• Title/Summary/Keyword: Compensation plan

Search Result 155, Processing Time 0.026 seconds

Support strategy for industrial injured workers: focusing on trial work (산재장해인 재취업 지원방안: 시험고용(인턴) 제도를 중심으로)

  • Jo, Sungjae;Kim, Min;Song, Changkeun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.259-269
    • /
    • 2019
  • The purpose of this study is to investigate the necessity and activation plan of trial work to increase the re-employment of injured industrial workers. This study applied an internet and paper questionnaire method to 1,058 employers listed in the Korea Workers' Compensation and Welfare Services. The employers were asked about their experiences with trial work and their preferences for supports. From September 2018, the survey was conducted for 6 weeks and a total of 201 questionnaires were analyzed. Descriptive analysis and t-tests were applied. The results of the study showed that the trial work system satisfied the employers who participated in it. In order for this system to operate smoothly for injured workers, it is necessary to simplify the system's procedures, increase the amount of the trial work subsidy, and improve the amount of support after the workers convert to full time employment. In order for employers to use the new system, $750 per month will be provided for 8 months when hiring one injured worker. Eighty percent of employers stated that they would hire injured workers if the subsidy and application period are accepted. Future study and suggestions for applying the trial work system for injured industrial workers are also discussed.

A Study on the Way to Reduce Cadastral Renovation Business Period through Compensation System Improvement - Centered around the Namwon-si Cadastral Research Area - (지적재조사 조정금 산정 및 부과 방식의 개선 연구 - 남원시 지적재조사사업지구를 중심으로 -)

  • Kim, Hong-Ryeol;Min, Woong-kie
    • Journal of Cadastre & Land InformatiX
    • /
    • v.50 no.2
    • /
    • pp.53-68
    • /
    • 2020
  • The Cadastral Renovation is a National project to investigate and survey the registration of Cadastral Record and replace the existing Cadastral Record with a new Cadastral Record by digital, and to correct the registration of Cadastral Record if the registration of Cadastral Record does not match the actual status of the land. The Business Period generally takes about one year and six months to two years. The time required is getting longer due to problems that occur in the course of the Adjustment amount after the cadastral resurvey survey due to complex structure and internal conflict due to the interest between landowners. After Boundary Decision of the real boundary, the land area is confirmed by the landowners, and the cadastral office is to settle the Cadastral Renovation by calculating the Adjustment amount according to the confirmed area and the increase and decrease of the cadastral area. Therefore, the solution plan was suggested so that reasonable Adjustment amount can be applied through empirical research applied to the time of calculation of Adjustment amount and the method of calculation of Adjustment amount. The improvement method showed the expected effect that can lead the agreement with the landowner to the shortest period, and it was also possible to set the real boundary that meets the purpose of the Cadastral Renovation. This study suggests improvements in the method of calculating standard Adjustment amount, the method of imposing Adjustment amount, and the method of boundary adjustment that does not impose adjustment amount through the cadastral Renovation and parallel studies, and it is expected that the Cadastral Renovation will be completed by 2030.

Convergence Plan of IT Social Safety and SIB by Expanding Sharing Information Data (공유정보 데이터 확대로 인한 IT와 SIB의 사회인식)

  • Seo, DaeSung;Lim, HeonWook
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.97-105
    • /
    • 2022
  • This study deals with the credibility of citizens when investing in uncertain project companies, as well as the Social Performance Compensation Project (SIB) and the IT sharing economy. This allows the convergence of the three sectors to address investment inequalities in economic effectiveness and social security. Activates the model of the overall Social Impact Bond (SIB) process that successfully activates the exchange of information. The empirical presentation of the operations and techniques for social IT service finance examines how the innovation ecosystem can be created with social performance and reward projects. The analysis shows that small sharing institutions or citizens can participate directly to create the ability to connect with private investors, identify the possibility of recognizing non-shared barriers to participation, and show the great impact of citizen trust in IT sharing projects in uncertain areas. As a result, for the sake of social sharing and IT cooperation promoted by the City of Seoul, before the project has the ability to design directly, it will be responsible for reliability and safety in the planning of the project. Therefore, non-shared citizens can also participate in the platform that has been effectively constructed and created.

A study of measures to improve the system for the construction of deep tunnels in urban area (도심지 대심도 터널 건설을 위한 제도개선 방안 연구)

  • Hoonki Moon;Joon-Shik Moon;Jongho Shin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.6
    • /
    • pp.469-478
    • /
    • 2023
  • The deep tunnel in urban area is a future-oriented construction plan that allows the above-ground space to be used as an eco-friendly park and transportation infrastructure to be constructed in the underground space. However, tunnel construction is often depicted as to cause ground collapse in some media and movies. In fact, while the construction of a deep tunnel in the urban area is underway, the project face with difficulties due to opposition complaints from residents near the route. In this study, we sought to identify perceptions on deep space development and citizen concerns through a public opinion survey regarding deep tunnels. By analyzing laws relevant with the promotion of deep tunnel construction, we reviewed the possibility of public engagement at each stage of the construction and investigated separated surface rights related to compensation for underground space. Through the results of the public opinion survey, it was identified that the concerns of citizens were problems that current technology could solve. Citizen's concerns were improved into a system that confirmed the stability of tunnel construction through public participation, and improvement measures were presented to encourage cooperation from those concerned regarding the establishment of divided superficies.

Study on the Proposal for Deposit Linkage Plan Based on the Survey of Online Material Identification System (온라인 자료 식별체계 실태조사를 기반으로 한 납본연계방안 제안 연구)

  • Younghee Noh;Aekyoung Son;Kyung Sun Lee;Inho Chang;Youngmi Jung;Hyunju Cha
    • Journal of the Korean Society for information Management
    • /
    • v.41 no.1
    • /
    • pp.133-162
    • /
    • 2024
  • The rapid digitalization has highlighted the importance of identifying and managing online resources. Especially, the need for a systematic identification system for the efficient distribution and preservation of digital content is growing. This study aims to respond to these contemporary demands by investigating the current state of identification systems for online resources and exploring more systematic management and utilization methods through linking these systems with legal deposit. To achieve this, the study surveyed the identification systems and their issuance status for online resources and analyzed prior research related to these online resources. Based on the analysis, the proposed strategies for linking with legal deposit can be summarized into three categories: First, to prioritize and enhance the utilization of legal deposit, strategies are required to strengthen the mutual complementarity of deposit and use, to assign priorities to certain deposits, and to increase the usability of deposited materials. Second, as strategies based on international standard numbers for linking with legal deposit, it is necessary to integrate ISBN and UCI in the deposit process, to link international standard resource numbers with deposit, to interconnect metadata between international standard numbers and UCI, to integrate UCI and ICN, and to introduce automation technology for upgrading the deposit system. Third, to effectively implement the aforementioned strategies, policy support is essential. This includes enhancing the role of the Korean Bibliographic Standards Center, strengthening cooperation with publishers, compensating for deposited materials, and increasing awareness and institutional compensation for the legal deposit system.

A Study on the Construction Demand for Network of Metro Railroad in Busan-Ulsan-Gyeongnam Area - In the place of National Road No.7 - (부울경 광역도시철도망 구축 필요성에 관한 연구 - 국도 7호선 중심으로 -)

  • Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.771-778
    • /
    • 2011
  • Preliminary feasibility study on Busan metro line #1 in Yangsan line (Nopo-Bukjeong) depending on active volume of mass transportation between Yangsan city and Busan city was conducted. As the study concluded that it's valid, the necessity to establish the metro railroad network connecting to Busan, Ulsan and Gyeongnam Province is demanded to improve the transportation issues in Ungsang area vulnerable to metro service and to drive the balanced development between metropolitan cities. In addition, the volume of transportation depending on methods in target areas and road traffic assignment are surveyed to put a stress on the necessity to establish the metro railroad network. As the demand of transportation for alternative lines is predicted, the budget and benefits for construction for each alternative line set for the rough economic analysis depending on traffic volume for each method and traffic assignment results. The total project budget necessary for construction of proposal line #1 set as effective one among target three lines in this project is calculated in 794.32 billion won. Construction accounts for the most expensive in expenses for project and contingency allowances, purchases for vehicles and collateral expense are followed in orders. However, compensation for lands is not counted. In particular, according to economic analysis in proposal #1, ratio of benefit/cost (B/C) is 0.584, net present value (NPV) is -217.47 billion won, the internal rate of return (IRR) is analyzed in 0.604 %. At the current stage, it is not economically feasible, but the B/C is 0.737 in long-term upon construction of Yangsan line between Wolpheong and Yongdang which is proposal line #3. Therefore, when Busan metro basic plan is reorganized to aim the benefit of residents in Ungsang area vulnerable to the metro service, we think it must be necessary to establish the metro railroad network connecting to Busan-Yangsan-Ulsan which is proposal line #2 by extending the existing Sinjeong line and including this task line in high-ranked plan related to metro railroad.

The Private-Initiated Park Development Project in Terms of Securing Publicity Operation Characteristics Analysis - Busan Metropolitan City as a Case - (공공성 확보측면에서 민간공원특례사업 운영특성분석 - "부산광역시를 사례로" -)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.1
    • /
    • pp.13-28
    • /
    • 2023
  • This study examines the process of project promotion in Busan, which introduced the private participation-type consultative body for the first time in the country in the promotion stage of the private-initiated park development project, and introduced flexible application of the system and differentiated policy elements in the implementation process, and examines the operational characteristics and we tried to analyze performance, etc. As a result of the analysis, first, the preferred bidder was selected by introducing a mixed method in the project method, which is an independent project method that cannot be seen in other local governments. Second, by specifying guidelines considering the characteristics of each park and detailed guidelines such as the location, area, and maximum height of non-park facilities, criteria for establishing a rational development plan utilizing regional identity and the basis of evaluation standards were laid. Third, in the project process, transparency was secured through the delegation-type roundtable, in which the private sector performs the functions and roles of key actors, thereby preventing disputes such as suspicion of preferential treatment. Fourth, in order to improve the quality of park facilities to be donated and to secure design adequacy, after approval of the implementation plan, a general planner was introduced and construction project management (design stage) services were performed to promote efficient implementation and specialization of luxury parks in the region. As a result, the city of Busan carried out the project efficiently by conserving 5 parks from sunset, a park area of 2.25km2, and reducing land compensation and park construction costs by KRW 740 billion. Reinforcement of the public nature of the private-initiated park development project was suggested. However, due to the application of these systems and verification procedures, the project period is prolonged, and park services are delayed along with the financial burden on private operators.

Evaluation of a colloid gel(Slime) as a body compensator for radiotherapy (Colloid gel(Slime)의 방사선 치료 시 표면 보상체로서의 유용성 평가)

  • Lee, Hun Hee;Kim, Chan Kyu;Song, Kwan Soo;Bang, Mun Kyun;Kang, Dong Yun;Sin, Dong Ho;Lee, Du Heon
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.30 no.1_2
    • /
    • pp.191-199
    • /
    • 2018
  • Purpose : In this study, we evaluated the usefulness of colloid gel(slime) as a compensator for irregular patient surfaces in radiation therapy. Materials and Methods : For this study, colloid gel suitable for treatment was made and four experiments were conducted to evaluate the applicability of radiation therapy. Trilogy(Varian) and CT(SOMATOM, Siemens) were used as treatment equipment and CT equipment. First, the homogeneity according to the composition of colloid gel was measured using EBT3 Film(RIT). Second, the Hounsfield Unit(HU) value of colloid gel was measured and confirmed by CRIS phantom, Eclipse RTP(Eclipse 13.1, Varian) and CT. Third, to measure the deformation and degeneration of colloid gel during the treatment period, it was measured 3 times daily for 2 weeks using an ion chamber(PTW-30013, PTW). The fourth experiment was compared the treatment plan and measured dose distributions using bolus, rice, colloid gel and additional, dose profiles in an environment similar to actual treatment using our own acrylic phantom. Result : First experiment, density of the colloid gel cases 1, 2 and 3 was $1.02g/cm^3$, $0.99g/cm^3$ and $0.96g/cm^3$. When the homogeneity was measured at 6 MV and 9 MeV, case 1 was more homogeneous than the other cases, as 1.55 and 1.98. In the second experiment, the HU values of case 1, 2, 3 were 15 and when the treatment plan was compared with the measured doses, the difference was within 1 % at all 9, 12 MeV and a difference of -1.53 % and -1.56 % within the whole 2 % at 6 MV. In the third experiment, the dose change of colloid gel was measured to be about 1 % for 2 weeks. In the fourth experiment, the dose difference between the treatment plan and EBT3 film was similar for both colloid gel and bolus, rice at 6 MV. But colloid gel showed less dose difference than bolus and rice at 9 MeV. Also, dose profile of colloid gel showed a more uniform dose distribution than the bolus and rice. Conclusion : In this study, the density of colloid gel prepared for radiation therapy was $1.02g/cm^3$ similar to the density of water, and alteration or deformation was not observed during the radiotherapy process. Although we pay attention to the density when manufacturing colloid gel, it is sufficient in that it can deliver the dose uniformly through the compensation of the patient's body surface more than the bolus and rice, and can be manufactured at low cost. Further studies and studies for clinical applications are expected to be applicable to radiation therapy.

  • PDF

The Improvement Measurement on Dispute Resolution System for Air Service Customer (항공서비스 소비자 분쟁해결제도의 개선방안)

  • Lee, Kang-Bin
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.33 no.2
    • /
    • pp.225-266
    • /
    • 2018
  • In 2017, 1,252 cases of damages relief related to air passenger transport service were received by the Korea Consumer Agency, a 0.8% drop from 1,262 cases in 2016, the first decline since 2013. In 2017, 444 cases (35.4%) out of received cases of damages relief in the field of air passenger service received by the Korea Consumer Agency were agreed on, and out of cases that were not agreed on, the most number of 588 cases (47.0%) were concluded due to information provision and counseling, and 186 cases (14.9%) were applied to the mediation of the Consumer Dispute Mediation Committee. Major legislations that contain regulations for the damages relief and disputes resolution of air service consumers include the Aviation Business Act and the Consumer Fundamental Act, etc. The Aviation Business Act provides the establishment and implementation of damage relief procedure and handling plan, and the receiving and handling of request of damage relief by air transport businessman, and the notice of protection standard for air traffic users. The Consumer Fundamental Act provides the establishment and management of the consumer counseling organization, the damage relief by the Korea Consumer Agency, the consumer dispute mediation, and the enactment of the criteria for resolving consumer disputes. The procedures for damages relief of air service consumers include the receiving and handling of damages relief by air transport businessman, the counseling, and receiving and handling of damages relief by the Consumer Counseling Center, the advice of mutual agreement by the Korea Consumer Agency, and the dispute mediation system by the Consumer Dispute Mediation Committee. The current system of damage relief and dispute mediation for air service consumer have the problem in the exemption from obligation of establishment and implementation of damage relief plan by air transport businessman under the Aviation Business Act, the problem in the exemption from liability in case of nonfulfillment and delay of transport by aviation businessman under the criteria for resolving consumer disputes in the aviation sector, and the uppermost limit in procedure progress and completion of consumer dispute mediation under the Consumer Fundamental Act. Therefore, the improvement measurements of the relevant system for proper damage relief and smooth dispute mediation for air service consumer are to be suggested as follows: First is the maintenance of the relevant laws for damage relief of air service consumer. The exemption regulation from obligation of establishment and implementation of damage relief plan by air transport businessman under the Aviation Business Act shall be revised. To enhance the structualization and expertise of the relevant regulation for protection and damage relief of air service consumer, it will be necessary to prepare the separate legislation similar to the US Federal Regulation 14 CFR and EU Regulation EC Regulation 261/2004. Second is the improvement of criteria for resolving air service consumer disputes. For this, it will be necessary to investigate whether the cause of occurrence of exemption reason was force majeure, and distinguish the exemption from liability in case of nonfulfillment and delay of transport by aviation businessman under the criteria for resolving consumer disputes in the aviation sector, and revise the same as exemption reasons regulated under the air transport chapter of the Commercial Act and Montreal Convention 1999, and unify the compensation criteria for the nonfulfillment of transport that the substitute flight was provided and the delay of transport. Third is the reinforcement of information provision for damage relief of air service consumer. Aviation-related government agencies and concerned agencies should cooperate with airlines and airports to provide rapidly and clearly diverse information to the air traffic users, including laws and policies for damages relief of air service consumers. Fourth is the supplement to the effectiveness, etc. of consumer dispute mediation. If there is no sign of acceptance for dispute mediation, it is not fair to regard it as acceptance, therefore it will be necessary to add objection system. And if a dispute resolution is requested to another dispute settlement agency in addition to the Consumer Dispute Mediation Committee, it is excluded from the damage relief package, but it should be allowed for the party to choose a mediation agency. It will be necessary to devise the institutional measures to increase the completion rate of mediation so that the consumer dispute can be resolved efficiently through the mediation. Fifth is the introduction of the air service consumer arbitration system. A measure to supplement the limitations of the consumer dispute mediation system is to introduce the consumer arbitration system, but there are two measurements which are the introduction of the consumer arbitration under the Consumer Fundamental Act and the introduction of the consumer arbitration under the Arbitration Act. The latter measurement is considered to be appropriate. In conclusion, as a policy task, the government should prepare laws and system to enhance the prevention and relief of damages and protection of the rights and interests of air service consumers, and establish and implement the consumer-centric policy for the advancement of air service.

The Change of Total Scan Time in Accordance with the Time of the Decision of Scan Time (스캔 시간의 결정시기에 따른 총 스캔 시간 변화에 관한 연구)

  • Lee, Jong-Hun;Ryu, Jae-Kwang;Chung, Woo-Young
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.13 no.3
    • /
    • pp.81-85
    • /
    • 2009
  • Purpose: The examination of nuclear medicine observes the change in accordance with the time elapsed in the same region purposed and there are many examinations to acquire the image during the same term. At this time, the same parameter should be applied. The hepatobiliary scan, lung scan etc, are the acquired examination in the divided time with a regular term. Pre-set time that is applied in continued next image is set in order to acquire the fixed counts. The same scan time should be applied for each image. This study will look for the rational plan and analyze the change of scan time in accordance with the time of the decision of scan time at examination that pre-set time is applied. Methods: The hapatobiliary scan that use the radio pharmaceutical $^{99m}Tc$-mebrofenin is choosed as compensation from Jan. 2009 to Mar. 2009 in the department of nuclear medicine in ASAN MEDICAL CENTER. Scan is started after 5 minutes from when 222 MBq (6 mCi) is injected to patient. We let patient stand up between both detectors, and possibly close to the front of detector. When scan time reach 10%, 25%, 50%, 75% of total scan time, we measured the expected total scan time. After finishing all of scan, we compared the total scan time and the expected total scan time, while image is acquiring. and we observed the change of scan time in accordance with radio activity by using phantom. Results: After starting scan, a difference of when scan time reach 10%, 25%, 50%, 75% of total scan time is that the biggest difference is 5 seconds on 10%. There statistically is difference between 25% (t:2.88, p<0.01) and 50% (t:2.05, p<0.01). Conclusions: When the same the scan time is applied in the examination that acquire the many frame, concluding the same scan time has a important effect on a quantitative analysis. Although method that decide the scan time after finish all of the examinations, there is a few problem to apply practical affairs. This may cause an inaccurate result on the examination that need a quantitative analysis. We think that operator should try to improve it. At least, after reach 50% of total scan time, deciding the total scan time mean that you can minimize error of a quantitative analysis caused by unmatched scan time from a gap of image.

  • PDF