• Title/Summary/Keyword: Commercial Construction

Search Result 841, Processing Time 0.025 seconds

DESIGN AND USE OF BUILDING INFORMATION MODELS FOR PREPLANNING COMMERCIAL BUILDING CONSTRUCTION ACTIVITIES

  • Thomas M. Korman
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.274-278
    • /
    • 2013
  • Over the past several years, the building codes that govern commercial building construction have become increasingly prescriptive in nature, specifying detailed information related to the design and installation of the systems, while offering no reasoning behind their prescriptive measures. For example, metal stud framing is commonly used in commercial building construction to create bearing walls and non-bearing partition walls. BIM provides a powerful platform for developing and implementing "pre-planning" tools and methods to facilitate both engineering and administrative controls during construction. This paper discusses the use of BIM to enhance constructability for commercial building construction activities, specifically metal stud framing. Using specific real-world examples this paper demonstrates ways that BIM can be used to foresee potential construction issues and motivates and informs future uses of BIM technologies

  • PDF

A Study on the Effective System of the Construction Arbitration (건설중재 활성화를 위한 시스템 구축방안 연구 - 미국의 건설중재운영시스템을 중심으로 -)

  • Kim Suk-Chul
    • Journal of Arbitration Studies
    • /
    • v.14 no.1
    • /
    • pp.103-132
    • /
    • 2004
  • This paper suggests the establishment of construction arbitration tribunal in The Korean Commercial Arbitration Board or the construction arbitration institution under the Ministry of Construction for effective system of Construction Arbitration. Our conclusion tells that it is desirable to establish construction arbitration institution under the Ministry of Construction upon the result of analyzing some factors such as participation of construction workers, sophistication of construction field. In contrast, it is more desirable to establish the construction arbitration tribunal in The Korean Commercial Arbitration Board when we consider the feasibility, sophistication of ADR, organization, rules, arbitrator availability, internationalization Therefore, our final suggestion is to establish construction arbitration tribunal in The Korean Commercial Arbitration Board for effective system of Construction Arbitration. More detailed are as follows: . Establishment of the committee for resolution of construction disputes consisting of experts and specialists from construction-related institution, union, law firm and universities. 1 The committee manages finance, rules on construction arbitration and arbitrator members. 1 Establishment of intermediation team, construction arbitration team, housing arbitration team, real estate arbitration team under the construction arbitration tribunal . Establishment of a committee of arrangements consisting of experts and specialists from The Korean Association of Arbitration Studies, Korea Arbitrators Association, The Korean Commercial Arbitration Board, The Construction Association of Korea in order to accomplish effective system for construction arbitration.

  • PDF

Critical Limits of Commercial Diving on the Construction of Tidal Current Power in Jangjuk Channel (장죽수로 조류발전건설시 작업특성에 따른 산업잠수 작업한계)

  • Kim, Won-Seok
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.25 no.3
    • /
    • pp.733-742
    • /
    • 2013
  • The Korea has significant tidal current energy resources, but it is so hard to work underwater for tidal turbine installation. Therefore commercial diving work is very important for tidal current generator. Also, Jangjuk channel is vary famous as proper area to generate tidal current energy. Nevertheless, no one is studied about characteristics of commercial diving works with installation of tidal current generator. The purpose of this study is to introduce commercial diving with work types and investigate critical limits of diving working under the conditions, which are working only to minutes at slack tide during the neap tide. As the results, work types are five as like mooring installation, OMAS(Offshore Maintenance Access System), support structure installation, cable and turbine installation. Here, the original construction period is expected about 4 months, but the construction take 18 months to complete. The cause of extends construction period is insufficiency of researching tidal current conditions at the site and ignorance of slack tide which need to secure diving working time. Total diving working times are 110th during 18 months, the highest percentage of diving times is turbine installation about 43.6 %, and cable, mooring installation and support structure construction are 27.3 %, 15.5 %, 13.6 %, respectively. On the basis of this study, estimation of times of commercial diving is possible with work types of tidal current power, and has a significance as basic data to determining construction period.

The Application of Actual Database for building construction - Focusing on Commercial building - (건축공사 공사실적자료 데이터베이스 활용방안 - 상업시설물을 중심으로 -)

  • Lee Sung-Ho;Kim Tae-Hui;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.428-433
    • /
    • 2001
  • Commercial buildings are the mostly common ones to be constructed along with residential buildings. After economic inflation, So-called 'IMF era', construction market has been running low because of stagnancy of business activities and cost escalation, Thus the construction industry needs a study of higher productivity by means of using information infrastructure. To deliver a database of commercial buildings construction record, their major management has carried out analysis for database components, in an attempt to meet users' needs. The scheme study of application presented cost and resource in construction lifecycle.

  • PDF

The Change of Relationship between Spatial Configuration and Pedestrian Movement during Inhabited Remodeling - Focused on Coex Shipping Mall - (재실 리모델링 공사 기간 중 공간구조와 쇼핑객 통행량의 상관성 변화 연구 - 코엑스 쇼핑몰을 대상으로 -)

  • Kim, Min-Soo;Kim, Young-Ook
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.9
    • /
    • pp.11-18
    • /
    • 2019
  • Commercial facilities are put under construction for inhabited remodeling due to management or cost issues. Temporary facility planning is important in inhabited remodeling because building construction and management are simultaneously performed in this type of remodeling. The purpose of this research is to identify how the temporary spatial structure changes for each inhabited remodeling construction level of commercial facilities and existence of tenants affect the spatial usability. It also examines a relationship between the traffic flow and spatial configurations during the inhabited remodeling process where the tenants are temporarily removed and only the spatial configuration are maintained and verifies if the established theory that the spatial configurations in commercial facilities significantly affect the traffic is also valid during the inhabited remodeling process. The research result was found that the amount of traffic during the inhabited remodeling construction process is more affected by the factors such as tenants rather than spatial configurations. It is anticipated that the result of this research will serve as a guideline to establish logical inhabited remodeling plans for each level of constructing temporary facilities. Furthermore, it can be used to minimize the sales damage caused by the construction or as a guideline to determine the order of tenants to be moved into the new commercial facilities.

A Study on the Actual Construction Database Modeling and Application for Commercial Buildings (상업건축물의 공사칠적 데이터베이스(DB) 모델구축 밑 응용방안)

  • Kim Sun-Kuk;Lee Sung-Ho;Kim Tae-Hui;Joo Jin-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.83-90
    • /
    • 2002
  • Actual construction data are unsystematically handled and uselessly hoarded after completion of the project although actual construction data can be applied to the various works of the future projects. Many researches have been carried out by several engineers and scholars of construction firms and research institutes, but the level of the application is not plausible yet. The objective of this paper is to propose a web-based data model and application system for commercial buildings in order to enhance the usability of the actual construction data on line. The principal factors of commercial building project data and the user$^{\circ}{\phi}s$ requirements in various areas, such as planning, design, procurement and construction and so on are analyzed to implement the database structure of the proposed system. The application of resource Information focused on cost, manpower, equipment is included in the system, which is expected to enhances the usability of actual database application system compared with other researches proposed so far.

Analysis of Dispute Cases According to the Construction Project Phases -Focused on Cases of the Supreme Court and Korean Commercial Arbitration Board- (건설프로젝트 단계별 분쟁사례 분석에 관한 연구 - 대법원 및 대한 상사 중재원 사례를 중심으로 -)

  • Lee, Yi-Do;Park, Jeong-Ro;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.185-189
    • /
    • 2010
  • As recent construction project has specialization and high-level of the engineering, Although, It has always uncertainty of agreement and contract enforcement, factors of difficult to predict etc. in each phase. In this process, Various interest groups involved are continuously generated dispute of interest each others. So this paper analyzed the dispute cases in construction projects from the Supreme Court and Korean Commercial Arbitration Board in Korea, and then identified the dispute types and causes that occur during all of the construction project phases with their influence analysis. At the result, It will be contributed to the basic data for pre-dispute prevention in the construction projects.

  • PDF

Development of a Novel Air-Conditioning Method for Energy Savings in Commercial Building Under Time of Use Electricity Pricing (계시별 전기 요금제하의 에너지 절약을 위한 건물 냉방 제어 방법의 개발)

  • Noh, Sung-Jun;Jeon, Jeong-Pyo;Kim, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.2
    • /
    • pp.164-170
    • /
    • 2013
  • The commercial buildings are consuming about 30% of total energy used in Korea. And a large amount of energy consumption in commercial buildings is consumed by HVAC(Heating, Ventilation, Air Conditioning) system. Therefore, if we can reduce the energy consumption in HVAC or air-conditioning system in commercial buildings, the overall energy consumption in Korea can be reduced. Currently, an electricity charge called Time of Use (TOU) is applied to typical commercial buildings. This paper proposes the novel energy management method where the temperature setting of air-conditioning system are adjusted to minimize the use of electrical energy while indoor comfort level is retained. The simulation test for a typical commercial building shows that the proposed method gives over 10% savings in electricity bills and electricity consumption compared to the conventional air-conditioning method.

A Study on the Maintenance System Improvement for Commercial Residential Buildings (주상복합건물의 유지관리 제도 개선방안)

  • Kim Seung-Jin;Baeck Kwang-Sub;Yeo Jong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.191-196
    • /
    • 2005
  • Unpreparedness of the maintenance regulations is regarded as the main reason for the short life span of the multi-owned commercial residential buildings. This study suggests that the followings should be prepared for the effective maintenance and life prolongation of the multi-owned commercial residential buildings : 1) Standard maintenance regulations for those buildings should be set up, 2) Building maintenance works should be performed by the specialists, like licensed building manager, mechanical and electrical engineers, etc., 3) Long-range repair expenses should be laid by on the monthly base according to the long-range repair plan, 4) Regulations concerning the defect repair should be provided properly.

  • PDF

Research on the Effect of High-Rise Commercial Building Construction on Land Value of Shanghai in the 1920s

  • Sun, Le
    • International Journal of High-Rise Buildings
    • /
    • v.5 no.2
    • /
    • pp.145-154
    • /
    • 2016
  • When the tall office building first appeared in the street of Chicago in the end of Nineteenth Century, this building type has become a commodity in the development of real estate and been defined as a machine that makes the land pay. With the investigation of land price samples of the high-rise commercial buildings and the overall land price development in the central district of International Settlement in Shanghai, this paper tries to examine the site selection and construction of high-rise commercial buildings have important positive effect on the land value development.