• Title/Summary/Keyword: Building completion

Search Result 246, Processing Time 0.025 seconds

Effects of Multifactorial and Follow-up Programs Applying a Capacity Building Strategy: Focusing on Older Adults Living in a Urban-rural Complex Area

  • Han, Song YI;Ko, Young;Kim, Hee Ryang;Kim, Jiyoun
    • Research in Community and Public Health Nursing
    • /
    • v.30 no.2
    • /
    • pp.243-255
    • /
    • 2019
  • Purpose: The purpose of this study is to examine effects of a multifactorial program for preventing the frailty of older adults and effects of a follow-up program applying a capacity building strategy. Methods: A quasi-experimental pretest-posttest design was used for the nonequivalent control group. The follow-up group (n=75) and non-follow-up group (n=68) received the same multifactorial program comprising muscle strength exercise, cognitive training, and psychosocial programs for 12 weeks. After completion of multifactorial program, the follow-up group took follow-up programs applying the capacity building strategy for following 12 weeks. The data of physical function, cognitive function, and psychological function, and self-rated health were collected from both groups three times: before intervention, after intervention, and 12 weeks after intervention. The data were analyzed using $x^2$ test and t-test. Results: In comparison with the non-follow-up group, the scores of Timed Up & Go Test, and physical activities energy expenditure were significantly improved in the follow-up group. Conclusion: These results indicate that a multifactorial program with follow-up adapting the strategies of capacity building for the older adults group is feasible to prevent the physical frailty in community.

Prevention through Design (PtD) of integrating accident precursors in BIM

  • Chang, Soowon;Oh, Heung Jin;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.94-102
    • /
    • 2022
  • Construction workers are engaged in many activities that may expose them to serious hazards, such as falling, unguarded machinery, or being struck by heavy construction equipment. Despite extensive research in building information modeling (BIM) for safety management, current approaches, detecting safety issues after design completion, may limit the opportunities to prevent predictable and potential accidents when decisions of building materials and systems are made. In this respect, this research proposes a proactive approach to detecting safety issues from the early design phase. This research aims to explore accident precursors and integrate them into BIM for tracking safety hazards during the design development process. Accident precursors can be identified from construction incident reports published by OSHA using a text mining technique. Through BIM-integrated accident precursors, construction safety hazards can be identified during the design phase. The results will contribute to supporting a successful transition from the design stage to the construction stage that considers a safe construction workplace. This will advance the body of knowledge about construction safety management by elucidating a hypothesis that safety hazards can be detected during the design phase involving decisions about materials, building elements, and equipment. In addition, the proactive approach will help the Architecture, Engineering and Construction (AEC) industry eliminate occupational safety hazards before near-miss situations appear on construction sites.

  • PDF

A Comparative Study on Evaluation Methods of Energy of Green Building Certification Criteria 2010 and LEED 2009 (국내 친환경건축물인증제도2010과 LEED2009에서의 에너지평가방법에 대한 비교 연구)

  • Hyun, Eun Mi;Kim, Yong Sik
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.39-47
    • /
    • 2012
  • Recently, the green building and energy connection system are establishing. But, National certification system for environment-Friendly Buildings is indicated hangup about energy efficiency of building. Commissioning, energy conservation, renewable energy, carbon dioxide emissions, it is determined that the energy associated with LEED and GBCC four items of the comparative analysis showed the following results. First, on the practical performance of the system after the completion of commissioning of the energy associated with the system completed until after the final performance for secure operation from the planning stage to verify and document systematically how to perform, but the domestic review and verification is incomplete. Second, the use of energy-saving and renewable energy is directly related to the energy consumption of the building, but GBCC the strengthening of standards on how to evaluate it is deemed necessary. Finally, the evaluation of the reduction of carbon dioxide emissions, LEED Unlike GBCC the life-cycle of the system without considering the global warming index only because a substantial step in the operating efficiency can not be assessed. Based on this study GBCC energy savings through efficiency to actively carry out research through a systematic analysis of the basic guidelines to proceed.

The analysis of defects types and patterns in high-rise residential buildings (초고층 주상복합 건물의 하자 발생 유형 및 분석 연구)

  • Seo, Jang-Woo;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.93-101
    • /
    • 2009
  • Recently, public interest in housing defects, such as construction errors, occupiers' complaints, faults in production, and so on, is increasing. In addition, the construction requirements of high-rise residential buildings have increased, due to the higher prices of urban areas, especially in metropolitan areas. While previous research has focused on the defects occurring in apartment housing complexes, research has not been carried out on the defects occurring in high-rise residential buildings. In this paper, the defects patterns and characteristics of high-rise residential buildings are examined and analyzed and a defect management plan is then suggested. In order to do this, we collected the defects data of high-rise residential buildings recorded by 2,299 of 2,327 occupants. The defect occurrence rate (DOR) in the residential area is 98.8%. The frequency rate of defect occurrence over the total defect occurrence since building completion is 63.28% during the first year, 24.63% (second year), 6.88% (third year), 2.27% (fourth year), and 2.53% (fifth year). The result of correlation analysis between work types showed that there is a relationship between the built-in furniture and electronics (F&E) and painting works, and the F&E and masonry works, such as marble finishing. We expect that this research will assist in the efforts to decrease the number of defects in high-rise buildings.

Preliminary Analysis on Artificial Intelligence-based Methodology for Selecting Repair and Rehabilitation Methods of Bridges (인공지능 기반의 교량 보수공법 선정 기술 개발을 위한 선행 분석)

  • Kim, Jonghyeob;Jung, In-Su;Yun, Won-Gun;Kim, Jung-Yeol;Park, In-Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.861-872
    • /
    • 2021
  • An efficient cost management is important for the domestic social overhead capital(SOC) based on a long lifecycle after 30 years since completion. Maintenance in South Korea have had the restrictions of consistency and suitability of decision-making by the establishment of a budget plan based on the company estimate and repair and reinforcement methods determined by the inspection and diagnosis engineers' subjective determination for each facility. To resolve this issue, the Korea Institute of Civil Engineering and Building Technology is currently in development of a methodology to propose an optimum maintenance method according to the damage of components by artificial intelligence. This study has deduced the primary factors by analyzing information generated during bridge maintenance and management as a prior step for the development of technologies, and conducted a preliminary analysis to select the optimum artificial intelligence technology.

ROBOTICS AND AUTOMATION IN CONSTRUCTION INDUSTRY

  • Younus Khan;G. Chandra Sekhar Reddy;V.S.S. Kumar
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.527-532
    • /
    • 2005
  • The construction industries are facing problems of productivity, quality of work, safety, and the completion of projects in time. In construction industry a worker is exposed to hazardous environment, and has to do more physical work, effecting his health and also productivity. The automation and robotics can offer solution to many problems of the industry. In the past the major barrier to construction automation is the lack of electronic components and systems. This is solved now with the development of information technology, and the current obstacle is the high cost of automated systems, shortage of public money for R&D, and problems of acceptance. The robots employed in construction have followed the same concept as those employed in manufacturing. However, construction industry requires a different kind of robot compared to manufacturing Industry. The robots are stationery and product moves along the assembly line in manufacturing sector, but construction robots have to move about the site because buildings are stationary and of large size. The construction robots must function in adverse weather conditions, including variation in humidity, and temperature and increase the overall construction productivity rate. The major objective of the paper is to review the existing applications of building robots and to assess their implementation in building industry. A case study is considered for the implementation of robots for the painting work of the University Building at Saifabad PG College of Science, Hyderabad, India.

  • PDF

Study on Mock-up Construction Example of Free-Form Building Facade using External UHPC Panels - Focused on the Construction of Busan Opera House - (UHPC 외장패널을 활용한 비정형건축물 외장패널의 목업 시공사례에 대한 연구 - 부산 오페라 하우스 신축 공사 -)

  • Kim, Tae-Ik;Yoon, Ju-Yong;Choi, Byung-Keol;Park, Yong-Kyu;Yoon, Gi-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.187-188
    • /
    • 2021
  • In the case of the Busan North Port, where the Busan Opera House is located, it is an environment exposed to various external deterioration factors such as frequent strong winds, seawater and salty winds, and an exterior material using UHPC (Ultra High Performance Concrete), a highly durable exterior material as a solution to this. Has been adopted. in this study, an economical production and construction direction was reviewed by applying UHPC to the exterior panels of atypical buildings that cannot cope with GFRC, metal, and glass, which are the main exterior finishing materials applied so far. When steel fibers are used, structural performance may be better than organic fibers, but due to environmental factors in Busan, corrosion due to exposure to steel fibers or problems with safety management after construction and completion may occur. Therefore, the site used the newly developed SACF fiber. Facade design of atypical buildings, which will increase in the future, is an important part, and the scope of use of UHPC panels is expected to increase in the future as design trends and demand for high durability increase.

  • PDF

A STUDY ON THE INTRODUCTION OF THE PAY ADJUSTMENT SYSTEM FOR THE VOLUNTARY ASSURANCE OF QUALITY BY THE CONTRACTORS

  • Byung-Ok Noh;Sang-Beom Lee;Jai-Dong Koo
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.521-525
    • /
    • 2011
  • Although the Korean construction industry has risen rapidly, the quality of the buildings is not met with the industry standard compared to the potential of the technology development and the cost of maintenance has been increased. The user's request for quality have been increased, but in the current building construction, the contractors only follow the specifications of design, material and technology, and their main concern is whether they are in right track with the specification or not. Thus, the necessity of developing technology has been ignored and sufficient opportunities for the development have not been provided as well. In the developed countries, in contrast, the quality assurance and the payment regulation system has been utilized for the active response to the changes of users' request. As a result of this, the maintenance cost has been decreased and the development of construction technology has been improved. Therefore the pay adjustment system is needed to create the improvement of the quality of the buildings by the contractors' earnest building construction. In order to introduce the pay adjustment system suitable to the Korean construction industry, this study presented the logical method of adjusting the construction cost and making payment with the pay adjustment index that is created based on the result of the performance test, after making a set of the indicators of the building performance standard and applied them to the targeted building.

  • PDF

A Study on the Ritual Ceremony and the Architectural Form of Hwaryeong-Jeon in the Joseon Dynasty (화령전의 제례의식과 건축특성에 관한 연구)

  • Kim, Dong-Uk;Cho, Ok-Yon;Jeong, Chun-Hwan
    • Journal of architectural history
    • /
    • v.14 no.1 s.41
    • /
    • pp.57-70
    • /
    • 2005
  • This study is the consideration about Hwaryeong-Jeon that enshrines Joseon Dynasty 22nd king Jeongjo's portrait of a king. Suwon's Hwaryeong-Jeon that accompanied a portrait and performed ritual ceremonies had several formalities and ceremonies which are connected with rituals. therefore, we will try to examine what relation between arrangement of building and plane composition had. And through this, it is thing to observe construction special quality that Hwaryeong-Jeon has. Joseon Dynasty's young-jeon (a hall where the royal portraits are kept) is retaining each other different state according to construction age every moment. Hwaryeong-Jeon among Joseon Dynasty's a hall of royal portraits is the construction form which is equiped well and is known for keeping the form well from the foundation to now And this building is evaluated as the standard form of early part young-jeon building of 19th century. Especially, Hwaryeong-Jeon shows the typical ritual equipments late Joseon Dynasty and at the same time has all kinds of characteristics which only we can find at Hwaryeong-Jeon. Namely, Hwaryeong-Jeon is the building which brings the design concept of the hall of royal portraits to completion as the building which enshrines single portrait of a king. After all, Hwaryeong-Jeon is evaluated as the building which can pass excellent form of late Joseon Dynasty, the hall of royal portraits building just as it is. Therefore, as I study its own style, I expect Joseon Dynasty's mind that enshrined the portrait of a king elaborately to be revealed.

  • PDF

A Study on a System of Resolving Claim according to the Delay of Construction Projects - Focus on Liquidated Damages - (공기지연에 따른 클레임 대응방안에 관한 연구 - 지체상금을 중심으로 -)

  • 이영민;이상범;김정길
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.111-116
    • /
    • 2002
  • The delay of the completion of the construction project occurs frequently because the origin schedule is affected by numerous factors that contribute to the overall delay in completing the project. But in our country. the dealing with a claim is not sufficient yet by reasons of fairl relation between owner and constructor, cognitive shortage in claim, and such. especially they have make a wrong application of baseless the rule. In this study. we make a rational model ; that includes calculating of dispute costs, and suggest the solution and the prevention for claim by considerating the law followed liquidated damages.

  • PDF