• Title/Summary/Keyword: Business Process Improvement Projects

Search Result 77, Processing Time 0.026 seconds

Defining Business Process Improvement(BPI) Projects with Analysis Results Based on the Cause-and-Effect Chain (인과관계체인 기반의 분석 결과를 활용한 비즈니스 프로세스 개선 과제 정의)

  • Kang, Jun-Gyu;Lim, Seung-Kil
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.1
    • /
    • pp.101-109
    • /
    • 2015
  • This paper suggests a procedure to define business process improvement (BPI) projects with analysis results based on the cause-and-effect chain. The procedure developed in this paper focuses on eliminating root causes of business problems resulted from abnormal events occurred in business process executions. First, we develop three criteria used to make clusters of the root causes where a cluster of root causes will be eliminated together by a BPI project defined based on the cluster. Second, we develop a method to formulate desired expectations from the BPI project. Also, we suggest a method to calculate the relative importance of the BPI projects that help a BPI organization determine priorities of them. We illustrate the procedure and the methods with some examples for the domestic mail delivery process in the postal service industry.

A Study on Effective Utilization of Historical Data of Software Companies (소프트웨어사업자 실적데이터 활용방안에 관한 연구)

  • Kim, Joong-Han
    • Journal of Information Technology Services
    • /
    • v.7 no.1
    • /
    • pp.103-116
    • /
    • 2008
  • Efficiency and objectiveness are the most critical issues in the evaluation of software projects. It is beneficial not only to software companies participated in bids, but to administrators of projects. This study attempts to find an improvement in the evaluation process by connecting the historical data of bidding companies in the software company report system with the governmental procurement system. The proposed means will eliminate unnecessary and repetitive submission step of bidding companies and provide the administrator with objective evaluation process. Also, this paper proposes an automated process for quantifying the business experience of bidding companies.

An Analysis of Locational Factors to Affect Residential Improvement Projects in Busan Metropolitan City (부산의 주거정비사업 추진에 미치는 영향요인 분석)

  • Kim, Jung-Don;Oh, Se-Kyung;Lim, Jae-Moon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.1
    • /
    • pp.125-132
    • /
    • 2012
  • Busan metropolitan city faced with very low completion rate of residential environment improvement projects. Main reason is to designate proposed residential environment improvement areas without careful analysis of the possibilities of the improvement project completion. This study aims to clarify and analyze the phase characteristics of residential environment improvement process by using 12 variables representing 5 locational characteristics such as place factors, topological factors, size factors, location condition factors and regulation factors. From results of the analysis, this study finds that business floor area ratio, improvement type and site size affect significantly the completion rate of residential redevelopment projects. However, business floor ratio, improvement type, width of frontage road and slope are significant variables to affect the completion rate of residential rebuilding projects.

Operational Problem Analysis and Improvement Plan in the Smart Factory Promotion Process

  • Lee, Seong-Hoon;Lee, Dong-Woo
    • International journal of advanced smart convergence
    • /
    • v.11 no.4
    • /
    • pp.273-278
    • /
    • 2022
  • Uncertainty is increasing around the world due to COVID-19 and Ukraine crisis. In this situation, each company is making countless efforts to survive. In Korea, smart factory projects targeting small and medium-sized businesses with difficulties have been continuously promoted. As for the smart factory business that has been promoted so far, the base expansion of the smart factory is also steadily increasing as the number of companies carrying out the project is increasing. It was also found that it contributed to productivity improvement and quality improvement. Despite these positive aspects, difficulties and operational problems are also appearing in the process of promoting smart factories. In this study, we investigated and analyzed operational problems and difficulties in the process of promoting smart factories. In addition, improvement plans for problems were presented according to the contents of this analysis, and improvement plans were presented by classifying them into introduction and supply companies, considering that the smart factory business is formed in the form of a consortium between introduction and supply companies.

A Life Cycle-Based Performance-Centric Business Process Management Framework For Continuous Process Improvement (지속적 프로세스 개선을 위한 성과 중심의 생애 주기 기반 비즈니스 프로세스 관리 프레임워크)

  • Han, Kwan Hee
    • The Journal of the Korea Contents Association
    • /
    • v.17 no.7
    • /
    • pp.44-55
    • /
    • 2017
  • Many enterprises have recently been pursuing process innovation or improvement to attain their performance goal. To comprehensively support business process execution, the concept of business process management (BPM) has been widely adopted. A life cycle of BPM is composed of process diagnosis, (re)design, and enactment. For aligning with enterprise strategies, all BPM activities must be closely related to performance metrics because the metrics are the drivers and evaluators of business process operations. The objective of this paper is to propose a life cycle-based BPM framework integrated with the process-based performance measurement model, in which business processes are systematically interrelated with key performance indicators (KPIs) during an entire BPM life cycle. By using the proposed BPM framework, company practitioners involved in process innovation projects can easily and efficiently find the most influencing processes upon enterprise performance in the process diagnosis phase, evaluate the performance of newly designed process in the process (re)design phase, monitor the KPIs of new business process, and adjust business process activities in the process execution phase through the BPM life cycle.

Selecting Six Sigma Projects

  • Akpolat, Hasan;Xu, Jichao
    • International Journal of Quality Innovation
    • /
    • v.3 no.2
    • /
    • pp.132-137
    • /
    • 2002
  • The quality improvement methodology Six Sigma gained enormous international popularity in the past few years, mainly due to its successful implementation at General Electric. Six Sigma is now commonly understood not only as a statistical measure for process performance (6$\sigma$ stands for 3.4 defects per million opportunities) to improve product quality but it has also become a strategic initiative undertaken by many organisations to improve management quality. In the centre of the Six Sigma methodology is the improvement project, often referred to as Black Belt or Green Belt project. Although every business is different and business priorities differ from company to company, however all businesses face the same problem when it comes to Six Sigma projects: How to choose the right project\ulcorner This article intends to provide some answers to this and other frequently asked questions about Six Sigma projects.

System Improvement Measures for Rational Procedures of Offshore Wind Power Generation Projects : Focusing on Permits (해상풍력 발전사업의 합리적 절차를 위한 제도개선 방안 : 인허가를 중심으로)

  • Seok-Kyu Kang;Jeong-Gab Moon;Mun-Kwan Jo
    • The Journal of Fisheries Business Administration
    • /
    • v.54 no.2
    • /
    • pp.59-76
    • /
    • 2023
  • This study is to propose ways to improve the system for rational procedures for offshore wind power generation projects. The results of this study are summarized as follows. In order to quickly distribute and develop offshore wind power projects, the permitting period should be shortened through special laws, the government actively intervenes to support the formation and operation of privat-public councils to ensure residents' acceptance. In this way, it can be competitive in the future energy market. Above all, a special law (proposal) related to offshore wind power currently pending in the National Assembly should be passed as soon as possible. Finally, the government and local governments that manage public waters should provide active administrative support based on system improvement measures in consideration of these permits, and the project's main body should minimize damage to the marine environment and ecosystem. Through these subject-specific roles, offshore wind power generation will be able to reduce carbon emissions and help establish a sustainable energy production system.

The Improvement Scheme of Rural Villages by Spatial Characteristics (농촌마을정비시 농촌공간특성별 정비유형 분석)

  • Choi, Young-Wan;Yoon, Yong-Cheol;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.16 no.2
    • /
    • pp.1-10
    • /
    • 2010
  • This study aimed to systematically adjust rural area development projects that have been carried out by a variety of government departments for activation of rural areas and overcome inefficient problems caused by the policies and projects promoted separately. As its alternative, this study aimed to explore efficient improvement scheme of rural villages associated with various projects. Major agriculture/rural policies and projects that have been promoted were classified by the target space of the policies and projects as Environment space, living space, and production space. Each space was categorized into five sub-items without duplication. By assessment results of rural area improvement level and preference by Analytic Hierarchy Process(AHP) method, maintenance of rural areas was classified into four types. And outer space structure was analyzed by using Space Syntax Method(SSM). Based on the analysis result above, facilities for improvement of rural villages were placed around representative facilities. Facility allocation was based on selection and concentration in terms of facility maintenance and on type attributes in terms of spatial aspects. And finally, alternatives schemes for setting up the basic direction of improvement of rural villages are local area characteristics and environmentally conscious business plan.

Integration of Six Sigma and BPM for Continuous Process Improvement (지속적 프로세스 개선을 위한 6시그마와 BPM 통합 모형)

  • Yoon, Ji Hyun;Jung, Jae-Yoon
    • The Journal of Bigdata
    • /
    • v.2 no.1
    • /
    • pp.5-15
    • /
    • 2017
  • Six Sigma has been adopted for the last two decades in many industries of manufacturing and service business to implement processs improvement. The methodology has difficulties in discovering target projects in the Define step and in controlling continuous measure and control in the Control step. To address the problem, more advanced system is required to support continuous control and management, and business process management (BPM) can be an effective solution for this problem. In this research, we introduce integrated models of Six Sigma and BPM for the purpose of realizing continuous process improvement, and explain the procedure of analyzing, improving, and monitoring the processes based on the data which has been accumulated in business process execution. It is expected that this integrated approach can maximize business performance by improving and managing business continuously on the integrated platform of two business innovation strategies, Six Sigma and BPM.

  • PDF

Six Sigma Business Breakthrough Strategy (6시그마 경영혁신전략)

  • 홍성훈;김상부;권혁무;이민구
    • Journal of Korean Society for Quality Management
    • /
    • v.27 no.1
    • /
    • pp.223-231
    • /
    • 1999
  • The concept of six sigma was introduced at and popularized by Motorola in its quest to reduce defects of manufactured electronics products. When used as a metric, six sigma technically means having no more than 3.4 defects per million opportunities in any process, product, or service. More important than the technical definition is the concept of six sigma as a disciplined, quantitative approach for improvement of defined metrics in manufacturing, service, or financial processes. This approach derives the overall process of selecting the right projects based on their potential to improve performance metrics and selecting and training the right people to get the business results.

  • PDF