• Title/Summary/Keyword: Compaction Grouting

Search Result 39, Processing Time 0.034 seconds

Effect of Overburden Stress on Bulb Shapes of Horizontal Compaction Grout in Loose Sand: 2D-scaled Experimental Study (상부 응력이 수평 압밀 그라우팅 구근 형상에 미치는 영향: 2차원 축소 모형 실험 연구)

  • Joo, Hyun-Woo;Baek, Seung-Hun;Kwon, Tae-Hyuk;Han, Jin-Tae;Lee, Ju-Hyung;Yoo, Wan-Kyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.12
    • /
    • pp.107-116
    • /
    • 2020
  • The compaction grouting technique is widely used to improve the liquefaction resistance of loose sands that are liquefaction-prone. Particularly, the horizontal injection of compaction grout is proposed for the liquefiable ground with an overlying structure as it does not allow the vertical compaction grouting. However, there has been limited number of researches on the horizontal compaction grouting. Therefore, this study explores the grout bulb shape and expansion direction in loose sand. A series of scaled two-dimensional experiments on the horizontal compaction grouting was conducted varying the overburden stress. The results show that the grout bulb grows in an elliptical shape though its directivity of major axis changes with the overburden effective stress and relative density. The grout bulb expands faster in a horizontal direction under a low overburden stress with a small relative density. The higher overburden stress and the greater relative density cause the more circular shape with the faster expansion in a vertical direction. The presented finding is expected to contribute to accurate and efficient design of the horizontal compaction grouting method.

An analytical solution for compaction grouting problem considering exothermic temperature effect of slurry

  • Chao Li;Yingke Liu;Man Yuan;Tengrui Yang
    • Geomechanics and Engineering
    • /
    • v.35 no.6
    • /
    • pp.593-601
    • /
    • 2023
  • In this paper, an analytical solution of large-strain cylindrical cavity expansion in compaction grouting problem under temperature field is given. Considering the stress increment caused by temperature, the analytical solution of cavity expansion under traditional isothermal conditions is improved by substituting the temperature stress increment into the cavity expansion analysis. Subsequently, combined with the first law of thermodynamics, the energy theory is also introduced into the cylindrical cavity expansion analysis, and the energy dissipation solution of cylindrical cavity expansion is derived. Finally, the validity and reliability of solution are proved by comparing the results of expansion pressure with those in published literatures. The results show that the dimensionless expansion pressure increases with the increase of temperature, and the thermal response increases with the increase of dilation angle. The higher the exothermic temperature of grouting slurry, the greater the plastic deformation energy of the surrounding soil, that is, the greater the influence on the surrounding soil deformation and the surrounding environment. The proposed solution not only enrich the theoretical system of cavity expansion, but also can be used as a theoretical tool for energy geotechnical engineering problems, such as CPT, nuclear waste disposal, energy pile and chemical grouting, etc.

Reinforcement of Building Foundation by the Low Slump Mortar Grout (저유동성 몰탈형 주입재에 의한 건물기초보강)

  • 천병식;고용일;권형석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.71-76
    • /
    • 2000
  • In generally, grouting consists of injecting a suspension or solution into the voids of soils. The low slump mortar grout has been used in America since 1950's. The Compaction Grouting, the injection of a very stiff under relatively high pressure, form a cylinderical grout support pile. The grout generally does not enter soil pores but remains in homogeneous mass that gives controlled displacement either to compact loose soils, or for lifting of structures, or both. In this paper, on the case of the reinforcement construction of 00 plant that the foundation's bearing capacity is insufficient and is to reinforce the foundation, a study has been peformed to analyze the effectiveness of the ground improvement. The bearing capacity of the Compaction Pile has been verified by the S.P.T and the settlement of the improved ground has been monitored rising the magnetic extensometer.

  • PDF

Study on Applicability of Simultaneous Multiple Compaction Grouting Method in Soft Clay Ground (점성토 연약지반에서의 다중 동시주입 컴팩션 그라우팅 공법 적용성 연구)

  • Lee, Hyobum;Jung, Hyun-Seok;Jung, Eui-Youp;Choi, Hangseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.779-788
    • /
    • 2019
  • The compaction grouting method is one of the conventional ground improvement methods, which consolidates and compacts the surrounding ground through the injection of grout materials with low mobility. Injecting the grout into the ground can improve the soil properties, as well as form a composite of soil-grout columns. However, the conventional grout pumping is not applicable to handle multiple injection holes at the same time, which may diminish its constructability when the construction time is not enough. This paper proposes a simultaneous multiple compaction-grouting method using a new pump system developed to cover up simultaneously three injection holes at a time. Field injection tests with a single injection hole and with triangular arrangement of injection holes were conducted to evaluate the applicability of the proposed method to soft clay ground. In addition, a series of standard penetration tests (SPTs) were performed to assess the efficiency of each arrangement in improving the soft ground. It is noted from the in-situ test results that the interval distances between injection holes and the elapse time for ground stabilization are the crucial factors governing the applicability of the simultaneous multiple compaction-grouting method to improve the soft clay ground.

A Case Study on CGP Anchor of Open-Cuts in Soft Ground (연약지반에서 CGP-앵커의 시공사례연구)

  • 천병식;양형칠;박신영
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.621-628
    • /
    • 2002
  • Compaction Grouting Pack (CGP) Anchor which is composite anchor of bearing plus friction-type was chosen and executed for the open-cuts in soft ground. This paper presents an analysis of data from tests on composite-anchor by jacking force. The properties of composite-anchor was presented to be as follows , the maximum plastic displacement was 60 mm in abandoned coal fill deposit, the shear stress($\tau$) is expressed as $\tau$ = (equation omitted) kg/$\textrm{cm}^2$ in clayey silt.

  • PDF

Characteristics of Ground Improvement by Compaction Grouting System in Filled Ground (매립토층에서 CGS에 의한 지반개량특성에 관한 연구)

  • 천병식;여유현;정영교;정완균;정의원;김우종
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.425-432
    • /
    • 2001
  • Compaction Grouting System, the method which makes ground compact by injection of low slump mortar, Is widely used for reinforcement of soft ground, restoration of structures happened differential settlement, underpinning and restoration of damaged dam core. The quantitive analysis of ground improvement for this method has not performed yet. So, design parameters about thls method must be studied through performance of CGS in various types of soil to make CGS adaptable widely. In this study PBT, SPT and field density test were performed for analysis of the characteristics of ground improvement and pressuremeter and inclinometer were installed for analysis of the characteristics of compaction in adjacent ground. In this paper, denoted much effects for filled ground that increasing of the bearing capacity, confirming the displacement of adjacent ground and the effective radius of injection.

  • PDF

A Reinforcement Effect of Pile Foundation by Compaction Grouting System in Railroad Station Building (Compaction Grouting System에 의한 철도역사건물 파일기초보강효과)

  • Chun, Byung-Sik;Choi, Seung-Kwon;Do, Jong-Nam;Sung, Hwa-Don
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1364-1368
    • /
    • 2006
  • By the countermeasure which is caused by with railroad station ground settlement it applied a CGS in each independent foundation. The effectiveness of the ground improvement and the bearing capacity of the compaction pile has been verified by the Cone Penetration Test(CPT) and Load Test. Test result show that penetration resistance and the cone friction force increased a lot and settlement 13.475mm as the standard settlement 40.0mm appeared at below. Also uniaxial compression test result $278kg/cm^2$ as the standard $150kg/cm^2$ appeared far a lot.

  • PDF

A Study of Stability Evaluation for Tunnel at the Fault Zone Crossing (단층대를 통과하는 터널의 안정성확보에 관한 연구)

  • 박인준;최정환;김수일
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.105-112
    • /
    • 2001
  • The purpose of this study is to assess the stability of tunnel for a high speed railway crossing the fault zone. The area where the tunnel crossed the fault zone can be unstable during construction and operation. Geotechnical investigations have been conducted to determine an optimum excavation method by obtaining the material properties around the fault zone and to check the stability of the tunnel. For the numerical analysis, the FLAC, numerical analysis code based on finite difference method, was utilized to analyze the behavior of the fault at three points having typical ground conditions. Based on the results of numerical analysis, the combinations of compaction grouting and LW grouting were determined as suitable methods for pre-excavation Improvement of the ground surrounding the tunnel opening. In conclusion, the stability of the tunnel construction for the high speed railway within the fault zone may be obtained by adopting the optimum excavation method and the reinforcement method. The numerical analysis based on FLAC program contains errors caused by assumptions used in numerical analysis, therefore constant monitoring with respect to the change of ground condition and groundwater is highly recommended to minimize the numerical error and the possibility of damage to tunnel.

  • PDF