• Title/Summary/Keyword: CM professionals

Search Result 30, Processing Time 0.018 seconds

A Study of Construction Management Professionals' Vocational Ethics (CM전문가의 직업윤리에 관한 연구)

  • Kim, Seung-Jin;Kwun, Joon-Bum;Lee, Jae-Wook;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.89-98
    • /
    • 2012
  • The growth of CM(construction management) market poses business opportunities and challenges to improve vocational ethics of CM professionals and firms. Ensuring the vocational ethics of CM professionals is an important issue not only for individual CM professional but also CM firms and CM industry in general. The objective of the study is to investigate relationships between the importance and performance of CM professionals' vocational ethics and discuss key characteristics and implications. The IPA(Importance-Performance Analysis) technique is used as a research tool. Findings show that quality CM service and competencies are the core of CM professionals' vocational ethics. But there exists a gap between importance and performance of CM professionals' vocational ethics.

A Study of the Future Strategy and Mission for the Stakeholders in Industry, Academy, and Government for the Revitalization of CM (CM 활성화를 위한 산학관 분야의 향후 발전방향 및 미래과제)

  • Park, Hyung-Keun;Shin, Kyoo-Chul;Park, Hwan-Pyo;Jung, Young-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.244-256
    • /
    • 2008
  • The Construction Management contracting method and administration system had introduced to Korea 10 years ago. The actual CM consulting contract has adapted just for 5 years only. The CM administration system proves lots of innovative construction practices, upgrading construction industry from corporations to site operations. However, there are more tasks to the CM professionals to revitalize CM contracting methods and administration system. This research investigated what CM has achieved for the past 10 years and what CM should accomplish for the coming 10 years as future strategy and missions. Overseas CM practices are reviewed and domestic market, regulations, requirements are investigated through structured interviewed and in-depth survey to CM professionals. Many interesting issues were found through research process and those topics were categorized by industry, academy and government for defining current problems and future tasks. These issues for future strategy and mission needs to be utilized to develop future CM contracting methods and administration system. The system to follow up these meaningful results of CM is important for the future progress.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.

Development of Radiation Restrictor for Secondary Radiation Shielding of Mobile X-ray Generator (이동형 X선 발생장치의 2차 방사선 차폐를 위한 선속조절기 개발 연구)

  • Koo, Bon-Yeoul;Kim, Gha-Jung
    • Journal of radiological science and technology
    • /
    • v.41 no.5
    • /
    • pp.397-403
    • /
    • 2018
  • Mobile X-ray generators are used not in the radiation area but in open space, which causes the exposure of secondary radiation to the healthcare professionals, patients, guardians, etc., regardless of their intentions. This study aimed to investigate the shielding effect of the developed radiation restrictor to block the secondary radiation scattered during the use of mobile X-ray generator. Upon setting the condition of mobile X-ray generator with chest AP, spatial doses were measured by the existence of human equivalent phantom and radiation restrictor, and measured by the existences of phantom and radiation restrictor at the same length of 100 cm. Measurements were taken at intervals of 10 cm every $30^{\circ}$ from $-90^{\circ}$ (head direction) to $+90^{\circ}$ (body direction). Upon the study results, spatial doses in all direction were increased by 45% on average when using phantom in the same condition, however, they were decreased by 64% on average when using the developed radiation restrictor. The dose at 100 cm from the center of X-ray was $3.0{\pm}0.08{\mu}Gy$ without phantom and was increased by 40% with $4.2{\pm}0.08{\mu}Gy$ after phantom usage. The dose when using phantom and the developed radiation restrictor was $1.4{\pm}0.08{\mu}Gy$, which was decreased by 66% compared to the case without using them. Therefore, it is considered the scattered radiation can be shielded at 100-150 cm, the regulation of the distance between beds, effectively with the developed radiation restrictor when using mobile X-ray generators, which can lower the radiation exposure to the people nearby including healthcare professionals and patients.

A Study on Shoes for Culinarian Use in the Kitchen Environment (조리 환경에 적합한 기능성 신발(조리화)에 관한 연구)

  • Oh, Suk-Tae
    • Culinary science and hospitality research
    • /
    • v.15 no.1
    • /
    • pp.296-308
    • /
    • 2009
  • According to Lee In-ja's research into the cooks of Korea, there are more than 1.2 million culinary professionals in Korea. However, it is hard to find studies on their work environment. From this point, this study aims to examine the shoes worn by culinarians in their workplace and facilitate the improved environment to protect culinary professionals against potential dangers such as slips, occupational and industrial injuries and fatigue, on the basis of the shoes they wear. The research was conducted on a representative cross section of safety shoes currently worn by culinary professionals. The four factors to be tested and measured for the study were weight, slip resistance, internal tearing strength and splitting resistance. Findings on inquiry showed that the shoes tested were quite heavy, slippery and readily liable to splitting under low stress - when compared to standardized base figures. In accordance with the results of this experiment, guidelines for four factors of manufacture were suggested. First, chef's shoes should weigh not more than 1% of a wearers weight. Second, they should exhibit more than 0.50 $\mu$ slip resistance. Third, they should withstand at least 50.0 N/mm tearing strength. And finally, they should have upwards of 3.0 kg/cm splitting resistance.

  • PDF

Comparison of Pepper Grafting Efficiency by Grafting Robot (접목로봇의 고추묘 접목 효율성 비교)

  • Kim, Hye Min;Hwang, Seung Jae
    • Journal of Bio-Environment Control
    • /
    • v.24 no.2
    • /
    • pp.57-62
    • /
    • 2015
  • Manual grafting is a labor-intensive operation and highly susceptible to human error. Development of grafting robot has been considered as an effective alternative to manual grafting. The study was conducted to investigate the grafting efficiency between the domestically produced automated grafting robot and traditional manual grafting performed in a commercial plug seedling greenhouse. Plug seedlings of pepper (Capsicum annuum L.) 'Buchon' and 'Anseongmatchum' were sown as scions and rootstocks, respectively on March 29, 2013. The grafting was performed by a grafting robot, amateur grafters, and professional grafters on May 31, 2013. After grafting, the seedling efficiencies and seedling characteristics were compared in terms of plant height, the number of success as well as failure of seedling grafts produced in an hour. The results showed that plant heights were most uniform in the grafts performed by the professionals that had a 0.6 cm difference whereas an uneven difference of 2.1 cm difference was observed in plug seedling grafted by an amateur. However, plug seedlings grafted by the grafting robot were found to be uniform with 1 cm plant height difference. Moreover, the maximum number of grafting processed plug seedlings per hour (667 plants) was achieved by the grafting robot on compared with the seedlings grafted (466 plants) by the professionals. Furthermore, the least failure rate of 21.7% was noted upon the usage of grafting robot than the manual grafters. Thus, the results demonstrate that the technology of automated grafting robots is the most appealing and can be employed in commercial plug seedling greenhouses to overcome the drawbacks of manual grafting.

Improving Archival Descriptive Standard Based on the Analysis of the Reviews by Archival Communities on RiC-CM Draft (RiC에 대한 기록공동체의 리뷰를 통해 본 기록물 기술표준 개선을 위한 제안)

  • Park, Ziyoung
    • The Korean Journal of Archival Studies
    • /
    • no.54
    • /
    • pp.81-109
    • /
    • 2017
  • This study suggests an analysis of the reviews provided by international archival professionals on the RiC-CM draft published by ICA EGAD. Some implications for the Korean archival management environment were also suggested. Some professional reviews were accessible through the internet. Italian archival professionals held workshops at various levels for the analysis and discussion of the draft. Duranti, the project director of InterPARES, also gave opinions about the draft in cluding the perspective of digital preservation. In the review of Artefactual, the draft was discussed in terms of system implementation. Reed, the director of Recordkeeping Innovation, also gave a feedback based on the record management experiences in Australia. Some implications can be suggested based on these professional opinions. First, we should try to build a test bed for the adoption of RiC to archival description in the Korean environment. Second, a minimum level of data elements that can secure authenticity and integrity will also be needed. Third and lastly, rich authority data for agents and functions related to archival records and records groups are essential to take full advantage of the standard.

The Perception Research on the Career Development of the Non-Certified Qualification Acquisitors of National Construction Management (국내 건설사업관리(CM) 민간자격 인증자들의 경력개발에 대한 인식조사)

  • Yu, Hoe-Chan;Ahn, Hyoung-Jun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.231-234
    • /
    • 2009
  • Recently, the roles of the construction engineers become more important in all phases of construction project life cycle. Construction engineers' capabilities is one of the key factors to accomplish construction project objectives. After acquiring basic Knowledge and skills in colleges, the construction engineers have opportunities to develop their abilities through continuous education provided by companies, associations, colleges, and so on. The current eduction system is not sufficient enough to assist engineers to develop their potentials. The construction professionals training system that help career development, career management, education and training is need to raise excellent engineers in a long term perspective. In order to investigate the necessity and the element in the career development support, I perfromed the perception about the career deveolopment by doning question investigation.

  • PDF

A Study on the Size Changes of Men in the 20′s - Focusing on the Lateral View of their Upper Bodies - (20대 남성의 상반신 측면형태에 따른 치수변화에 관한 연구)

  • 곽연신;김애린
    • Journal of the Korean Society of Costume
    • /
    • v.54 no.2
    • /
    • pp.149-165
    • /
    • 2004
  • In this study, the photographic and anthropometric measurements of men in the 20's were made. and pattern making professionals visually evaluated their side photos to classify lateral views. These data were analyzed by being compared with existing research results to select objective standards, and body types were classified according to the selected standard. In addition, body features were defined according to lateral views based on measurement items and indices, and standard lines and determining factors for visual evaluation which determines lateral views were revealed. Back length - front length size smaller than 1.5cm was named as the lean-back type, 1.5∼3.9cm was named as the straight type. and that larger than 3.9cm was named as the bend-forward type. In the straight type, the bisection point of waist depth was located at a similar place to tragion level vertical line. In the lean-back type, the point was at the front of tragion level vertical line. In the bend-forward type, the point was at the back of tragion level vertical line.

Analyzing the Engagement of Professional Construction Managers in Construction Management firm and Its Improvement Measures (CM 전문회사 단장 활용실태 및 개선방안)

  • Son, Chang-Baek;Huh, Young-Ki;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.87-95
    • /
    • 2013
  • The number of construction management firms has been increased as construction management delivery system has been active in Korean construction market. the capability of leading construction management professional, who is responsible for managing project administration, is important for commissioning construction management contracts. The quality of project proposal and the capability of leading construction management professional, which are assessed by the board of contract awarding committee, are the major contributors for commissioning the public construction management projects administered by the Korean public procurement service for contracting. Therefore, employing a very competent leading construction management professional is the critical strategy for awarding contract to the construction management firms' part. That is why the firms should secure a fixed number of leading construction management professional in a waiting list to proceed the contract commissioning process for expectant candidate projects, even if there is no project assignable to the leading construction management professionals. However, a measure that makes effectively use of the leading construction management professional in a waiting list has not been systematically implemented in the firms. In turn, the firm suffers considerable loss in a project personnel supply and demand plan. Expert opinions were obtained by the survey questionaries administered to top management of the construction management firms which are engaged in the construction management contracts for commissioning the public construction management projects administered by the Korean public procurement service either as principal or co-principal deliverer. This paper presents the findings obtained by investigating the actual employment state of the leading construction management professional in the waiting list and by analyzing the issues involved in mobilizing and demobilizing them. It contributes to implement a practical guide for searching effective solutions to the issues.