• 제목/요약/키워드: Civil Project

검색결과 1,634건 처리시간 0.022초

COMPENSATION STRUCTURE AND CONTINGENCY ALLOCATION IN INTEGRATED PROJECT DELIVERY SYSTEMS

  • Mei Liu;F. H. (Bud) Griffis;Andrew Bates
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.338-343
    • /
    • 2013
  • Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.

  • PDF

A Fuzzy AHP Model for Selection of Consultant Contractor in Bidding Phase in Vietnam

  • Ha, Tran Thanh;Hoai, Long Le;Lee, Young Dai
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권2호
    • /
    • pp.35-43
    • /
    • 2015
  • Project Management Consultant (PMC) plays a vital role in the overall performance of any project. Selecting right PMC for right project is the most crucial challenge for any construction owner. Thus, PMC selection is one of the main decisions made by owners at the early phase of construction project. It is not easy for the project owner to select a competent PMC due to the fuzziness, imprecision, vagueness, incomplete and qualitative criteria of the decision. This paper presents a model for selecting PMC contractor using the Fuzzy Analytical Hierarchy Process (FAHP). And a fuzzy number based framework is proposed to be a viable method for PMC contractor selection. A case study to illustrate the application of the model is also presented in this paper.

Measuring the Impact of Change Orders on Project Performances by Building Type

  • Juarez, Marcus;Kim, Joseph J.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.179-187
    • /
    • 2022
  • The project performances can be measured in terms of meeting the project schedule, budget, and conformance to functional and technical specifications. Numerous studies have been conducted to examine the causes and effects of change orders for both vertical and horizontal construction, respectively. However, these studies mainly focus on a single project type, so this paper examines the impact of change order for cost growth and schedule overruns using four different building types to close the gap in the change order research area. A total of 211 building projects are collected from four building types: healthcare, residential, office, and education. Statistical analyses using ANOVA tests and linear regression models are used to examine the created metric $CO/day on the cost and schedule impacts. The results found that mean $CO/day values were not statistically different among building types, and that the sum of change orders is a statistically significant predictor of $CO/day. The results will help project stakeholders mitigate the negative change orders effects can be a challenge for project managers and researchers alike.

  • PDF

Project Cost Management in Construction Industry in Ho Chi Minh City

  • Kim, Soo-Yong;Tuan, Kiet Nguyen;Luu, Van Truong;Le, Tam Thuong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.70-71
    • /
    • 2015
  • Cost management always being the matters for project manager as well as other entities involved the construction projects. Vietnam is emerging country, many construction works were carried out and lot of construction projects will be developed in the near future with a huge investment capital come from outside and inside Vietnam. In recent years, international project management firms enter the Vietnam construction market, some issues emerged need to be solved. In which cost and schedule of the construction project was put in a thoroughly consider of not only project management team but also stakeholders. The research attempts to identify and assess the relationship of factors affecting the construction cost in construction phase in Ho Chi Minh City, Vietnam. Five main factor groups Owners/clients; Consultants; Contractors; Resource and Other were identified to propose the solution for cost management.

  • PDF

PROJECT COMPLEXITY AS A MODERATOR OF PERFORMANCE BIAS TOWARDS OVERRUN

  • Li liu;Andrew Nguyen;James Arvanitakis
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.38-45
    • /
    • 2011
  • Studies have shown that infrastructure projects have continued to experience significant delays and cost overrun over an extended period of time and no evidence of learning ever have happened [1] [2]. Various causes contribute to the bias towards overrun [3]. This study contributes to literature by developing and subsequently validating a set of hypothesized relationships between project complexity and project performance. The results show that project complexity is associated with both the magnitude and variance of overrun. Further, the extent and magnitude of the positive bias towards overrun are moderated by project complexity.

  • PDF

그린리모델링 실증 시범사업을 통한 프로세스의 전 과정에 대한 검토 (Verification of the Entire Process Model through Green Remodeling Pilot Project)

  • 정진우;주정훈;이건호
    • 한국태양에너지학회 논문집
    • /
    • 제38권3호
    • /
    • pp.37-45
    • /
    • 2018
  • The purpose of this study is to review all phases of the pilot project through the implementation of the Green Remodeling process. The Green Remodeling process was developed to facilitate anyone's ease of use. The Green Remodeling process consists of five phases : project, plan, design, construction, operation and maintenance. Each stage simulation was performed and the energy saving was predicted. Architects can easily obtain energy information of a building. In this study, we propose a green remodeling proposal plan through pilot project. Ultimately, the spread of green remodeling will greatly contribute to achieving the goal of reducing greenhouse gas emissions.

A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • 제71권2호
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.

Review of Construction Business Intelligence Research

  • Baek, Seungwon;Han, Seung Heon;Yun, Sungmin;Jung, Wooyong
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.371-380
    • /
    • 2020
  • With the 4th industrial revolution, many advanced information technologies are being applied to the area of construction engineering and project management. These applications are usually focusing on design, construction and operation stage and are producing many meaningful fruits. Even though these studies are very important for the development of the construction industry, this study insists that the other stage perspective such as construction business also should be emphasized. Because business phase has significant impacts on the success of a construction project as well as design, construction and operation phase. So, this study reviewed the intelligent-approach papers in planning and marketing, estimation and bid, contract and claim, and project financing fields. This study provides some insights such as values, difficulties, limitations and future directions of business intelligence application.

  • PDF

UAV를 활용한 토목공사 현장 모니터링 시스템 개발에 관한 연구 (Development of Construction Site Monitoring System Using UAV Data for Civil Engineering Project)

  • 정주석;한선주;강인석
    • 한국건설관리학회논문집
    • /
    • 제18권5호
    • /
    • pp.41-49
    • /
    • 2017
  • 토목공사 발주기관은 공사현장이 대부분 원거리에 위치하고 담당공무원도 다수의 현장을 관리하게 되므로 간접적 방식으로 현장을 관리하고 있다. 토목공사 현장은 광범위한 작업구역을 가지므로 현장 실무자의 보고에 의한 간접적 관리방식으로는 사업전체의 현황을 신속하게 파악하기가 쉽지 않다. 이러한 문제점을 해소하기 위해 발주기관과 현장간의 현장관리시스템은 오프라인에서 온라인방식으로 변화되고 있다. 본 연구에서는 UAV에서 취득한 현장의 3차원정보를 활용하여 원거리에 위치한 현장과 감독기관간에 관련 정보를 온라인으로 공유할 수 있는 개선된 현장관리시스템을 제시한다. 이를 위하여 연구에서는 다수의 실제 현장의 현장관리 운영체계의 문제점을 분석하여 UAV활용 현장관리시스템에 필요로 하는 공사현황보고 및 온라인 정보관리 등의 주요기능을 도출하였다. 연구에서 개발된 시스템은 실제 공사 중인 현장에 적용하여 활용성을 검증하였으며, 다수의 현장 조사를 통하여 기존의 간접적 현장관리 방식과의 효율성 개선사항을 분석하였다.

델파이기법을 활용한 민군간 공용 시설유형 및 고려요소 판단 연구 (Research to define facility type, project consideration and restriction when conceiving civil-military sharing facilities, by applying the Delphi technique)

  • 공금록;강한승;안진호;박영준
    • 대한건축학회논문집:구조계
    • /
    • 제34권2호
    • /
    • pp.57-66
    • /
    • 2018
  • When developing projects to build facilities to be shared by both military bases and surrounding communities, strategies are needed to achieve two objectives: 1) minimize missteps and opposition from local communities in the process of developing and implementing such projects, and 2) promote cost-benefit optimization and user-satisfaction. With aim of promoting co-operation and co-existence between military bases and adjust communities, this research proposes esthetical factors to be considered in conceiving civil-military sharing facilities. It seeks experts' opinions on the development of civil-military sharing facilities, and examines critical factors (economic feasibility, security, and satisfaction, etc.) for project development as well as building types suitable for shared-use between military bases and local residents. It then establishes a method to prioritize facility-type and narrow down design factors (considerations and restrictions) in project development by applying quantitative analysis. The methodological approach of the research employs the Delphi survey method to quantitatively analyze qualitative information drawn from experts' opinions. At the first round of the survey, facility types, items for consideration and restrictions are drawn, and then at the second round of the survey, criticality of each item is analyzed. Finally, it reaches a conclusion on suitability of facility types for civil-military sharing facilities, and selects project considerations and restrictions when developing this kind of project.