is composed of the elation with the axis of existing Senatorio palace, building planning of perfect balance, plaza composition of reversed trapezoid form bybuilding planning, central concentrated planning of buildings surrounding plaza. 5. The three palace of the plan of the Campidoglio hill is composed of the concept as theater which the stage background forms the front elevation of Senatorio palace higher two palace and the wings of either side of stage form the front elevation of Conservatori palace and Nuovo palace, surrounding three palace elevation around plaza of trapezoid form.
The purpose of this paper is a study on the dome plan of S. M. del Fiore Church of F. Brunelleschi. The results of study are as follows: 1. The planning of floor, elevation and cross section plan of S. M. del Fiore church is basically planned by each other correlation. In particular, the octangular form of geometrical standard which is formed with altar as the center at the crossing part is important component elements which is decided by not only the dome, but form and size of the drum and floor plan form of the lantern 2. The dome which has been planned by F. Brunelleshi has completed the new dome, preserving gothic thought intended by the church plan after study on architecture of ancient Rome with Pantheon. And the dome which is a main space of church through all aspects of plan, structure, function and construction about the dome is a opportunity in the beginning of Renaissance architecture which is a new epoch and a turning point of architecture on various point of view. 3. The dome which is constructed by F. Brunelleshi has been planned through the innovative solution by the refusal of traditional semicircle form dome, centering use and creation double-shell structure form for the first time in history. And the construction of dome has been solved with the invention of various construction equipments and machineries, the stone rib planned for connection and reinforcement about shells of the octangular form, the support method for reduction the gravity of bricklayers work and the brick work of nock-patterned shape which is masonry construction method of the architecture of ancient Rome.
This study intends to analysis problems and propose of EIA(Environmental Impact Assessment) and PER(Pre-Environmental Review) especially on division of landscape impacts. The problems of EIA and PER are first, on analysis of existing conditions side, insufficiency of the list of landscape elements and their descriptions and presentations, and the number of viewpoints and each validity second, on estimation of landscape impacts, the methods and techniques of estimation and simulation, and the process of impact estimation, third, on suggestion of reduction plans, reduction devices covering impacts, the lack of influence reduction forecasting devices, the deficiency of execution power of reduction plans, finally, the systematic connection of impact estimation with existing conditions analysis and reduction plans. Therefore, on each step from existing condition analysis to reduction plan suggestion, the solutions to each problem are proposed.
In this study, vibration characteristics of concrete slab were investigated through FEM analysis. Four different floor plans with the floor area of $100{\sim}130m^2$ were chosen to be analyzed. Boundary conditions of two dimensional finite element models were determined based on the modal test results. Results showed that mode shapes were formed somewhat different according to the floor plan and the contribution of 1st mode on the floor vibration is generally the highest. Through the transient analysis, it was also found that floor plan, expecially connection of the living room with the kitchen, affected the vibration acceleration levels.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.