In order to make use of finished municipal landfill as a construction site, it is necessary to consider environmental and geotechnical aspects for the ground improvement and application of waste landfill. In environmental aspect, methods for management of landfill gas and leachate have to be established, and in geotechnical aspect, it is necessary to investigate available method for constructing structure foundation. In this study, the finished landfill was selected for pilot test. Investigation about the environmental characteristics of the waste landfill was performed to establish the methods far management of landfill gas according to monitoring the gas quantity and to investigate economical efficiency according to utilizing landfill gas. Investigation about cases of utilizing the waste landfill in Korea and abroad as construction site was performed and pilot tests were performed to analyze the improvement effects of methods such as dynamic compaction method and PG pile method available to waste landfill. The results of this study showed that economical profits could be gained by utilizing landfill gas and improved waste landfill, besides, dynamic compaction method was effective in case of improvement depth being shallow, and PG pile method was effective in case of improvement depth being deep.
Proceedings of the Korea Concrete Institute Conference
/
2008.11a
/
pp.509-512
/
2008
The lining concrete of water tunnel is a much capability to occur crack due to drying shrinkage and vibrator compaction etc. Because of crack of concrete induce structural problem and decrease durability of concrete, it is need to reduce crack of concrete. In this an Analytical study to analyze the effect of curing of concrete and compaction on the lining concrete. As the results, it was found that control of construction condition into curing of concrete and compaction improve on construction efficiency of the lining concrete.
When underground pipe is installed, backfill materials need proper compaction. But in case of circular underground pipe, compaction of backfill material is difficult and compaction efficiency is poor at beloe the pipe. It caused the stability of underground pipe is reduced and various damages occurred. One of the solutions to solve this problem for underground pipe is to use controlled low strength material (CLSM). CLSM is made by concept of low strength concrete, which is applied to geotechnical engineering field. The representative characteristics of CLSM are self-leveling, self-compacting and flowability. In addition, its strength can be controlled and its construction method is simple. The behavior of underground pipe was investigated by finite element analysis for various backfill materials under same condition. As a result, in case of using the CLSM as backfill material, surface settlement and displacement of pipe are reduced comparing with those in case of using field soil or sand.
Purpose: Dynamic Replacement Method currently lacks of sufficient research, implementation cases, and case histories, compared with other comparable methods, such as Dynamic Compaction Method. Method: In this study, for Dynamic Replacement Method, the effective improvement depth and improved strength were analyzed for silty clayey soils. Results: Testbed test was performed to verify the effectiveness of Dynamic Replacement Method followed by the main dynamic replacement implementation on real construction site. Conclusion: A The effects of changes of soft ground depth, dynamic replacements' diameter, depth, spacing, and applied energy on dynamic replacement efficiency in silty clays were assessed and the followings were found: Empirical coefficient for soil $n_R$ of Dynamic Replacement Method was within the range of 0.14~0.32 and its ${\sqrt{WH}}$ is recommended to be 1.25~2.5 times of those from Dynamic Compaction Method.
Seo, Seok-Hyun;Lee, Jung-Sang;Jung, Eui-Youp;Park, Sang-Yeong;Lee, Hyo-Bum
Journal of the Korean Geosynthetics Society
/
v.19
no.4
/
pp.11-20
/
2020
This study introduced the compact grouting method that can be used for improving soft ground and restoring buildings with unequal subsidence. The pump used in the traditional compact grouting method is a system that injects one hole each, which reduces the construction efficiency, and the analog injection method manually manages the construction by field workers, making it difficult to manage consistent quality. Pump and quality control system were developed to solve problems in existing construction. Since field supervisor determines amount of injected materials by using analog equipment and controls manually, it is difficult to manage consistent quality of construction. Therefore, the quality control system was developed in order to solve that problem. The quality control system consists of automatic mixing system of injection materials, multiple simultaneous injection pumps, and injection management monitoring system. Performance of the quality control system was verified through on-site testing, and ground improvement performance was verified through quality testing after testing and testing of the compact grouting method. Therefore, it is expected that the integrated quality control system developed will improve the quality assurance and efficiency and stability of construction at sites where construction and quality verification are difficult.
Typical flow regime of overflow at barrier or weir constructed in mid and small streams becomes as the submerged flow during most flood events. One of major causes of barrier failure has been reported as the levee-scour near the conjuction node between barrier and levee. However, most related design guidelines in Korea have not mentioned about the protection of levee around barrier or weir in detail. Furthermore, most previous researches have focused on the flow characteristics of overflow around several types of weirs but they did not have considered the material properties of levee itself. In this study, local scour near barrier was investigated with different material properties of levee under the submerged overflow condition which is assumed to reenact a flood event. Based on results from Fritz et al. and Mavis et al., a theoretical formula was also proposed in initial stage of laboratory experiments. And hydraulic experiments were carried out for the verification of the proposed formula. Levee was installed in the prismetic trapezoidal open channel and most parts were made of concrete except for movable section in which scour was expected to occur for the efficiency of experimental procedure. Each compaction of movable section in levee was followed by the basis of the KS F 2312. Further, after performing the experiments to find the optimum water content for each sediment, the specific amount of water was injected before flowing water. The difference between the proposed theoretical formula and experiment results was not much but considerable, which might be caused by the effect of compaction. For theoretical approach, it seemed that the formula did not take into account the compaction of levee, thus the correction coefficient for levee compaction determined in the literature was considered. Finally, the formula for the length of scour around barrier or weir was proposed, which can be useful to predict a levee in the reference design of revetment in mid and small streams. As shortly future study, scour length of levee around barrier or weir under different flow conditions such as perfect overflow condition will be studied and it will be able to contribute to suggest the design formula or criteria under all overflow conditions near barrier or weir.
The strength, water permeability, and photo-degradation efficiency of NOx of porous concrete with a new concept were studied in this paper. The porous concrete was comprised of coarse aggregate of maximum size 40 mm, cement, silica fume, water and air-entraining(AE) water reducing agent. The strength of porous concrete was strongly related to its matrix proportion and compaction energy. An experimental test was carried out to study the parameters of cement proportions and silica fume content for pavement applications of porous concrete which were paving a footpath, a bikeway, a parking lot, and a driveway. The regressed equations of relation-ships between compressive strength and flexural strength, and coefficient permeability and void ratios were indicated as y=7.69x+71.74 and $y=0.42e^{0.28x}$. A method of making an air purification-functioning road, which was spraying a mixture of a photocatalyst, cement, and water onto the surface of the road, was suggested.
Park, Jae-Hun;Lee, Kwan-Ho;Jo, Jae-Yun;Sung, Sang-Kyu
International Journal of Highway Engineering
/
v.5
no.2
s.16
/
pp.25-35
/
2003
During construction of circular lifeline pipe, the non-proper compaction along the pipe and the decrease of compaction efficiency are the main problems to induce the failure of underground pipe. The use of CLSM(controlled low strength materials) is one of the applications to overcome those problems. In this research, the numerical analysis by PENTAGON FEM program was carried out for 20 cases with the couple of combinations on bedding materials, backfill materials, and pipes. From the FEM analysis, the use of CLSM as backfill materials reduced the settlement of ground surface and the deformation of pipe employed. In case of the vertical deformation on the pipe, common soil backfill for flexible pipes showed 2 times for rigid pipes, but CLSM backfill case did less deformation than the soil backfill for rigid pipes. CLSM backfills for rigid pipes showed the similar results. Judging from the FEM analysis, the use of CLSM increases the structure capacity of the underground pipes.
In the case of the existing method of underground pipe construction, the difficulty of the bedding compaction of pipe causes reducing the compaction efficiency and the stability of the underground facilities and conclusively damaging the structures. One of the methods to solve these problem is using the flowable fills as a backfill material. Therefore, in this study, numerical analysis of the underground pipe was performed in order to evaluate the behavior of pipe according to backfill mixtures. To estimate the deformation characteristic of the underground pipe, the displacement of the main part of the pipe, ground settlement and vertical earth pressures were measured in different backfill mixtures and maintaining the other conditions constantly. As a result of numerical analysis, using the flowable fills as the backfill material is better than using sand in reducing the ground settlement, the pipe deformation and the vertical earth pressure aspect.
The Journal of Korean Institute of Communications and Information Sciences
/
v.16
no.11
/
pp.1103-1116
/
1991
The characteristics of transform coefficients of discrete Gabor transform and the performances of their progressive coding are investiganted. The adaptive transform coding SAC is used for the progressive transmission. Exprerimental results show that although DGT has relatively low energy compaction property and coding efficiency, it yields good quality with greaty reduced block artifact and good edge at each stage of the progressive transmission.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.