• Title/Summary/Keyword: Competitive electricity market

Search Result 198, Processing Time 0.022 seconds

System Improvement Measures for Rational Procedures of Offshore Wind Power Generation Projects : Focusing on Permits (해상풍력 발전사업의 합리적 절차를 위한 제도개선 방안 : 인허가를 중심으로)

  • Seok-Kyu Kang;Jeong-Gab Moon;Mun-Kwan Jo
    • The Journal of Fisheries Business Administration
    • /
    • v.54 no.2
    • /
    • pp.59-76
    • /
    • 2023
  • This study is to propose ways to improve the system for rational procedures for offshore wind power generation projects. The results of this study are summarized as follows. In order to quickly distribute and develop offshore wind power projects, the permitting period should be shortened through special laws, the government actively intervenes to support the formation and operation of privat-public councils to ensure residents' acceptance. In this way, it can be competitive in the future energy market. Above all, a special law (proposal) related to offshore wind power currently pending in the National Assembly should be passed as soon as possible. Finally, the government and local governments that manage public waters should provide active administrative support based on system improvement measures in consideration of these permits, and the project's main body should minimize damage to the marine environment and ecosystem. Through these subject-specific roles, offshore wind power generation will be able to reduce carbon emissions and help establish a sustainable energy production system.

Evaluation Study of LCOE for 8 MW Offshore Floating Wind Turbine in Ulsan Region (울산 앞바다 8 MW급 부유식 해상풍력터빈의 LCOE 연구 )

  • Dong Hoon Lee;Hee Chang Lim
    • Journal of Wind Energy
    • /
    • v.14 no.1
    • /
    • pp.5-13
    • /
    • 2023
  • The commercialization has been of great importance to the clean energy research sector for investing the wind farm development, but it would be difficult to reach a social consensus on the need to expand the economic feasibility of renewable energy due to the lack of reliable and continuous information on levelized cost of Energy (LCOE). Regarding this fact, this paper presents the evaluation of LCOE, focusing on Ulsan offshore region targeting to build the first floating offshore wind farm. Energy production is estimated by the meteorology data combined with the Leanwind Project power curve of an exemplar wind turbine. This work aims to analyze the costs of the Capex depending on site-specific variables. The cost of final LCOE was estimated by using Monte-Carlo method, and it became an average range 297,090 KRW/MWh, a minimum of 251,080 KRW/MWh, and a maximum of 341,910 KRW/MWh. In the year 2021, the SMP (system marginal price) and 4.5 REC (renewable energy certificate) can be paid if 1 MWh of electricity is generated by renewable energy. Considering current SMP and REC price, the floating platform industry, which can earn around 502,000 KRW/MWh, can be finally estimated highly competitive in the Korean market.

A Study on the Power Supply and Demand Policy to Minimize Social Cost in Competitive Market (경쟁시장 하에서 사회적 비용을 고려한 전력수급정책 방향에 관한 연구)

  • Kwon, Byung-Hun;Song, Byung Gun;Kang, Seung-Jin
    • Environmental and Resource Economics Review
    • /
    • v.14 no.4
    • /
    • pp.817-838
    • /
    • 2005
  • In this paper, the resource adequacy as well as the optimum fuel mix is obtained by the following procedures. First, the regulation body, the government agency, determine the reliability index as well as the optimum portfolio of the fuel mix during the planning horizon. Here, the resources with the characteristics of public goods such as demand-side management, renewable resources are assigned in advance. Also, the optimum portfolio is determined by reflecting the economics, environmental characteristics, public acceptance, regional supply and demand, etc. Second, the government announces the required amount of each fuel-type new resources during the planning horizon and the market participants bid to the government based on their own estimated fixed cost. Here, the government announces the winners of the each auction by plant type and the guaranteed fixed cost is determined by the marginal auction price by plant type. Third, the energy market is run and the surplus of each plant except their cost (guaranteed fixed cost and operating cost) is withdrew by the regulatory body. Here, to induce the generators to reduce their operating cost some incentives for each generator is given based on their performance. The performance is determined by the mechanism of the performance-based regulation (PBR). Here the free-riding performance should be subtracted to guarantee the transparent competition. Although the suggested mechanism looks like very regulated one, it provides two mechanism of the competition. That is, one is in the resource construction auction and the other is in the energy spot market. Also the advantages of the proposed method are it guarantee the proper resource adequacy as well as the desired fuel mix. However, this mechanism should be sustained during the transient period of the deregulation only. Therefore, generation resource planning procedure and market mechanisms are suggested to minimize possible stranded costs.

  • PDF

A Study on the Effective Utilization Plan through Field Investigation and Analysis with Power Transformers in Domestic Areas

  • Shin, Heung-Sik;Lee, Jae-Cheon;Bai, Seok-Myung;Kim, Seon-Gu;Kim, Jin-Tae;Kim, Gi-Hyeon;Jeong, Jong-Wook;Bang, Seon-Bae
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.4
    • /
    • pp.88-95
    • /
    • 2007
  • Korea is highly dependent on foreign countries for energy while at the same time having a high energy-consumption industrial structure. Therefore, logical improvements in energy use efficiency and nationwide energy saving are becoming more and more important in coping with the worldwidehigh oil prices and environmental issues such as listed in the Kyoto Protocol to the United Nations Framework Convention on Climate Change. Consequently, a study was conducted on the average annual load factor in domestic areas to set a reasonable and reliable technology standard plan for high-efficiency transformers. The average annual load factor in Korea was discovered to be 18.4[%] classified by industry. This factor is expected to be used in arranging a domestic standard for a minimum efficiency system for transformers, and in reviewing and supplementing the standard transformers plan for the High Energy-Efficiency Appliance Certification. The expected effect from the establishment of the technology standards plan for highly efficient transformers is the expansion of the manufacturing and distribution of highly efficient transformers that are suitable for domestic use. These will lead to electricity cost savings for users, strengthening the related industries' market competitive powers and the effective reduction of greenhouse gases on a national level by drastically reducing loss from transformers, which accounts for a large portion of the total electric supply losses.

An Economic Assessment for APR+ Standard Detailed Design Developing Phase (APR+ 표준상세설계 개발단계에서의 경제성 평가)

  • Ha, Gak-Hyeon;Suh, Yong-Pyo;Kim, Man-Won;Kim, Sung-Choon;Park, Sun-Eung
    • Journal of Energy Engineering
    • /
    • v.21 no.3
    • /
    • pp.292-300
    • /
    • 2012
  • KHNP CRI has been developing APR+ nuclear power plant since 2007, which is GEN III+ model with 4,361 MWth capacity. To develop safer and more economical nuclear power plant than APR1400, we studied domestic and foreign nuclear power plants under construction. We also reviewed nuclear power plants which are appropriate for domestic construction in Korea and also for export. Economic assessments were made twice during the second phase of standard detailed design of the plant. The result of the second phase of economic analysis for APR+ standard detailed design showed that APR+ N-th plant was 24.6% more economical than coal-fired 1,000MW power plant, and was evaluated to be competitive enough in global market for construction of the nuclear power plant.

An Analytical Investigation for Nash Equilibriums of Generation Markets

  • Kim Jin-Ho;Won Jong-Ryul;Park Jong-Bae
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.1
    • /
    • pp.85-92
    • /
    • 2005
  • In this paper, Nash equilibriums of generation markets are investigated using a game theory application for simplified competitive electricity markets. We analyze the characteristics of equilibrium states in N-company spot markets modeled by uniform pricing auctions and propose a new method for obtaining Nash equilibriums of the auction. We assume that spot markets are operated as uniform pricing auctions and that each generation company submits its bids into the auction in the form of a seal-bid. Depending on the bids of generation companies, market demands are allocated to each company accordingly. The uniform pricing auction in this analysis can be formulated as a non-cooperative and static game in which generation companies correspond to players of the game. The coefficient of the bidding function of company-n is the strategy of player-n (company-n) and the payoff of player-n is defined as its profit from the uniform price auction. The solution of this game can be obtained using the concept of the non-cooperative equilibrium originating from the Nash idea. Based on the so called residual demand curve, we can derive the best response function of each generation company in the uniform pricing auction with N companies, analytically. Finally, we present an efficient means to obtain all the possible equilibrium set pairs and to examine their feasibilities as Nash equilibriums. A simple numerical example with three generation companies is demonstrated to illustrate the basic idea of the proposed methodology. From this, we can see the applicability of the proposed method to the real-world problem, even though further future analysis is required.

The Contribution of Innovation Activity to the Output Growth of Emerging Economies: The Case of Kazakhstan

  • Smagulova, Sholpan;Mukasheva, Saltanat
    • Journal of Distribution Science
    • /
    • v.10 no.7
    • /
    • pp.33-41
    • /
    • 2012
  • The purpose of this study is to analyse the state of the energy industry and to determine the efficiency of its functioning on the basis of energy conservation principle and application of innovative technologies aimed at improving the ecological modernisation of agricultural sectors of Kazakhstan. The research methodology is based on an integrated approach of financial and economic evaluation of the effectiveness of the investment project, based on calculation of elasticity, total costs and profitability, as well as on comparative, graphical and system analysis. The current stage is characterised by widely spread restructuring processes of electric power industry in many countries through introduction of new technical installations of energy facilities and increased government regulation in order to enhance the competitive advantage of electricity market. Electric power industry features a considerable value of creating areas. For example, by providing scientific and technical progress, it crucially affects not only the development but also the territorial organisation of productive forces, first of all the industry. In modern life, more than 90% of electricity and heat is obtained by Kazakhstan's economy by consuming non-renewable energy resources: different types of coal, oil shale, oil, natural gas and peat. Therefore, it is significant to ensure energy security, as the country faces a rapid fall back to mono-gas structure of fuel and energy balance. However, energy resources in Kazakhstan are spread very unevenly. Its main supplies are concentrated in northern and central parts of the republic, and the majority of consumers of electrical power live in the southern and western areas of the country. However, energy plays an important role in the economy of industrial production and to a large extent determines the level of competitive advantage, which is a promising condition for implementation of energy-saving and environmentally friendly technologies. In these circumstances, issues of modernisation and reforms of this sector in Kazakhstan gain more and more importance, which can be seen in the example of economically sustainable solutions of a large local monopoly company, significant savings in capital investment and efficiency of implementation of an investment project. A major disadvantage of development of electricity distribution companies is the prevalence of very high moral and physical amortisation of equipment, reaching almost 70-80%, which significantly increases the operating costs. For example, while an investment of 12 billion tenge was planned in 2009 in this branch, in 2012 it is planned to invest more than 17 billion. Obviously, despite the absolute increase, the rate of investment is still quite low, as the total demand in this area is at least more than 250 billion tenge. In addition, industrial infrastructure, including the objects of Kazakhstan electric power industry, have a tangible adverse impact on the environment. Thus, since there is a large number of various power projects that are sources of electromagnetic radiation, the environment is deteriorated. Hence, there is a need to optimise the efficiency of the organisation and management of production activities of energy companies, to create and implement new technologies, to ensure safe production and provide solutions to various environmental aspects. These are key strategic factors to ensure success of the modern energy sector of Kazakhstan. The contribution of authors in developing the scope of this subject is explained by the fact that there was not enough research in the energy sector, especially in the view of ecological modernisation. This work differs from similar works in Kazakhstan in the way that the proposed method of investment project calculation takes into account the time factor, which compares the current and future value of profit from the implementation of innovative equipment that helps to bring it to actual practise. The feasibility of writing this article lies in the need of forming a public policy in the industrial sector, including optimising the structure of energy disbursing rate, which complies with the terms of future modernised development of the domestic energy sector.

  • PDF

A Contemplation on Measures to Advance Logistics Centers (물류센터 선진화를 위한 발전 방안에 대한 소고)

  • Sun, Il-Suck;Lee, Won-Dong
    • Journal of Distribution Science
    • /
    • v.9 no.1
    • /
    • pp.17-27
    • /
    • 2011
  • As the world becomes more globalized, business competition becomes fiercer, while consumers' needs for less expensive quality products are on the increase. Business operations make an effort to secure a competitive edge in costs and services, and the logistics industry, that is, the industry operating the storing and transporting of goods, once thought to be an expense, begins to be considered as the third cash cow, a source of new income. Logistics centers are central to storage, loading and unloading of deliveries, packaging operations, and dispensing goods' information. As hubs for various deliveries, they also serve as a core infrastructure to smoothly coordinate manufacturing and selling, using varied information and operation systems. Logistics centers are increasingly on the rise as centers of business supply activities, growing beyond their previous role of primarily storing goods. They are no longer just facilities; they have become logistics strongholds that encompass various features from demand forecast to the regulation of supply, manufacturing, and sales by realizing SCM, taking into account marketability and the operation of service and products. However, despite these changes in logistics operations, some centers have been unable to shed their past roles as warehouses. For the continuous development of logistics centers, various measures would be needed, including a revision of current supporting policies, formulating effective management plans, and establishing systematic standards for founding, managing, and controlling logistics centers. To this end, the research explored previous studies on the use and effectiveness of logistics centers. From a theoretical perspective, an evaluation of the overall introduction, purposes, and transitions in the use of logistics centers found issues to ponder and suggested measures to promote and further advance logistics centers. First, a fact-finding survey to establish demand forecast and standardization is needed. As logistics newspapers predicted that after 2012 supply would exceed demand, causing rents to fall, the business environment for logistics centers has faltered. However, since there is a shortage of fact-finding surveys regarding actual demand for domestic logistic centers, it is hard to predict what the future holds for this industry. Accordingly, the first priority should be to get to the essence of the current market situation by conducting accurate domestic and international fact-finding surveys. Based on those, management and evaluation indicators should be developed to build the foundation for the consistent advancement of logistics centers. Second, many policies for logistics centers should be revised or developed. Above all, a guideline for fair trade between a shipper and a commercial logistics center should be enacted. Since there are no standards for fair trade between them, rampant unfair trades according to market practices have brought chaos to market orders, and now the logistics industry is confronting its own difficulties. Therefore, unfair trade cases that currently plague logistics centers should be gathered by the industry and fair trade guidelines should be established and implemented. In addition, restrictive employment regulations for foreign workers should be eased, and logistics centers should be charged industry rates for the use of electricity. Third, various measures should be taken to improve the management environment. First, we need to find out how to activate value-added logistics. Because the traditional purpose of logistics centers was storage and loading/unloading of goods, their profitability had a limit, and the need arose to find a new angle to create a value added service. Logistic centers have been perceived as support for a company's storage, manufacturing, and sales needs, not as creators of profits. The center's role in the company's economics has been lowering costs. However, as the logistics' management environment spiraled, along with its storage purpose, developing a new feature of profit creation should be a desirable goal, and to achieve that, value added logistics should be promoted. Logistics centers can also be improved through cost estimation. In the meantime, they have achieved some strides in facility development but have still fallen behind in others, particularly in management functioning. Lax management has been rampant because the industry has not developed a concept of cost estimation. The centers have since made an effort toward unification, standardization, and informatization while realizing cost reductions by establishing systems for effective management, but it has been hard to produce profits. Thus, there is an urgent need to estimate costs by determining a basic cost range for each division of work at logistics centers. This undertaking can be the first step to improving the ineffective aspects of how they operate. Ongoing research and constant efforts have been made to improve the level of effectiveness in the manufacturing industry, but studies on resource management in logistics centers are hardly enough. Thus, a plan to calculate the optimal level of resources necessary to operate a logistics center should be developed and implemented in management behavior, for example, by standardizing the hours of operation. If logistics centers, shippers, related trade groups, academic figures, and other experts could launch a committee to work with the government and maintain an ongoing relationship, the constraint and cooperation among members would help lead to coherent development plans for logistics centers. If the government continues its efforts to provide financial support, nurture professional workers, and maintain safety management, we can anticipate the continuous advancement of logistics centers.

  • PDF