• 제목/요약/키워드: Collaborative risk management

검색결과 28건 처리시간 0.026초

Development of a Daily Epidemiological Model of Rice Blast Tailored for Seasonal Disease Early Warning in South Korea

  • Kim, Kwang-Hyung;Jung, Imgook
    • The Plant Pathology Journal
    • /
    • 제36권5호
    • /
    • pp.406-417
    • /
    • 2020
  • Early warning services for crop diseases are valuable when they provide timely forecasts that farmers can utilize to inform their disease management decisions. In South Korea, collaborative disease controls that utilize unmanned aerial vehicles are commonly performed for most rice paddies. However, such controls could benefit from seasonal disease early warnings with a lead time of a few months. As a first step to establish a seasonal disease early warning service using seasonal climate forecasts, we developed the EPIRICE Daily Risk Model for rice blast by extracting and modifying the core infection algorithms of the EPIRICE model. The daily risk scores generated by the EPIRICE Daily Risk Model were successfully converted into a realistic and measurable disease value through statistical analyses with 13 rice blast incidence datasets, and subsequently validated using the data from another rice blast experiment conducted in Icheon, South Korea, from 1974 to 2000. The sensitivity of the model to air temperature, relative humidity, and precipitation input variables was examined, and the relative humidity resulted in the most sensitive response from the model. Overall, our results indicate that the EPIRICE Daily Risk Model can be used to produce potential disease risk predictions for the seasonal disease early warning service.

COMPENSATION STRUCTURE AND CONTINGENCY ALLOCATION IN INTEGRATED PROJECT DELIVERY SYSTEMS

  • Mei Liu;F. H. (Bud) Griffis;Andrew Bates
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.338-343
    • /
    • 2013
  • Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.

  • PDF

Necessity for a National Carcinogen List in Korea, Based on International Harmonization

  • Leem, Jong Han;Kim, Hwan Cheol;Park, Myungsook;Kim, Jung Ae;Kim, Shin-Bum;Ha, Mina;Lim, Min-Kyeong;Kim, Jeongseon;Park, Eun Young;Paek, Domyung
    • Environmental Analysis Health and Toxicology
    • /
    • 제28권
    • /
    • pp.8.1-8.5
    • /
    • 2013
  • Cancer has been the leading cause of death in Korea for the last 30 years. Cancer patients' 5-year survival rate between 2005 and 2009 was 62.0%, representing a highly advanced standard of care, as much as developed countries in the EU and the US. The Korean government formulated its first 10-year plan for cancer control in 1996 and has been carrying out a second 10-year plan for cancer control since 2006. But despite the Korean government's efforts, the cancer burden in Korea continues to increase. Many separate laws have gone into effect concerning the management of carcinogen exposure. However, there are no integrated regulatory laws or management systems against carcinogen exposure in Korea. Dead zones remain where carcinogen exposure cannot be controlled properly in Korea. In this paper, we suggest the need to establish a national carcinogen list based on international harmonization as a prerequisite for a paradigm shift in cancer control policy from treatment to primary prevention.

Perioperative management of facial reconstruction surgery in patients with end-stage renal disease undergoing dialysis

  • Chan Woo Jung;Yong Chan Bae
    • 대한두개안면성형외과학회지
    • /
    • 제25권2호
    • /
    • pp.71-76
    • /
    • 2024
  • Background: The rising incidence of dialysis-dependent end-stage renal disease (ESRD) has underscored the need for collaboration between plastic surgeons and nephrologists, particularly concerning preoperative and postoperative management for facial reconstruction. This collaboration is essential due to a scarcity of comprehensive information in this domain. Methods: A study initiated in January 2015 involved 10 ESRD cases on dialysis undergoing Mohs micrographic surgery for facial skin cancer, followed by reconstructive surgery under general anesthesia. To ensure surgical safety, rigorous measures were enacted, encompassing laboratory testing, nephrology consultations, and preoperative dialysis admission. Throughout surgery, meticulous control was exercised over vital signs, electrolytes, bleeding risk, and pain management (excluding nonsteroidal anti-inflammatory drugs). Postoperative assessments included monitoring flap integrity, hematoma formation, infection, and cardiovascular risk through plasma creatinine levels. Results: Adherence to the proposed guidelines yielded a notable absence of postoperative wound complications. Postoperative plasma creatinine levels exhibited an average decrease of 1.10 mg/dL compared to preoperative levels, indicating improved renal function. Importantly, no cardiopulmonary complications or 30-day mortality were observed. In ESRD patients, creatinine levels decreased significantly postoperatively compared to the preoperative levels (p< 0.05), indicating favorable outcomes. Conclusion: The consistent application of guidelines for admission, anesthesia, and surgery yielded robust and stable outcomes across all patients. In particular, the findings support the importance of adjusting dialysis schedules. Despite the limited sample size in this study, these findings underscore the effectiveness of a collaborative and meticulous approach for plastic surgeons performing surgery on dialysis-dependent patients, ensuring successful outcomes.

PACRIM SCIENCE APPLICATIONS: A DECADE WITH AIRSAR

  • Milne, A.K.;Tapley, I.J.
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2002년도 Proceedings of International Symposium on Remote Sensing
    • /
    • pp.428-428
    • /
    • 2002
  • The scientific objectives of PACRIM (Pacific Rim) are to advance the understanding of polarimetric and interferometric radar and to promote its application in environmental research designed to detect and quantify changes found in both the physical and humanly dominated ecosystems on the earth's surface. The information derived is used to more readily identify environments at risk; improve environmental decision making and the management of resources and thereby lead to the implementation of more effective and sustainable land use practices. PACRIM is a collaborative research project was organized by NASA's Mission to Planet Earth, Airborne Sciences Program; the Jet Propulsion Laboratory; CSIRO-COSSA and the Centre for Remote Sensing and GIS at the University of New South Wales. A decade of working with AIRSAR data (1993-2003) in the Australia-Asian-Pacific region has provided the opportunity for more than 400 investigators from 20 countries to collect, analyse, interpret and apply state-of-the-art radar data to earth-science studies. This has been achieved by scientists working within seven broad research themes; o Forestry and vegetation o Geology and tectonic processes o Interferometry o Disaster management o Coastal analysis o Agriculture o Urban and regional development. This paper presents an overview of the three data acquisition missions (1993,1996 and 2000) and the science research outcomes achieved from analyzing high quality radar data.

  • PDF

A Comparative Analysis of Integrated Project Delivery in Construction Versus Traditional Methods

  • Peressini, Anthony;Bristow, James;Motahari, Mahmoud;Karakouzian, Moses
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.669-677
    • /
    • 2022
  • In this paper, different types of traditional project delivery methods in the construction industry were explored and a comparative analysis against Integrated Project Delivery (IPD) were performed. The advantages of IPD method for all parties, owner/engineer/architect/general contractor, were explored by reviewing the most recent literature. The literature suggests that IPD method should be the dominating project delivery method and diluting the conventional methods such as Design-Bid-Build due to more collaborative and mutually beneficial ways of doing construction; IPD is newer and a more comprehensive method to capture the intrinsic values of project collaboration. This paper presents a comparison of the commonly used methods of project delivery, Design-bid-build, CMAR, & Design-Build and addresses their advantages and disadvantages in differing project scopes and sizes. Several industry leaders with experience in the four types of project delivery addressed were surveyed. The survey results show an overwhelming desire for future projects to go toward IPD from the contractor/owner/RDP. The biggest obstacle facing a project from using IPD appears to be trust.

  • PDF

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • 제10권1호
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

건강보험심사평가원 환자표본 데이터 분석을 통한 한의 의료 이용 요추 수술 환자의 탐색적 성과 분석 (An Exploratory Health Outcome Analysis of Lumbar Surgery Patients Utilizing Korean Medical Services: Using Health Insurance Review and Assessment Service-National Patients Sample (HIRA-NPS 2019) Data)

  • 이혜윤;김남권;송윤경
    • 척추신경추나의학회지
    • /
    • 제17권2호
    • /
    • pp.131-139
    • /
    • 2022
  • Objectives This study aimed to analyze the medical utilization of low back pain (LBP) patients after back surgery and estimate the medical costs of Korean and Western medicine collaborative treatment, odds ratio, and hazard ratio between the two groups using the 2019 Health Insurance Review and Assessment Service-National Patient Sample (HIRA-NPS-2019). Methods Data management and descriptive analysis, logistic regression, and survival analysis were conducted for defining and estimating the LBP patients after back surgery in the NPS 2019 dataset. Results A total of 216,424 patients out of 991,189 were identified as having LBP. Among the patients with LBP, 1,734 were treated with surgery while 214,690 were not. Among those who had surgery, 937 were treated with conventional treatments only and 797 underwent Korean medicine treatments. The odds ratio of the logistic regression analysis was 0.7129, suggesting that Korean medical treatment experience group had a 28.7% lower risk of reoperation than the Western medical treatments only group. The hazard ratio of the survival analysis was 0.9145; thus, the risk probability of reoperation was estimated to be approximately 8.55% lower. The 50% risk of reoperation was 69 days (0.5044) for the conventional group, and 97 days (0.5008) for the Korean medical group in the survival analysis using the Kaplan-Meier graph. Conclusions These results could be utilized in future studies in conducting economic evaluation for estimating cost-effectiveness of Western medicine and Korean medicine treatment compared to Western medicine alone in LBP patients after back surgery in a South Korean perspective. mended and should be applied while taking the necessary precautions.

네트워크 특성의 관점에서 IT 관련 저널 분석 (The Analyses of IT Related Journal on the View of Network Characteristics)

  • 김기환;김인재
    • 경영정보학연구
    • /
    • 제17권2호
    • /
    • pp.179-192
    • /
    • 2015
  • 학술 분야의 연구자들의 협업을 기반으로 한 공동연구가 활발히 진행되고 있다. 이에 따라 공동연구 및 연구자 간 학문적 관계에 대한 관심 또한 증대되고 있다. 공동연구를 통해 연구자들은 연구 생산성 증대, 비용 및 시간의 효율적 사용, 그리고 연구의 위험요소를 감소시켜 연구 성과와 생산성을 극대화하고 있다. 본 연구는 ISR에 2006년부터 2012년까지 투고된 논문의 저자 및 심사자 데이터를 기반으로 연구 생산성 및 심사 효율성 분석을 실시하였다. 투고된 논문 230편을 대상으로 소셜 네트워크 분석 기법인 중심성 분석과 하위그룹 분석을 실시하였고, 상관분석과 회귀분석을 통해 연구의 타당성을 검토하였다. 연구의 결과는 공저자 집단의 연구 생산성이 향상되는 것을 확인하였으며, ISR의 논문 심사자의 효율성도 소셜 네트워크 분석 지표들을 통해 검증할 수 있었다.

센서 및 카메라 비전을 활용한 OPC UA 기반 협동로봇 가드 시스템의 설계 및 구현 (Design and Implementation of OPC UA-based Collaborative Robot Guard System Using Sensor and Camera Vision)

  • 김지형;정종필
    • 한국인터넷방송통신학회논문지
    • /
    • 제19권6호
    • /
    • pp.47-55
    • /
    • 2019
  • 제조 패러다임 변화에 따라 다양한 협동로봇이 신규시장을 창출하고 있다. 협동로봇은 기존 산업용 로봇 대비 쉬운 운용, 생산성 향상, 단순 작업을 하는 인력을 대체하는 목적으로 모든 산업에서 협동로봇의 수요가 증가하고 있다. 그러나 산업현장에서 협동로봇으로 인한 작업 중 사고가 빈번하게 발생하고 있으며, 작업자의 안전을 위협하고 있다. 인간 중심의 환경에서 로봇을 통한 산업현장이 구성되려면 작업자의 안전을 보장해야 하며 출동 가능성을 업애고 신뢰할 수 있는 통신을 하는 협동로봇 가드 시스템의 개발의 필요성이 있다. 센서 및 컴퓨터 비전을 통해 협동로봇의 작업 반경 내에서 발생하는 사고를 이중으로 방지하고 안전사고 위험을 감소시켜야 한다. 다양한 산업용 장비와 통신을 위한 국제 프로토콜인 OPC UA를 기반으로 시스템을 구축하고 초음파 센서와 CNN(Convolution Neural Network)적용한 영상 분석을 통한 협동로봇 가드 시스템을 제안한다. 제안 된 시스템은 작업자의 불안전한 상황에서 로봇 제어의 가능성을 평가한다.