• Title/Summary/Keyword: Building maintenance system

Search Result 637, Processing Time 0.031 seconds

The Standardized Methods for Improvement of Maintenance Deterioration caused by Fire damage (국제 표준화를 위한 화재이후의 유지관리 시스템 개발)

  • Kwon, Young-Jin;Koo, In-Hyuk;Kim, Dong-Eun;Seo, Dong-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.230-231
    • /
    • 2013
  • A fire outbreak in a reinforcement concrete structure looses the organism by different contraction and expansion of hardened cement pastes and aggregate, and causes cracks by thermal stress, leading to the deterioration of the durability. So, concrete reinforcement structure is damaged partial or whole structure system. Therefore accurate diagnosis of deterioration is needed based on mechanism of fire deterioration in general concrete structures. Fundamental information and data on the properties of concrete exposed to high temperature are necessary for accurate diagnosis of deterioration. In this study, consider case of investigation methods and repair work in fire damaged structure concrete.

  • PDF

The Standardized Methods for Improvement of Maintenance and Performance Construction of Deterioration caused by Fire damage (화재피해 콘크리트의 유지관리 및 시공성능 향상을 위한 표준화방안)

  • Seo, Dong-Goo;Kim, Dong-Eun;Kim, Bong-Chan;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.16-18
    • /
    • 2013
  • A fire outbreak in a reinforcement concrete structure looses the organism by different contraction and expansion of hardened cement pastes and aggregate, and causes cracks by thermal stress, leading to the deterioration of the durability. So, concrete reinforcement structure is damaged partial or whole structure system. Therefore accurate diagnosis of deterioration is needed based on mechanism of fire deterioration in general concrete structures. Fundamental information and data on the properties of concrete exposed to high temperature are necessary for accurate diagnosis of deterioration. In this study, consider case of investigation methods and repair work in fire damaged structure concrete.

  • PDF

Proposed Development and Evaluation System for Existing Standardized Waterproof Technology Assessment Methods(Production technology, maintenance evaluation) (표준화된 방수기술 평가기법 개발 및 평가체계 구축 (생산기술, 유지관리 평가 중심))

  • Song, Je-Young;Seo, Hyun-Jae;Choi, Eun-Kyu;Lee, Jung-Hun;Kim, Byoungil;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.235-236
    • /
    • 2019
  • Waterproofing materials and construction methods have been developed and applied to various construction sites since the past. However, there many cases where the waterproofing performance is not satisfactory, leading to continuous water leakage. It has been observed that a key reason for this is because waterproofing method and material selection is not optimized in terms of the appropriate application area and environmental degradation factors. This paper proposes that future selection of waterproofing methods should consider the following evaluation criteria; 1) waterproof performance evaluation according to site conditions, 2) evaluation of construction method, 3) manufacturing and maintenance of waterproofing systems.

  • PDF

Development on Repair and Reinforcement Cost Model for Bridge Life-Cycle Maintenance Cost Analysis (교량 유지관리비용 분석을 위한 대표 보수보강 비용모델 개발)

  • Sun, Jong-Wan;Lee, Dong-Yeol;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.128-134
    • /
    • 2016
  • Estimating the repair and reinforcement (R&R) costs for each bridge member is essential for managing the life cycle of a bridge using a bridge management system (BMS). Representative members of a bridge were defined in this study, and detailed and representative R&R methods for each one were drawn in order to develop a systematic maintenance cost model that is applicable to the BMS. The unit cost for each detailed R&R method was established using the standard of estimate and historical cost data, and a systematic procedure is presented using an integration program to enable easy renewal of the R&R unit cost. Also, the average unit cost of the representative R&R methods was calculated in the form of a weighted average by considering the unit cost and application frequency of each detained R&R method. The appropriateness of the drawn average unit cost was reviewed by comparing and verifying it with the previous historical unit cost. The suggested average R&R unit cost can be used to review the validity of the required budget or the appropriateness of the R&R performance cost in the stage to establish the bridge maintenance plan. The results of this study are expected to improve the reliability of maintenance cost information and the rationality of decision making.

Deterioration Evaluation for Industrial Pipeline by Sectionalizing (산업시설 배관의 섹션화에 의한 노후도 평가)

  • Min, Hyuk-Ki;Kim, Sang-Bum;Kim, Byung-Woo;Kim, Hyoung-Ki;Park, Yool
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.28 no.3
    • /
    • pp.123-130
    • /
    • 2016
  • This study introduced deterioration evaluation item and criteria that could be applied to industrial facilities with the most widely used carbon steel pipe installed for ordinary piping (KSD 3507). Experimental industrial pipes were evaluated with pipe sectionalizing method combined with the established evaluation item and criteria to measure and manage semi-continuously for overall piping system. After applying outcomes from this study to a plant of incineration facility, a 42% saving in repairing and remodeling cost was achieved.

History Management Technology of Building Construction and Maintenance Using Vector Photo Information and BIM (벡터사진 정보와 BIM을 활용한 건축물의 시공·유지관리 이력관리기술)

  • Kim, Kyoon-Tai;Lim, Myung-Gu;Kim, Gu-Taek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.605-613
    • /
    • 2014
  • Recently proposed intelligent images are generating, storing and managing along with existing image information and 5W1H information. Therefore, these vector images can be useful in searching and managing photos taking during building construction and maintenance processes. In addition, when the vector photos, a key to the intelligent image, is linked with BIM, it is possible to find BIM objects by utilizing information included in vector photos. And if the taken vector photo is saved as attributes of the extracted object, the vector photo can be managed as the historical data. Furthermore, this new technology will contribute to make the management of construction information more efficiently. This study is about the development of the technology of extracting BIM objects from vector photo information and managing the attributes of the extracted objects. Also the prototype modules was developed and tested to evaluate the processes of setting reference points, converting coordinate system, calculating positions, and so on. Through these processes, it was confirmed that the possibility of extracting BIM objects from vector photos and of managing attribute data of objects.

Emergency Scenarios of Rail-mounted Window Cleaning System (유리창 외부 부착형 청소장치의 비상상황 시나리오 도출)

  • Kim, Kyoon-Tai;Jun, Young-Hum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.244-245
    • /
    • 2019
  • Recently, a variety of window cleaning devices have been developed. There are, however, few cases of anticipated problems and countermeasures that may arise after these devices are installed. Therefore, in this study, the emergency condition was derived and the emergency scenario was derived for the rail-mounted cleaning device. Emergency scenarios and countermeasures derived from this study will be used for continuous improvement and supplementation of cleaning devices through prototyping and testing.

  • PDF

Prioritization of Anti-Icing Spray System for Active Snow-Removal Works (능동적 제설작업을 위한 염수분사장치 설치 우선순위 선정)

  • Yang, Choong Heon;Kim, In Su
    • International Journal of Highway Engineering
    • /
    • v.17 no.4
    • /
    • pp.99-105
    • /
    • 2015
  • PURPOSES: This study aims to establish the priority of introducing anti-icing spray system for regions of the National Highways in South Korea. Using this study, a logical plan for instituting such an anti-icing spray system can be established for the National Highways. METHODS : The Analytical Hierarchy Process (AHP) was employed to prioritize the implementation of an anti-icing spray system on Korean highways. For this purpose, an existing scoring table developed by the Ministry of Land, Infrastructure Transport Affair was slightly modified in order to reflect recent trends in winter maintenance. A survey was conducted to gather the preferences regarding the developed hierarchy of road experts and agencies. Finally, the final score was produced by integrating the scoring results with estimated weights for each evaluation criterion. RESULTS: In general, Honam and the metropolitan areas have relatively high priority while other areas such as Chungcheong, Young Nam, and Gang Won appear to be uniform in importance in terms of establishing an anti-icing spray system. This result may indicate that historical weather data and traffic volumes are significant factors in deciding in winter maintenance polices CONCLUSIONS : In this study, useful insights are suggested regarding winter maintenance by simultaneously performing rapid snow removal and proactive treatment. Issues of resource allocation may be potential research items in the field transportation engineering.

The Program Development for Building Pavement Maintenance and Rehabilitation System (포장도로 유지관리 시스템 구축을 위한 프로그램 개발)

  • 조병완;태기호;한재호;최혜미;권병철
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.1009-1014
    • /
    • 2002
  • In this study, developed economical and scientific Pavement Management System(PMS) that can produce suitable maintenance method through judgement and analysis of pavement condition exactly, to overcome past unscientific pavement management limitations. First, on the basis of data of the inside and outside of the country on PMS, composed logical algorithm such as pavement condition investigation and analysis, detailed naked eye investigation, whole system estimation etc., and it verified that this algorithm is suitable system through the inside and outside of the country PMS research examples and results of detailed naked eye investigation. Also, developed easily usable PMS program and PMS_GIS program with such logical algorithm.

  • PDF

Development of a tele-robotic system for steam generator maintenance works (원전 증기발생기 유지보수용 원격로봇 시스템 개발)

  • 황석용;김창회;김승호
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.1519-1522
    • /
    • 1996
  • In this paper, we have developed a tele-robotic system for nozzle dam installation/removal works and tube relating maintenance works inside unclear power plant steam generator. Developed tele-robotic system consists of many hardwares including robot and a control system. Based on the 3 dimensional graphic simulation, a 6 D.O.F. hydraulic actuated robot and a 2 D.O.F. robot install/removal device have been developed. And also we deviced special tools for nozzle dam carry and bolting. For the tele-robot and other devices to be controlled at the nonradioactive area outside reactor containment building, we developed a tele-robot control system consisting of supervisory controller and remote controller.

  • PDF