An Economic Assessment for APR+ Standard Detailed Design Developing Phase

APR+ 표준상세설계 개발단계에서의 경제성 평가

  • Received : 2012.06.12
  • Accepted : 2012.08.24
  • Published : 2012.09.30

Abstract

KHNP CRI has been developing APR+ nuclear power plant since 2007, which is GEN III+ model with 4,361 MWth capacity. To develop safer and more economical nuclear power plant than APR1400, we studied domestic and foreign nuclear power plants under construction. We also reviewed nuclear power plants which are appropriate for domestic construction in Korea and also for export. Economic assessments were made twice during the second phase of standard detailed design of the plant. The result of the second phase of economic analysis for APR+ standard detailed design showed that APR+ N-th plant was 24.6% more economical than coal-fired 1,000MW power plant, and was evaluated to be competitive enough in global market for construction of the nuclear power plant.

한수원 중앙연구원은 2007년부터 정부과제의 하나로 열출력 4361MWt GEN.III+ 원전인 APR+를 개발하고 있다. APR1400에 비해 보다 개선된 안전성과 경제성을 갖는 원전을 개발하기 위해 국내외 건설 중인 원전설계와 해외 개발 중인 ALWR(Advanced Light Water Reactor)의 설계내용 및 후쿠시마 원전사고로부터 도출된 개선사항을 반영하여 한국 실정에도 맞고, 해외 수출형 원전에도 부합되는 신개념원전 설계를 진행하고 있다. 기술개발 2단계인 표준상세설계에서 2회의 경제성 평가가 수행되었다. 2단계 표준상세설계 2차 경제성 평가결과 APR+ N-th호기는 국내석탄화력 1000MWe급 대비 24.6% 경쟁력우위와 해외원전 대비 충분한 경쟁력을 갖는 것으로 평가되었다.

Keywords

References

  1. EPRI, Technical Assessment Guide, Volume 1, Rev.7, Page 6-1-6-20, 1993
  2. EPRI, Technical Assessment Guide, Volume 3, Rev.7, Page 5-1-5-16, 1997
  3. EPRI, ALWR Cost Estimatng Groudrules, 1995
  4. 한수원 중앙연구원, APR+ 2단계 표준상세설계개발 세부3 과제 경제성평가보고서(2차), Mar. 2012
  5. OECD/IEA, Projected Costs of Generating Electricity 2010 Edition, 2010
  6. 지식경제부, 제 5차 전력수급기본계획(2010-2024), 2010
  7. 지식경제부, 피동안전설비 적용 기술개발, APR+ 1단계 세부 2과제, 2010
  8. 한국전력공사, 차세대원자로기술개발(II) 경제성평가 최종보고서, Feb. 1999
  9. 지식경제부고시 제2011-197호, Oct. 2011