• Title/Summary/Keyword: Civil Project

Search Result 1,634, Processing Time 0.024 seconds

A Study on Cause Analysis and Countermeasures of Chloride Attack of Reinforced Earth Retaining Walls Installed on Bridge Abutment (염해로 인한 교대부 보강토옹벽 손상 원인 분석 연구)

  • Do, Jong-Nam;Kim, Nag-Young;Cho, Nam-Hun;You, Kwang-Ho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.12
    • /
    • pp.59-64
    • /
    • 2018
  • The damages to the reinforced earth retaining wall are divided into the front wall, foundation, drainage and upper slope. Damage of reinforced earth retaining wall is mainly caused by damage caused by drainage problem in the field. Recently, damage caused by snow removal materials have been occurred. Recently, the amount of snow removal materials used in winter is increasing due to abnormal weather. This chlorides degrades the concrete structure, where the reinforced earth retaining wall was no exception. There has recently been a case in which the front wall of the reinforced earth retaining wall deteriorates due to the chlorides introduced into the back filling portion through the drainage passage. Therefore, in this study, the cause of damages of reinforced earth retaining wall constructed in bridge abutment was analyzed, and an analytical study was conducted on the countermeasure. As a result, it was found that chlorides, which was introduced through the drainage system in the expansion joint of the bridge shift part or the upper structure, is infiltrated into the back part of the reinforced earth retaining wall and damaged. Therefore, it is suggested to improve the drainage system and restored the stiffness of the front wall.

Prospects of future extreme precipitation in South-North Korea shared river basin according to RCP climate change scenarios (RCP 기후변화 시나리오를 활용한 남북공유하천유역 미래 극한강수량 변화 전망)

  • Yeom, Woongsun;Park, Dong-Hyeok;Kown, Minsung;Ahn, Jaehyun
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.9
    • /
    • pp.647-655
    • /
    • 2019
  • Although problems such as river management and flood control have occurred continuously in the Imjin and Bukhan river basin, which are shared by South and North Korea, efforts to manage the basin have not been carried out consistently due to limited cooperation. As the magnitude and frequency of hydrologic phenomena are changing due to global climate change, it is necessary to prepare countermeasures for the rainfall variation in the shared river basin area. Therefore, this study was aimed to project future changes in extreme precipitation in South-North Korea shared river basin by applying 13 Global Climate Models (GCM). Results showed that the probability rainfall compared to the reference period (1981-2005) of the shared river basin increased in the future periods of 2011-2040, 2041-2070 and 2071-2100 under the Representative Concentration Pathways (RCP)4.5 and RCP8.5 scenarios. In addition, the rainfall frequency over the 20-year return period was increased in all periods except for the future periods of 2041-2070 and 2071-2100 under the RCP4.5 scenario. The extreme precipitation in the shared river basin has increased both in magnitude and frequency, and it is expected that the region will have a significant impact from climate change.

An analysis of hydraulic characteristics of stepped boulder fishway installed in mountain stream (산지하천에 설치된 계단식 전석 어도의 수리 특성 분석)

  • Kim, Ki Heung
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.1
    • /
    • pp.99-109
    • /
    • 2022
  • This study was intended to suggest the applicability of stepped boulder fishway using the concept of traditional boulder weir, focusing on the problems of existing concrete pool-and-weir fishways installed in mountain streams. To achieve this purpose, a stepped boulder fishway was designed and constructed as a pilot project in consideration of ascending capacity of the selected target fishes. Under the given discharge conditions, the hydraulic characteristics of the fishway were investigated in the field, and the characteristics and ascending capacity of the fishes were compared and analyzed. The fishway had a short length and steep slope, but the mean drops between each baffle were the range of 0.15 to 0.29 m, and this range satisfied the limit condition of about 0.40 m, which was in the limit of the drop that target fishes can ascend. The mean velocities of each baffle and pool were 0.82 to 0.87 m/sec and 0.13 to 0.24 m/sec. This result satisfied the conditions of burst speed (10 to 30 times of body length) and mean velocity of the resting pool (7 to 25% of burst speed) for target fishes. Since the bottom surface of the pool formed of boulders had a gentle reverse slope and rotational flow did not occur, the efficiency of fishway can be increased, and it will also be possible to solve the maintenance problem by flushing bed materials.

Development of A Quantitative Risk Assessment Model by BIM-based Risk Factor Extraction - Focusing on Falling Accidents - (BIM 기반 위험요소 도출을 통한 정량적 위험성 평가 모델 개발 - 떨어짐 사고를 중심으로 -)

  • Go, Huijea;Hyun, Jihun;Lee, Juhee;Ahn, Joseph
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.15-25
    • /
    • 2022
  • As the incidence and mortality of serious disasters in the construction industry are the highest, various efforts are being made in Korea to reduce them. Among them, risk assessment is used as data for disaster reduction measures and evaluation of risk factors at the construction stage. However, the existing risk assessment involves the subjectivity of the performer and is vulnerable to the domestic construction site. This study established a DB classification system for risk assessment with the aim of early identification and pre-removal of risks by quantitatively deriving risk factors using BIM in the risk assessment field and presents a methodology for risk assessment using BIM. Through this, prior removal of risks increases the safety of construction workers and reduces additional costs in the field of safety management. In addition, since it can be applied to new construction methods, it improves the understanding of project participants and becomes a tool for communication. This study proposes a framework for deriving quantitative risks based on BIM, and will be used as a base technology in the field of risk assessment using BIM in the future.

Design of Simulation Prototype UI for Virtual Reality-based Air Blast and Vibration (가상현실 기반 발파소음 및 진동 시뮬레이션 UI 설계)

  • Lee, Dongyoun;Lee, Sang Gyu;Seo, Myoung Bae
    • Smart Media Journal
    • /
    • v.10 no.4
    • /
    • pp.35-44
    • /
    • 2021
  • Recently, the new subway project called "Great Train Express" is in progress. During the tunnel excavation in the center of city, vibration and noise are generated, which make an uncomfortable effect on nearby residents. In order to prepare for this situation, the construction company generally establishes a noise and vibration management plan at the site from the construction planning stage through consultation with the residents of nearby areas and establishment of countermeasures for complaints raised. However, despite the establishment of a noise and vibration management plan, civil complaints have not been fundamentally resolved due to occurring noise and vibration during the construction in progress. In order to solve this problems, one of the best solution is to provide noise and vibration simulation technology with a high sense of reality and immersion for residents of nearby areas. Considering the ease and convenience of using the system, we intend to develop a UI(User Interface) necessary for the development of a simulation system that can directly experience the air blast and vibration based on virtual reality. The results of this study are expected to contribute to the development of virtual reality-based air blast and vibration simulations in the future.

Sustainable Business Model of Water Purification Equipment and Local Manufacturing Technology Transfer of High Adsorption Bone Char to Remove Fluoride from Groundwater (지하수 불소제거를 위한 고흡착 골탄의 현지 제조기술 이전과 정수장치의 지속 가능한 비즈니스 모델 개발)

  • Maeng, Min-Soo;Lee, He-In;Byun, Jung-Seop;Park, Hyo-Jin;Shin, Gwy-Am
    • Journal of Appropriate Technology
    • /
    • v.7 no.1
    • /
    • pp.41-50
    • /
    • 2021
  • Gongali model Co. Ltd located in Arusha, Tanzania is operating a Nanofilter water station using locally produced bone char to remove fluoride in groundwater. Bone char produced locally had a high turbidity and high concentration of organic matter, which cause color. In addition, since the fluorine adsorption efficiency is low, there is a problem in high maintenance cost due to a short replacement cycle of bone char. In order to overcome this challenge, our research team was that a local furnace was manufactured and applied for produce high adsorption bone char in Gongali model Co. Ltd. By producing high-adsorption bone char locally, the operating efficiency of the Nanofilter water station increased, and it was possible to stably and continuously provide drinking water to local residents. In addition, by presenting a sustainable business model to Gongali model Co Ltd, the persistence of high adsorption bone char and a plan to spread the Nanofilter water station were suggested. Therefore, it was possible to propose a plan to continuously supply low-cost drinking water to the low-income and the neglected class through this local project.

Evaluation on the Performance of Relief Wells Using Geosynthetics Blanket Length as a Parameter in an Agricultural Reservoir Embankment (농업용 저수지 제방에서 토목섬유 블랭킷의 길이에 따른 감압정의 성능 평가)

  • Ryu, Jeonyong;Kim, Seungwook;Chang, Yongchai
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.6
    • /
    • pp.5-17
    • /
    • 2022
  • The performance of the relief wells installed for the purpose of controlling seepage of the dam embankment is affected by various parameters such as diameter, spacing, penetration rate, permeability coefficient of the ground, thickness of the foundation layer. Therefore, when the relief wells are adopted for the purpose of reducing seepage pressure, these parameters should be sufficiently reviewed to determine the installation specifications of the relief wells. This study evaluated the effect of the length of the geosynthetics blanket on the performance of the relief wells installed in the downstream part of the dam embankment with blankets in the upstream and downstream part of the dam embankment as countermeasure methods to control seepage of the dam embankment. In the relationship between the length of the upstream and downstream blanket and the discharge, the discharge of the relief wells decreases as the length of the upstream blanket increases, and on the other hand, the discharge of the relief wells decreases as the length of the downstream blanket increases. In the upper and lower blanket length-spacing relationship, as the length of the upstream blanket increases, the spacing of the relief wells increases and as the length of the downstream blanket increases, the spacing of the relief wells decreases. Therefore, when installing the relief wells in parallel with the blanket, it was found that increasing the length of the upstream blanket is more efficient than increasing the length of the downstream blanket in order to minimize the discharge of seepage discharge and to ensure economic feasibility by wider installation of the relief wells.

The Analysis and Forecasting Model for Maintenance Costs Considering Elapsed Years of Old Long-Term Public Rental Housing (노후 장기공공임대주택의 경과 연수별 유지관리비 분석 및 예측 모형)

  • Jung, Yong-Chan;Jin, Zheng-Xun;Hyun, Chang-Taek;Lee, Sanghoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.83-94
    • /
    • 2022
  • The number of public rental housing has increased according to the government's 「Housing Welfare Roadmap (2017)」, and facility maintenance costs for the demand of improvement of performance and residential standards due to the aging of long-term public housing are significantly increasing. Consequently, the financial burden of public housing rental business for maintaining stocked housing is aggravated. However, there is a lack of objective data to analyze the size of the maintenance costs that are executed by the type of repair work, and the elapsed years of the aged long-term public rental housing. This study analyzes the execution status of 33 long-term public rental housing complexes located in Seoul for 14 to 28 years of elapsed years based on the data of maintenance costs. In addition, this study proposes a model to predict the maintenance costs by elapsed years by dividing 'Long-term Repair Plan Work and Government-Funded Project [Y1]', 'Planned Repair Work and General & Unplanned Repair Work [Y2]', and 'Total maintenance costs [Y3]'. It is intended to be used as basic data for the establishment of the maintenance plan at the stage of setting up the budget and the establishment of the sustainable operation plan for public rental housing

Analysis of the Influence of Design Score and Price Score for Design Build Bidding (설계시공일괄입찰에서 설계점수와 가격점수의 영향력 분석)

  • Lee, Jinhak;Woo, Sungkwon;Lee, Siwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.44-51
    • /
    • 2023
  • Selecting appropriate bidding system in construction projects considering the characteristic of project can be a make-or-break element, so the understanding for bidding system of public construction projects is ever more important from the perspective of both the owner and the contractor. The design-build bidding is commonly referred to as turnkey in Korea, and is a bidding method that is often applied to large public construction projects because it allows new technologies to be applied to the design and facilitates risk management for the owner. In this bidding method, there are only two factors (design score and price score) that affect the selection of the winning bidder, so it is important to understand the influence of each factor, but there is little research on the subject. This study aims to provide a basis for establishing bidding strategies for understanding the influence between design score and price score by analyzing various design-build bidding data of public construction projects. The results of the study show that design score is the factor that has more influence on the ranking of bidders in all three weighted evaluation methods: design-emphasized, price-emphasized, and equalized evaluation. In addition, we found that the correlation between design and price scores was not significant due to the unique bid evaluation structure in Korea.

How to automatically extract 2D deliverables from BIM?

  • Kim, Yije;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1253-1253
    • /
    • 2022
  • Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.

  • PDF