Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.

"Standard Model" approach to building projects in the UK and potential role of project team to mitigate any local difference~from international developer's perspective

  • Tanaka, Koji
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.425-432
    • /
    • 2020
  • In order to improve the sustainability and smart construction, it is discussed arguably that developing and applying consistent "standard model" to plan business, design, construct and operate a building is considered to be one of the effective and efficient approach. The scope of this article is to examine, from the international developer's perspective, the "standard model" approach of a hotel brand to building projects in the UK, and also to explore potential role of project team to mitigate any local difference at the project level. These projects are developed by the same developer adopting the same business plan, design and operation to each project. In order to clarify the actual and likely difference in construction results, reference is also made to those building projects located in other geographical markets including Japan, Germany and USA, and focus is given on the analysis of its programme and cost. Principle findings are that there exists geographical difference especially in environmental and planning system, and that major local difference is found at least in the programme at the design stage. In contrast, the difference in the building cost itself may not be necessarily considered major if currency exchange rate being taken into account appropriately. It is also observed that there were cases where any difference in the programme was mitigated by taking different approach to procuring and defining roles of management and professional team at the project level. In conclusion, from the international developer's perspective, the geographical difference of the "construction system" surrounding building projects can typically lead to major prolongation of programme, however, these different construction results could be mitigated at least to a certain extent by introducing appropriate changes to the role of project team.

  • PDF

Influence of Organizational Culture on Performance of Building Construction Project (건축현장 조직문화가 프로젝트 성과에 미치는 영향)

  • An, Sung-Hoon;Bitamba, Bauma Frigeant
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.5
    • /
    • pp.501-506
    • /
    • 2015
  • Construction companies want to improve the abilities of field organizations for improving the performance of construction projects. It is possible to improve the performance of construction projects by managing the field organizational culture, due to the field organizational culture is concerned with the abilities of construction field organizations. Therefore, the purpose of this study is to reveal the influence of the field organizational culture on the performance of building construction projects. The results of this study showed that field organizational cultural characteristics influence on the performance of construction projects. Best performed projects have the higher characteristics of a consensus culture and rational culture, and worst performed projects have the lower characteristics of a development culture and consensus culture. In addition, the characteristics of rational culture and hierarchy culture effect on the performance in worst performed projects. This study is expected to help to improve the performance management system in construction field organization.

Analyzing the Weight of Assessment Criteria in Korea Green Building Certification System - Focused on Certification Standards for Multi-unit Apartment Projects - (국내 친환경 건축물 인증제도 평가항목의 중요도 분석 - 공동주택 인증심사기준 중심으로 -)

  • Choi, Yeo-Jin;Lhee, Sang-Choon
    • KIEAE Journal
    • /
    • v.12 no.1
    • /
    • pp.83-90
    • /
    • 2012
  • Over the world, social demands and concerns of energy and resource depletions and environmental conservation have resulted in many researches and applications on sustainable development and construction. In order to support these demands and concerns, international green building certification systems such as LEED(Leadership in Energy and Environmental Design) and BREEAM(Building Research Establishment Environmental Assessment Method) were developed. In Korea, the green building certification system was introduced in 2000 and widely applied to all types of new buildings in order to induce the diffusion of sustainable buildings on May, 2010. This paper investigates the importance of assessment criteria on multi-unit apartment projects among certification rating systems using the AHP(Analytic Hierarchy Process) method and suggests a new direction on certification assessment standards. For applying the AHP method, the survey of staffs in green building certification consulting companies and architectural design companies was conducted via e-mail. As a result, criteria like energy, indoor environment, land use, pollution control, and ecological environment among 9 main ones turned out important on assessing green building certification at multi-unit apartment projects, while criteria like water resource, transportation, maintenance management, and material and resource did relatively unimportant.

A Study on the theory and cases of Constructability for Building Projects -With Case Study Application in Japan- (건설공사의 Constructability 이론과 적용사례에 관한 연구 - 일본의 사례연구를 중심으로 -)

  • Kim, Jin-Ho;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.2
    • /
    • pp.157-164
    • /
    • 2002
  • In this study, attempts to analyze the case study of production design were carried out through: 1) exploration of the factors influencing the interface between architectural and production design phases; 2)application of precast technologies. Building design and construction planning in Japan may be characterized by ample use of Production Design which extends over the whole projects phases. Taking a composite construction system for apartment buildings which allow for alternative combination of different technologies as a case study object, three projects have been chosen to analyze actual process of determining product sub-system and their specification. And the expectancies of this paper are that it can be used as efficient data for improvement of system to systematize Constructability(Buildability) in korea.

Selection of the Optimal Building Skin-System in Remodeling Projects (그린 리모델링을 위한, 적정 외피시스템 선정에 관한 연구)

  • Shin, Young-Su;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.296-297
    • /
    • 2014
  • United Nations Framework Convention on Climate Change(UNFCCC), an international treaty to prevent the regulation and global warming, has passed through the General Assembly for 17 times from 1992 to 2011. To create a performance plan specific, such as the Kyoto Protocol, it is to promote the reduction of energy consumption and greenhouse gases worldwide. In South Korea, Korea Infrastructure Safety and Technology Corporation(KISTEC) is working and supporting for developing method of green remodeling policy. Among several solutions, "Remodeling" ensures to increase the energy efficiency of buildings and to reduce the emissions of greenhouse gases, and consequently it could maintain buildings high efficiency. For remodeling projects, it is most important to determine construction plan including remodeling scopes and methods, while the plan has been determined by the engineer's background and experience. Therefore, this study aims at developing a method for selecting optimal skin system which has remarkable influence to energy performance of the buildings.

  • PDF

An Analysis of Design Errors Detected During BIM-based Design Validation - Case Studies in South Korea (BIM 설계 검토를 통해 발견된 설계 오류 분석 -한국 BIM 프로젝트 사례 분석)

  • Won, Jongsung;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.158-159
    • /
    • 2016
  • This paper aims to analyze design errors prevented by building information modeling (BIM)-based design validation to identify consideration factors for successfully implementing BIM-based design validation in the architecture, engineering, and construction (AEC) projects. More than 1,300 design errors detected by BIM-based design validation in three BIM-based projects in South Korea are categorized according to its causes, work types, and likelihoods to cause project delay and cost overrun. Each design error is analyzed by conducting face-to-face interviews with practitioners in the three projects.

  • PDF

An Analysis on Relations between Design Errors Detected during BIM-based Design Validation and the Impacts Using Logistic Regression (로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.264-265
    • /
    • 2017
  • This paper aims to analyze relations between design errors prevented by building information modeling (BIM)-based design validation and their impacts in order to identify critical consideration factors for successfully implementing BIM-based design validation in the architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to its causes and work types. The relations between causes and work types of design errors and project delay, cost overrun, low quality, and rework generation that can be caused by the errors are analyzed through conducting logistic regression. Characteristics of each design error are analyzed by conducting face-to-face interviews with practitioners in the two BIM-based projects. As the results, the impacts of design error causes on predicting project delay, cost overrun, low quality, and rework generation were the highest.

  • PDF

Analysis of Cost-Increasing Factors in High-rise Building Construction Projects Using Delphi Method (델파이 기법을 이용한 초고층 건축시공의 공사비 상승요인 분석방법에 관한 연구)

  • Lee, Byeong-Hun;Jin, Hyun-Soo;Kim, Kyong-Hoon;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.105-109
    • /
    • 2010
  • Nowadays, the construction of high-rise building is rapidly increasing. There are many cost-increasing factors to the management in the high-rise building construction. For large and complex projects like the high-rise building construction, the more systematic methods and tools are needed for cost control. It is important to identify major cost control items and to manage them for effective cost management in the high-rise building construction. This study proposes a method of identifying major cost-increasing factors in the high-rise building construction based on the Delphi method.

  • PDF

A Study on Strategies for Obtaining Certification in the Revised Assessment Standards on Intelligent Building Certification System - Focused on Assessment Standards for Office Building Projects - (국내 지능형건축물 인증제도 평가기준의 개정에 따른 인증전략에 관한 연구 - 업무시설 인증기준 중심으로 -)

  • Choi, Yeo-Jin;Lhee, Sang-Choon
    • KIEAE Journal
    • /
    • v.12 no.3
    • /
    • pp.77-82
    • /
    • 2012
  • With developments of architectural and information technologies at the knowledge-information oriented society in the 21st century, there are the needs on intelligent buildings equipped with advanced systems to integrate both technologies. The intelligent building means a smart building which provides comfortable environments, realizes fast and speed information and telecommunication network services, and maximizes work productivities by adopting various systems suitable to uses, sizes, and functions of buildings. In order to meet these needs of the times, the domestic intelligent building certification system has been enforced in 2006. Recently, the intelligent building certification system was newly revised for revitalizing the spread of intelligent buildings. Thus, this paper investigates rating criteria and assessment standards of the new certification system focused on office building projects and suggests strategies for obtaining certifications by analyzing cases which were certified on the previous version of the system.