A Study to keep the Concrete Quality when pouring concurrently the Concrete with Different Mixing Ratio - Based on Gunsan D Project (배합비가 상이한 콘크리트의 혼합 타설시 품질확보에 관한 연구 -군산 D PROJECT를 중심으로-)

  • Kim, Kyung-Hoon;Lee, Sang-Hak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.82-83
    • /
    • 2017
  • The samll-medium sized cities do not have enough infrastructure for the construction work, especially in terms of concrete supply. This research surveyed the capacity of remicon companies in Gunsan related with production and delivery. Their production capacity is bigger than the daily quantity required, however the delivery capacity is not enough to supply the daily quantity required and it is inevitable to use the several remicon using different admixture. It might cause the harm to the structure. This research studied the way to remove the quality risk when using different admixture at the same time.

  • PDF

A study on Safety Keywords that Construction Project Managers Should Know (건설사업관리기술자가 알아야 할 안전키워드에 관한 연구)

  • Kim, Sang-Won;Choi, Yu-Jin;Hong, Seong-Wook;Ahn, Tae-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.95-96
    • /
    • 2017
  • A total of eleven keywords for construction project management engineers to know about safety are as follows. Before the construction, there are two keywords as the safety organization plan and safety management plan, safety compliance, document beach, safety check, safety management fee, hazardous risk prevention plan, safety education, safety accident, seven keywords, There are two keywords of safety inspection comprehensive report, safety management document. It is necessary to understand the keywords well in accordance with the relevant time and to do the best in safety work, and it should be recognized that safety inspection is carried out every month and the safety work should be done faithfully.

  • PDF

Application of shrinkage-reduced concrete to mitigate cracks of slab in parking garages (지하주차장 슬래브 균열저감을 위한 수축저감 콘크리트 현장적용 사례)

  • Seo, Jong-Hae;Lee, Jung-Ho;Lee, Kyu-sik;Jeon, Byong-kap;Kim, Jun-Sam;Lee, Hoi-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.197-200
    • /
    • 2012
  • Concrete has cracks from shrinkage that necessarily result from in hardening process. Shrinkage-reduced concrete developed for crack reduction was utilized at a sample construction project. As a result, it is confirmed that crack initation ratio was remarkably reduced when compared to the case of normal concrete utilization. Additional sample project is supposed to use delay joints as well as srinkage-reduced concrete. Subsequently, the result will be reported. The greatest factor which affects in drying shrinkage is unit quantity of water. However, there are a lot off difficulties in field supervision because proper measuring means is not presented in present standard. Therfore, problems depending on ready-mixed concrete concrete companies should be improved by preparing the related standard assoon as possible.

  • PDF

Analysis of Essential Function of Composite Sensor for the Ground Work of a Large Construction Project (대형 건설프로젝트 현장관리를 위한 복합센서의 필수기능 분석)

  • Cho, Nam-Seok;Kim, Chang-Won;Cho, Dae-Gu;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.39-40
    • /
    • 2012
  • Construction IT convergency proposes advanced management abilities of a construction project. Sensing data provided by various sensor technologies can be utilized for diverse management areas. This study analyzes required functions of sensors for implementing time, cost, safety and quality management, focusing on the ground works including excavation, pipe installation, retaining wall etc. Therefore, this study first generates essential management areas, analyzes cutting-edge sensor technologies appropriated for the areas, and finally proposes a matrix system that represents relationships between the management areas and sensor technologies, The proposed system is expected to reinforce construction management abilities by integrating sensor technologies.

  • PDF

A study of the Japanese Construction Policy Evaluation System (일본의 건설정책 평가제도 고찰)

  • Lee, Young-Ho;Lee, Kyo-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.185-188
    • /
    • 2012
  • As a separate project unit, the domestic construction policy evaluation is independently evaluated and managed by different involvements, so that it has been difficult to have a consistent policy evaluation to be performed. In this paper, thus, it is aimed to give an overview of the evaluation system and issues of domestic construction policy and suggest strategies of a improved evaluation system by a comprehensive benchmarking of construction policy evaluation system of Japan. The implications of this paper will serve a basis of improvement of a better construction policy evaluation system in Korea.

  • PDF

A Basic Study on the Evaluation Method for the Selection of Construction Responsible CM Operators in Korea (국내 공공부문 시공책임형 CM 사업자 선정을 위한 평가방식에 관한 기초연구)

  • Park, Bo-Sung;Lee, Tae-Hyeong;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.298-299
    • /
    • 2018
  • The construction liability type CM has been introduced in the form of a pilot project through public institutions since 2017 since it was introduced in the term of construction responsibility type construction project management in the Basic Law of Construction Industry in 2011 with the aim of improving the constitution of the Korean construction industry and strengthening global competitiveness. Through the introduction of construction-responsible CM, the government intends to change the paradigm of the overall construction industry, including design and construction, construction costs, disputes between stakeholders, and transparency of business. In this regard, the study aims to compare and analyze the evaluation methods on the bidding guide that public institutions (LH) are currently using to select companies in order to lay the foundations for successful construction of construction-responsible CM ordering methods.

  • PDF

Knowledge Structure for Cost Estimates Based on Standardized Cost Database (원가산정을 위한 표준분류체계 활용한 지식체계 개발)

  • Im, Haekyung;Kang, Namhee;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.

  • PDF

Analysis on the Construction Cost of Steel Truss Stadium (철골 트러스 스타디움 구조물의 공사비 분석)

  • Jang, Myung-Ho;Sur, Sam-Yeol
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.2 s.24
    • /
    • pp.75-82
    • /
    • 2007
  • Building costs means capital costs which include cost of land, cost of acquiring and preparing the site, construction costs, engineering fees, furnishings, cost of financing the project, and cost of management required to run and maintenance the building for use. An economic analysis is one of the most important factor to determine the project feasibility. The purpose of the this study is to analysis on the construction cost structure of steel truss stadium.

  • PDF

Implementation scheme for the efficient building of Distribution Facilities Information Management and Operation using GIS (GIS기술을 이용한 배전설비관리 및 운영의 효율적인 추진방안)

  • Kwon, O-Hyung;Moon, Soo-Deog;Kim, Jeong-Gu
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1131-1133
    • /
    • 1998
  • Distribution facilities are installed dispersedly nationwide and in view of huge amounts. it makes it difficult to manage and update distribution facilities information manually. Consequently, much efforts have been exerted on computerization of distribution facilities information. KEPCO has been building distribution facilities information system using GIS technology(DGIS) to manage distribution facilities. In order to implement DGIS, digitizing the existing cartographical and land registration map is essential. In this regard, the Government is pursuing the NGIS project. In parrallel with it, DGIS project will be accelerated in the future. This paper suggests the efficient development plans to computerize distribution facilities using GIS technology.

  • PDF

Quantifying the Value of Floats (작업여유시간의 가치 정량화 방법론)

  • Park, Young-Jun;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.123-124
    • /
    • 2015
  • The project participants make use of floats for their benefits. The owner may consume floats in an event of issuing change order(s) and may avoid the risk factors attributed by them; the contractor may reduce activities' costs by substituting the activity with alternative construction method and by leveling the resources, hence consuming floats. There are a lot of disputes and claims involved in the float ownership issue. The ownership of floats should be stipulated in the contract stage. To alleviate these disputes and claims, it is commendable to develop a computational method that quantifies the float value. This paper presents the method that computes the values of total floats which changes over the project life span. The system calculates CPM, compute the ratio of area of banana curve which is enclosed by earliest start curve and latest start-curve.

  • PDF