• Title/Summary/Keyword: Commercial Construction

Search Result 842, Processing Time 0.026 seconds

Time Management Status of Small Contractors and Suggestions on Education for Time Management in Colleges (소규모 건설회사의 공정관리 현황과 대학의 공정관리 교육방안)

  • Jang, Myung-Houn;Yi, Yong-Kyu
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.6 no.3
    • /
    • pp.413-422
    • /
    • 2016
  • A construction manager tries to complete a construction project within its duration and budget using available resources. Schedule networks such as Bar-chart and CPM(critical path method) are used to finish the project within the duration. A survey shows that small contractors prefer Microsoft Excel to commercial time management softwares to manage construction time in their fields, because the Excel is useful to control cost with schedule and few time management experts works in the small contractors. A college produces talented graduates who are able to manage time of a construction project. But the quality and quantity of college eduction for time management is insufficient. Another survey shows that majors in Architectural engineering of local national universities have the curriculum for time management, and teach mainly the theory of network scheduling and how to make the network schedule. The several majors have classes for the theory and exercise of commercial time management softwares in several majors. It is necessary to educate time management experts able to use Bar-chart and commercial time management softwares for the small contractors.

A Basic Study on Construction Costs Comparison between LEED and non-LEED Certified Educational Buildings (교육시설물의 LEED 인증유무에 따른 공사비 비교를 위한 기초연구)

  • Ha, SunGeun;Jang, JunHo;Kim, JiMyong;Son, Kiyoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.262-263
    • /
    • 2017
  • Currently, the environmental certification such as BREEAM and LEED has been improved for the sustainable development and related research is conducted continuously. Especially, in the respect of economy, it is reported that the construction costs of the certified buildings are more increased than non-certified buildings. However, the report has not focused on the educational building but the residential and commercial buildings. Therefore, the objective of this study is to analyze the difference of construction costs between LEED and Non-LEED educational buildings. To achieve the objective, the buildings data are collected in 21 universities then T-test is used for examining the construction costs. As a result, it shows that the construction costs of LEED buildings are increased by 3.8% comparing with non-LEED buildings.

  • PDF

A Probabilistic Fuzzy Logic Approach to Identify Productivity Factors in Indian Construction Projects

  • Princy, J. Darwin;Shanmugapriya, S.
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.39-55
    • /
    • 2017
  • Preeminent performance of construction industry are unattainable with poor productivity resulting in time and cost over runs. Enhancement in productivity cannot be achieved without identifying and analyzing factors that adversely affect productivity. The objective therefore is to propose a productivity analysis model to quantify the probability of effect of factors influencing productivity by using fuzzy logic incorporated with relative importance index method, for various types of construction projects. To achieve this objective, a questionnaire survey was carried out targeting respondents of Indian construction industry, from four distinct projects, namely, residential, commercial, infrastructure and industrial projects. Based on questionnaire administered, the relative importance and ranks of factors demonstrated using relative importance index method. Probability assessment model to analyze productivity was then developed by using Fuzzy Logic Toolbox of MATLAB. The applicability of the proposed model was tested in seven construction projects and the probability of impact of factors on productivity evaluated. The results of application of model in the construction firms infers that the most contributing factor groups for most of the projects were discerned to be manpower, motivation and time group.

THE USE OF MOBILE COMPUTERS FOR CONSTRUCTION PROJECTS

  • Chul S. Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.956-961
    • /
    • 2009
  • When construction engineers perform their work in the jobsite, they have to record as-built conditions in the project log (Data Collection). On the other hand, the engineers often have to refer to the construction documents when necessary at the job faces (Data Access). The practice of Data Collection and Data Access in the jobsite can be greatly enhanced by utilizing mobile computing with wireless communications. In this paper, two cases of mobile computing applications for construction field management are presented; Mobile Specifications System and Mobile Data Collection System. The demonstration of the process for developing two mobile applications is the primary purpose of the paper. The problems and issues involved with adopting mobile computing for construction field are also presented. The simple information framework for mobile computing has been also proposed as an outcome of the research. As for development tools, readily available relational database and wireless network have been used. The use of commercial mobile broadband was examined for data communication where local area network is not available.

  • PDF

Analysis of Construction Dispute Cases Considering Reward Ratio Focused on Arbitration Cases of Korean Commercial Arbitration Board (보상비율을 고려한 건설사업 분쟁사례 분석 - 대한상사중재원 중재판정사례를 중심으로 -)

  • Ahn, SangHyun;Choi, Heeju;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.48-56
    • /
    • 2017
  • Construction Projects have many participants by characteristic, scale and contract. Those also have complicated communication structure. So, claim and dispute occur continuously for conflicting communication. In many claim and dispute cases, it usually occurs between builder and owner. Unfair practices by owners position cause main claim and dispute. This study analyses judgment type, cause and compensation ratio in korean commercial arbitration case and provides the dispute information for builder that has weak position by contract. It draws analysis information for managing and controlling dispute that order type, judgement type, cause and failure case. Using these analysis information, it hopes to help inducement of dispute agreement and save time and economic damage for builder during construction. It also hopes to rise construction completeness by providing dispute management information.

Commercial Arbitration and Dispute Management in Construction Project (건설공사의 분쟁관리와 상사중재)

  • 이태식;이동욱;김영현
    • Journal of Arbitration Studies
    • /
    • v.13 no.2
    • /
    • pp.489-517
    • /
    • 2004
  • The resolution of the 1993 Uruguay Round and the opening of Korea's construction market in '97 marked the beginning of the globalization of Korea's domestic construction market. Consequently, the process led to changes in contracting procedures, as well as disputes in construction management. With globalization came a rapid realization of reasonable values, which forced the hierarchical vertical relationship between the owners, constructors, and subcontractors into a more equal, horizontal relationship. Once the hierarchical relationship was altered, the late 1990's witnessed a dramatic increase in managerial disagreements, in addition to escalating legal disputes and expenditures. The horizontal relationship was a new concept and brought forth many complexities. Unfortunately, because all of this was new, management of construction disputes was elementary at best. Anticipation of disputes is the key to effective dispute management. This includes thorough reviews of contract documents, document management, construction records, and checklists. Also necessary is the education of owners and contractors with pertinent knowledge concerning dispute management. The following paper focuses on the importance of observing construction disputes in order to facilitate management thereof.

  • PDF

An Investigation on the Existing Literature to Prevent Fire Spread of High-rise Buildings (고층 건축물의 화재확대방지를 위한 기존 문헌 조사)

  • Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.102-103
    • /
    • 2021
  • In Korea, starting with the Busan residential-commercial fire in 2010, the frequency of fire expansion in high-rise buildings has been continuously increasing. In the case of such large-scale fires, most of the fires generated from the inside tend to expand to the upper floors by riding the exterior material or exterior wall panels through the process of being ejected to the outside. It has been revised so that combustible exterior materials cannot be used in buildings. However, due to the legal fluoride level, the fire risk of high-rise buildings is still high, such as the case of a 33-story residential-commercial fire in Ulsan. In order to prevent such fire expansion, it is considered that it is necessary to first understand the nature of the fire occurring inside and the mechanism of the fire expansion in the upper floor. The purpose of this study is to propose improvements in domestic fire safety design through a review of existing literature to prevent fire expansion of high-rise buildings.

  • PDF

Advances in electrodeionization technology for ionic separation - A review

  • Khoiruddin, Khoiruddin;Hakim, A.N.;Wenten, I.G.
    • Membrane and Water Treatment
    • /
    • v.5 no.2
    • /
    • pp.87-108
    • /
    • 2014
  • Electrodeionization (EDI), which combines electrodialysis (ED) and conventional ion-exchange (IX), is a mature process which has been applied since more than twenty years on commercial use for the production of ultrapure water (UPW). Eliminating chemical regeneration is the main reason for its commercial success. The increase in acceptance of EDI technology has led to an installation of very large plant as the commercial state of the art that produces $1,500m^3/h$ of water for high pressure steam boiler. More recently, EDI system has found a number of new interesting applications in wastewater treatment, biotechnology industry, and other potential field. Along with further growth and wider applications, the development of stack construction and configuration are also become a concern. In this paper, the principle of EDI process is described and its recent developments, commercial scale, and various applications are pointed out.

A Study on Comparison of Commercial Arbitration System in Korea and U.S.A. (한국과 미국의 상사중재제도에 관한 비교연구)

  • 이강빈
    • Journal of Arbitration Studies
    • /
    • v.12 no.1
    • /
    • pp.271-321
    • /
    • 2002
  • Every year, many million of business transactions take place. Ocassionally, disagreements develop over these business transactions. Many of these disputes are resolved by mediation, arbitration and out-of-court settlement options. The American Arbitration Association(AAA) helps resolve a wide range of disputes through mediation, arbitration, elections and other out-of-court settlement procedures. The AAA offers a broad range of dispute resolution services to business executives, attorneys, individuals, trade associations, unions, management, consumers, families, communities, and all level of governments. The 198,491 cases composed of the 194,303 arbitration cases and the 4,188 mediation cases, were filed with the AAA in 2000. These case filings represent a full range of matters, including commercial finance, construction, labor and employment, environmental, health care, insurance, real state, securities, and technology disputes. The Korean Commercial Arbitration Board (KCAB) does more than render arbitration services. It helps facilitate settlements and guarantee implementation thereof between trading partners at home and abroad involving disputes related to such areas as the sale of commodities, construction, joint venture agreements, technical assistance, agency agreements, and maritime transport. The 643 cases composed of the the 197 arbitration cases and the 446 mediation cases, were filed with the KCAB in 2001. There are some differences between the AAA and the KCAB regarding the number and the area of mediation and arbitration case filings, the breath of service offerings, the scope of alternative dispute resolution, and the education and training. In order to apply to the proceedings of the commercial mediation and arbitration, the AAA has the Commercial Mediation Rules, the Commercial Arbitration Rules, the Expedited Procedures, the Optional Procedures for Large, Complex Commerical Dispute, and the Optional Rules for Emergency Measures of Protection as amended and effective on September 1, 2000. In order to apply to the proceedings of commercial arbitration, the KCAB has the Arbitration Rules as amended by the Supreme Court on April 27, 2000, which have been changed to incorporate the revisions of the Arbitration Act that went into effect on December 31, 1999. There are some differences between the AAA's commercial Arbitration Rules and the KCAB's Arbitration Rules regarding the clauses of jurisdiction and administrative conference, number of arbitrators, communication with arbitrator, vacancies, preliminary hearing, exchange of information, oaths, evidence by affidavit and posthearing filing of documents or others, interim measures, serving of notice, form of award, scope of award, delivery of award to parties, modification of award, release of liability, administrative fees, neutral arbitrator's compensation, and expedited procedures. In conclusion, for the vitalization of KCAB and its ADR system, the following measures should be taken : the effective case management, the development of on0-line ADR, the establishment of ADR system of electronic commerce disputes, and the variety of dispute resolution rules in each expert field.

  • PDF

Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation (4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성)

  • Song, Sung-Yol;Yang, Jeong-Sam;Myung, Tae-Sik
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).