• 제목/요약/키워드: Building completion

Search Result 246, Processing Time 0.022 seconds

A Study on the Physical Properties of Insulation Materials according to the Period of Building Construction (건축물 준공년수 경과에 따른 단열재의 물성변화에 관한 연구)

  • Kim, Hyun-Jin;Choi, Se-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.92-93
    • /
    • 2018
  • This study analyzed the physical properties of insulation materials upon completion of building completion years and found the suitability of the current energy performance analysis methodology to apply the insulation specified in the design drawings to the same thermal conductivity values as the new materials.

  • PDF

Assesment of Indoor Radon Gas Concentration Change of College (대학의 실내 라돈가스 농도의 변화 평가)

  • Park, Hoon-Hee;Jeong, Euihwan;Kim, Hak-Jae;Lee, Juyoung;Lyu, Kwang Yeul
    • Journal of radiological science and technology
    • /
    • v.40 no.1
    • /
    • pp.127-134
    • /
    • 2017
  • The purpose of this study was to assess the impact by comparing the concentration of indoor radon and look for ways to lower the concentration of indoor radon gas measurements of three variables, the year of completion, volume of the building and ventilation. Measurement target is six classrooms on the sixth floor of building that was constructed in 1973 and was extended in 2011. Selected classroom's volume is different. Four classrooms were selected to compare the radon concentration in accordance with the year of completion, Classrooms that is same year of completion were selected to compare the radon concentration in accordance with the volume, six classroom was performed closure and ventilation to compare radon concentration according to ventilation. Radon concentrations in accordance with the year of building completion showed a high concentration of radon in a building recently built. Also, Radon concentration in volume is high the smaller the volume. Radon concentration change according to ventilation showed a reduction of about 80% when the ventilation than during closing. Especially, The radon concentrations were high detected while the recently year of building completion and the smaller volume. Ventilation of the three variables is considered that can be expected to exposure reduction effect by radon affecting the greatest radon concentration reduction.

An analysis of the utilization of defect deposits for apartment complexes

  • Seo, Deok-Seok;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.549-556
    • /
    • 2013
  • This study analyzed the actual use of defect deposits for financing long-term expenses (that is, expenses incurred within 4-10 years of building completion) and for financing short-term expenses (that is, expenses incurred within 3 years of building completion). Therefore, 36 cost data on the expenses financed out of defect deposits for apartment complexes were collected from construction companies and analyzed using statistical methods. The findings revealed that 62.6 percent of defect deposits were spent to resolve actual defects, and 37.4 percent were spent resolving resident complaints. Furthermore, these results are valid regardless of the location of the complexes. As such, these results could be of significance when establishing or revising regulations regarding the repair of the long-term defects of apartment complexes.

Reliability of Revenue Recognition by Percentage of Completion Method in Construction Industry - Empirical Analysis from Information Perspective (건설업의 공사진행기준에 의한 수익인식의 신뢰성 검증 - 정보적 측면에서의 실증분석)

  • Park, Hong-Jo;Ji, Hyun-Mi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.463-470
    • /
    • 2016
  • Construction companies calculate their revenues and costs from constructing activities using the 'Percentage of Completion Method', which is based on ratio of actual construction cost to total costs estimated. The reliability of the net profit of construction companies is being evaluated lower than other industries due to incorrect application of 'Percentage of Completion Method' to cover losses actually occurred. Therefore, the purpose of this study is to verify the quality of earnings calculated based on 'Percentage of Completion Method' in terms of information usefulness. Results from empirical analysis show that investors in stock market underestimate the value of the construction companies' earning information by applying 'Percentage of Completion Method' and not actively use in investment decision making. Accordingly, it has been confirmed that the association between income information and stock prices falling. These results suggest the need for strict supervision of the supervisory authorities and the practical application of 'Percentage of Completion Method' in reliability.

A Study of the DB Design Standard for Submitting Completion Drawings for Auto-Renewal of Underground Facility Information (지하시설물정보 자동갱신을 위한 준공도서 제출 표준DB 설계 연구)

  • Park, Dong Hyun;Jang, Yong Gu;Ryu, Ji Song
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.38 no.6
    • /
    • pp.681-688
    • /
    • 2020
  • The Under Space Integrated Map has been constructed consistently from '15 construction projects until the present time in an effort to implement the "ground sinking prevention method" for the purpose of strengthening underground safety management. The constructed Under Space Integrated Map is utilized to provide information to the person in charge at local government through application of the system of underground information based on the administrative network and to deliver this to specialized underground-safety-effects -evaluation organizations through map extraction based on a floor plan. It suffers from a limitation in its practical use, however, since information is only provided, without promoting a separate renewal project. Although in Section 1 of Article 42 in the Special Law Concerning Underground Safety Management the content pertaining to submission obligations of completion drawings related to underground information including change and renewal are stated explicitly in order to solve this problem, submission is not sufficient since a submission window based only on the administrative network is operated. Accordingly, the Ministry of Land, Infrastructure, and Transport constructed an online system for submitting completion drawings, in an attempt to change the method by which entities involved in underground development directly submitted completion drawings. In this study, a DB standard relating to submitting completion drawings was designed and applied in order to construct an auto-renewal system based on submitted completion drawings, which will be extended to cover the range to underground structures hereafter.

A Study on the Housing Development Building by User's Participation (사용자(使用者) 참여(參與)에 의한 주거단지(住居團地) 건축(建築)에 대(對)한 조사(調査) 연구(硏究))

  • Oh, Young-Sik;Choi, Hyo-Seung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.4 no.1
    • /
    • pp.37-44
    • /
    • 2002
  • There are some studies about user's participation to reflect their desire and value on the planning of house by this time. These were constitution of unit space focused on the apartments, which is mostly theoretical. However, till completion of a construction work, it goes through various processes of some steps such as, buying building site, site planning, architectural planning and construction. In architectural planning process, it takes time for continuous discussion and revision between architects and users. Also changes of plan must of necessity be so because of in or outside conditions. So, right user's participation has its meaning that they take part in each step and portion of process faithfully on whole architectural processes. In this case, tenants of single house were decided and they already buy building site and lay out rules jointly. With this circumstance I've researched a kind of test the reflection on various desires and its acceptance in each steps through completion of a construction work, which is based on their participation.

  • PDF

Problem of Guarantee System against Defect by Change Starting point of Defects Liability on the Management of Apartment Houses and Improvement (공동주택 하자담보책임 기산일 변화에 따른 하자보증제도의 문제점 및 개선방안)

  • Jeong, Yong-Ki;Lee, Tae-Hyeong;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.278-279
    • /
    • 2017
  • Result from Amendment of Apartment Houses Decree Customer Service, Recently, the starting point of Defects Liability changed "Criteria of Completion date" to "Delivery date to Divided property". Through the Law amended, There are some inconsistency between "Claim for repairing defects" and "Period of security deposit for repairing defects claim". If someone bought a house after Completion date, Purchasing period of "Claim to security deposit for repairing defects" lapsed without renewal. This research is to identify problems and solutions for improving the system.

  • PDF

Crashing Method for Repetitive Project hybridizing concurrent engineering and LOB (동시공학 및 LOB를 사용한 반복 프로젝트 공기단축 방법론)

  • Min, Gyu-Tae;Lee, Hong-Chu;Li, Xian-Jun;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.41-42
    • /
    • 2018
  • Various methods that crash the project completion time have been studied. Line-of-Balance (LOB) is well accepted as a useful method that enables steady resource utilization without frequent hire-and-fire of resources for a project having repetitive units. Existing studies involved in LOB-CPM focuses on thesis such as resource leveling and optimization in construction scheduling community. However, crashing methods are not arrived at a full maturity in LOB scheduling, because no one handles steady resource utilization while keeping activity-relationships. This paper proposes a method that crashes project completion time by hybridizing concurrent engineering and LOB scheduling without using additional resources.

  • PDF

Adjust timing of Construction Construction Evaluation (건설공사 시공평가 시기 조정)

  • Yoon, Ji-Ho;Nam, Keong-Woo;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.78-79
    • /
    • 2019
  • A construction project with a total construction cost of over 10 billion KRW should be evaluated whether construction works are appropriately executed. The evaluation is carried out on quality management, process management, construction management, safety management, environmental management. The implementation period is within 60 days after completion of construction of the construction, from the time when the construction rate of the construction work has progressed by more than 90% to the construction cost. However, the participating construction engineers should prepare the evaluation within the period according to the evaluation criteria, but there are difficulties in preparation for the evaluation due to the reasons such as the change of engineers in charge and loss of data. Therefore, this study proposes the procedure of construction evaluation and adjusts timing of construction evaluation.

  • PDF