• Title/Summary/Keyword: CoSpace

Search Result 2,096, Processing Time 0.036 seconds

Improvement Method of Sand Ground Using an Environmental Friendly Bio-grouting Material (친환경 바이오그라우팅을 이용한 모래지반 개량 공법)

  • Kim, Dae-Hyeon;Sagong, Myung;Park, Kyung-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.6
    • /
    • pp.473-481
    • /
    • 2013
  • The purpose of this research is to evaluate the improvements in the strength and injection range of loose ground after injecting $CaCO_3$(created by microorganism reaction). For this purpose, three cases of single-layer (Sand, SP, SW) specimens were made in a 150mm D ${\times}$ 200mm H space and two cases of multi-layer specimens (SW/SP, SP/SW) were made in a 150mm D ${\times}$ 300mm H space. The specimens were made with a relative density of 30% of soft ground and an injection was given over a time of one day. The uniaxial compression strength was measured with a cone penetrometer and the injection range was observed by checking the bulb formation around the injection nozzle. Also, the compositions of the specimens were assessed through XRD analyses. Based on the test results, a compressive strength of 500kPa and 15cm thick cementation were noted due to the cementation of the soil. This implies that there are significant effects of the pore condition and size on bio-grouting technology.

Propagation characteristics of blast-induced vibration to fractured zone (파쇄영역에 따른 발파진동 전파특성)

  • Ahn, Jae-Kwang;Park, Duhee;Park, Ki-Chun;Yoon, Ji Nam
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.959-972
    • /
    • 2017
  • In evaluation of blast-induced vibration, peak particle velocity (PPV) is generally calculated by using attenuation relation curve. Calculated velocity is compared with the value in legal requirements or the standards to determine the stability. Attenuation relation curve varies depending on frequency of test blasting, geological structure of the site and blasting condition, so it is difficult to predict accurately using such an equation. Since PPV is response value from the ground, direct evaluation of the structure is impractical. Because of such a limit, engineers tend to use the commercial numerical analysis program in evaluating the stability of the structure more accurately. However, when simulate the explosion process using existing numerical analysis program, it's never easy to accurately simulate the complex conditions (fracture, crushing, cracks and plastic deformation) around blasting hole. For simulating such a process, the range for modelling will be limited due to the maximum node count and it requires extended calculation time as well. Thus, this study is intended to simulate the elastic energy after fractured zone only, instead of simulating the complex conditions of the rock that results from the blast, and the analysis of response characteristics of the velocity depending on shape and size of the fractured zone was conducted. As a result, difference in velocity and attenuation character were calculated depending on fractured zone around the blast source appeared. Propagation of vibration tended to spread spherically as it is distanced farther from the blast source.

Design considerations and field applications on inflatable structure system to protect rapidly flooding damages in tunnel (해저터널 급속차폐를 위한 팽창구조체의 설계 및 현장적용에 대한 연구)

  • Kim, Hyeob;Kang, Si-On;Yoo, Kwang-San;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.161-177
    • /
    • 2017
  • This paper presents the design considerations and field applications on inflatable structure system to protect rapidly flooding damages in large section tunnel. This inflatable structure system is very valuably used to protect passively and rapidly the possibilities of tunnel damages by flooding threats and unusual leakage to be occurred during and after underground infrastructure. In particular, this system should be necessary in subsea tunnel. The predominant factors in the design of inflatable structure system are the leakage and friction characteristics between the inflater and tunnel liner. The analytical and experimental studies are performed to develop the design considerations and to examine the design parameters of the inflatable structure system. The analytical solutions are developed using membrane theory to suggest the design considerations. The relative friction tests of several fabric materials are also carried out to determine the friction characteristics according to the different friction conditions between inflater and tunnel surface. The test results show that the friction coefficients in wet surface condition are about 20% lower than the values in dry surface condition. In addition, virtual design of tunnel protection system for two virtual subsea tunnel sites which is under reviewing in Korea, is carried out based on this research. It is expected that the results of this research will be very useful to understand the inflater structure design and development the technology of tunnel protection structures in the future.

An Experimental Study on the Flexural Behavior of Slab Repaired and Reinforced with Strand and Polymer Mortar (강연선과 폴리머 모르타르에 의해 보수보강된 슬래브의 휨거동에 대한 실험적 고찰)

  • Yang Dong-Suk;Hwang Jeong-Ho;Park Sun-Kyu
    • Journal of the Korea Concrete Institute
    • /
    • v.17 no.2 s.86
    • /
    • pp.171-177
    • /
    • 2005
  • Even though the cost associated with the repair and rehabilitation of existing structures are rapidly increasing, vast number of the repaired and rehabilitated structures do not function properly as expected during their remaining service lives. This paper focused on the flexural behavior of reinforced concrete slabs repaired and reinforced by PS strand and polymer mortar in the tension face. The slabs have the size of 700${\times}120{\times}$2200 m and 700${\times}120{\times}$1300 mm. Variables of experiment were space of strengthening, chipping, the number of strand, the kind of mortar in this experimental study. Attention is concentrated upon overall bending capacity, deflection, ductility and failure mode of repaired and reinforced slabs. Test results show that deflection of repaired and reinforced slabs reduced to approximately $40 \%$ comparison to standard slabs. Boundary cracking of chipping slab started ultimate load afterward. Concrete-mortar interface cracked 64.5 kN in repaired slab with AP mortar and 36.0 kN in repaired slab with general polymer mortar. Reinforcement effect increased with reducing space of strand. Also, Reinforcement effects are more by strand than by polymer mortar.

Morphological and Physiological Characteristics of Acclimated Liriodendron tulipifera Tree Produced by Several Types of In Vitro Germination Culture (백합나무 체세포배 기내발아 방식에 따른 순화묘의 형태적 및 생리적 특성)

  • An, Chan Hoon;Yi, Jae Seon;Moon, Heung Kyu;Kim, Yong Wook
    • Journal of Korean Society of Forest Science
    • /
    • v.101 no.1
    • /
    • pp.158-162
    • /
    • 2012
  • The acclimatization of in vitro propagated plants is an important step to produce vigorous plants for clonal forestry and in vitro micro-environment may affect the growth in ex vitro condition. To monitor in vitro environmental effects on the growth in ex vitro condition, several culture systems such semi-solid medium(SS), temporary immersion bioreactor(TIB) and continuous immersion bioreactor(CIB) culture types were tested to compare for the growth of acclimated plants of Liriodendron tulipifera. Results suggested that morphological characters, stomatal conductance, evapotranspiration and chlorophyll contents of acclimated plants were affected by the different of in vitro culture conditions. CIB type of culture was resulted to the lowest value in the biomass of acclimated plants. Net photosynthsis rate of CIB was the same level as those of SS and TIB. However, stomatal conductance, evapotranspiration and $CO_2$ partial pressure in the intercellular air space were lower than those of SS and TIB. The amounts of chlorophyll a, b and carotenoids were also lower than those of the other two culture systems. TIB, showing a little lower or higher value than SS in many growth character, is recommended rather than CIB to produce healthy yellow poplar plants in ex situ condition.

Design Optimization of Differential FPCB Transmission Line for Flat Panel Display Applications (평판디스플레이 응용을 위한 차동 FPCB 전송선 설계 최적화)

  • Ryu, Jee-Youl;Noh, Seok-Ho;Lee, Hyung-Joo
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.12 no.5
    • /
    • pp.879-886
    • /
    • 2008
  • This paper addresses the analysis and the design optimization of differential interconnects for Low-Voltage Differential Signaling (LVDS) applications. Thanks to the differential transmission and the low voltage swing, LVDS offers high data rates and improved noise immunity with significantly reduced power consumption in data communications, high-resolution display, and flat panel display. We present an improved model and new equations to reduce impedance mismatch and signal degradation in cascaded interconnects using optimization of interconnect design parameters such as trace width, trace height and trace space in differential flexible printed circuit board (FPCB) transmission lines. We have carried out frequency-domain full-wave electromagnetic simulations, time-domain transient simulations, and S-parameter simulations to evaluate the high-frequency characteristics of the differential FPCB interconnects. The 10% change in trace width produced change of approximately 6% and 5.6% in differential impedance for trace thickness of $17.5{\mu}m$ and $35{\mu}m$, respectively. The change in the trace space showed a little change. We believe that the proposed approach is very helpful to optimize high-speed differential FPCB interconnects for LVDS applications.

A Comparative Study on the Homeschooling Curriculum in the United States and South Korea (미국과 한국의 홈스쿨링 교육과정 비교연구)

  • Youk, Kwon-In;Paik, Il-Woo
    • Korean Journal of Comparative Education
    • /
    • v.28 no.1
    • /
    • pp.51-87
    • /
    • 2018
  • The purpose of this study is to seek a measure to institutionalize the curriculum of Korean homeschooling by comparing and analyzing curriculums of homeschooling between the United States and South Korea. To do so, literature review was conducted to derive analysis criterion and curriculums of homeschooling between the United States and South Korea were compared and analyzed. The major findings of analyses are as follows. First, from the perspective of educational goal, homeschooling families of both countries are similar in which they preferentially seek private goal but also consider social goal as well. Second, in the perspective of educational content, a diversity in course of study, textbook and other education materials of homeschooling in the United States is substantially attained when Korean homeschooling families suffer shortage. Third, in terms of educational implementation, homeschooling of both countries attained an autonomy in instructional time and a diversity in instructional space and method, however, unlike homeschooling in the United States, homeschooling in South Korea is experiencing difficulties due to lack of homschooling organization, homeschooling co-ops and web-site space. Fourth, in the perspective of educational evaluation, homeschooling in South Korea, unlike its comparison target, has not been certified as a formal education as well as not been accepted from universities. Based on these analysis results, conclusion and discussion have been proposed.

Pillar stability in very near-twin tunnels (초근접 병설터널의 필라 안정성 확보)

  • Kim, Donggyou;Koh, Sungyil;Lee, Jeongyong;Lee, Chulhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.699-714
    • /
    • 2022
  • The objective of this study is to suggest a safe and economical pillar reinforcement method when very near-twin tunnels with a minimum interval of 1 m passes through a soft zone such as weathered soil or weathered rock. A standard cross-sectional view of a two-lane road tunnel was applied to suggest a pillar reinforcement method for the very near-twin tunnels. The thickness of the pillar was 1 m. The ground condition around the tunnel was weathered soil or weathered rock. There were four reinforcement methods for pillar stability evaluation. These were rock bolt reinforcement, pre-stressed steel strand reinforcement, horizontal steel pipe grouting reinforcement, horizontal steel pipe grouting + prestressed steel strand reinforcement. When the ground condition was weathered soil, only the pillar reinforced the horizontal steel pipe grouting + prestressed steel strand did not failed. When the ground condition was weathered rock, there were no failure of the pillar reinforced the horizontal steel pipe grouting or the horizontal steel pipe grouting + prestressed steel strand. It is considered that the horizontal steel pipe grouting reinforcement played a role in increasing the stability of the upper part of the pillar by supporting the upper load applied to the upper part of the pillar.

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.

Development of rapidly hardening seal material applicable to steel pipe multistage grouting (강관다단 그라우팅에 적용하는 속경성 실링재 개발)

  • Shin, Hyunkang;Jung, Hyuksang;Kim, Donghyun;Ryu, Yongsun;Kim, Donghoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.2
    • /
    • pp.301-321
    • /
    • 2019
  • The development of a rapidly hardening seal material applicable to steel pipe multistage grouting is described in this paper. In the multistage technique, seal materials are inserted to prevent the backflow of main grouting material. The grouting material must be inserted only after sufficient time has passed for the seal material to reach a gel state. Otherwise, the fluid seal material mixes with the main grouting material and a backflow of the grouting material occurs, thereby making its in situ insertion difficult. Furthermore, if the seal material remains in the gel state for too long a time, it solidifies; and the main grouting material will not be able to seep into the soil. The gel time, i.e., the time needed for the fluid seal material to turn into a gel state, determines the construction period of steel pipe multistage grouting. The gel time is one of the important factors in this technique, because it impacts the total tunnel construction period significantly. This study develops a rapidly hardening calcium aluminate material, which can reduce the gel time and shorten the construction period while retaining proper sealing function. It also presents a method to determine whether the seal material has reached the gel state as well as the quality standard and bleeding rate testing method for the seal material in the gel state.