• Title/Summary/Keyword: Building Project

Search Result 2,556, Processing Time 0.061 seconds

Correlation Analysis between Job Stress and Job Satisfaction of Building Construction Field Managers

  • An, Sung-Hoon;Zhang, Zhen;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.474-481
    • /
    • 2013
  • The success of a construction project hinges on the effective and efficient management of human resources. The stress of human resources is directly related with work performance, and as such, should be managed to improve work performance. This study examined the correlation between job stress and job satisfaction among building construction project managers. A questionnaire to measure work performance was created by referring to the Korean Occupational Stress Questionnaire Short Form developed by the Korean Occupational Safety & Health Agency, as well as a previous study. The mean job satisfaction score of field managers was 3.6, which suggests that they are generally satisfied in their current job environment. A Pearson's correlation analysis showed that the field managers that were satisfied with their job had less job stress. These results could be used for the effective management of construction site managers and to improve their job performance in the field.

A Case Study On The Core Construction Method Applied to the Kolon Tripolis Project (코오롱 트리폴리스 코아 선행공법 시공사례 분석)

  • 이성진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.13-20
    • /
    • 2002
  • Recently, as the tripolis where the construction of the high-rising building is actively advanced domestic, it will be able to resist in the various horizontal load with the resistance system against hereupon to arrange R.C wall in Core Portion in order, like this building the core construction must preceding from the steel structure and it will reduce using of steel frame amount and it will be able to reduce a whole construction cost with a horizontal resistance ability from the report which provides a reference data to the similar project after to analyze the application of the mivan formwork system which relates in Tripolis.

  • PDF

A Preliminary Study of the evaluating and improving WLCM for construction project based on BIM (BIM기반 프로젝트의 WLCM (Whole Life-Cycle Management) 적용모델 개발을 위한 기초연구)

  • Lee, Geun-Ho;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.13-14
    • /
    • 2011
  • The main purpose of this research is to propose standardization of construction components design with BIM and to develop WLCM Framework and Application System for supply chain management on interaction of stakeholders based on proposed standard component. To accomplish main purpose of this research, we planned three years period, in first year, we will develop model for building lifecycle based on BIM, and this model can give the chance of collaboration with stakeholders of building project. In second year, we will develop WLCM system with model, and to improve performance of application model/system. This study can contribute on reduction of whole lifecycle cost, with preventing omission of factors on cost reduction possibility, develop concurrent engineering framework for construction stakeholders with proposed BIM.

  • PDF

Critical Management Factor of Elemental Techniques for Construction Automation System in High-Rise Building (고층건물 적용을 위한 시공자동화시스템 요소기술의 중점 관리사항 도출)

  • Cho, Nam-Seok;Kim, Chang-Won;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.15-16
    • /
    • 2011
  • Construction automation and robotics are being taken notice as an alternative to improve productivity and quality. Reflecting on these purpose, automation system, called RCA(Robotic-crane based Construction Automation) system, is developed and have been verified through a pilot project recently in Korea. To apply the RCA system in high-rise building effectively, each management factors of element technologies in the system is derived and assessed critical factor. The purpose of this study, management factors of element techniques, consisted of RCA system, is classified through questionnaires/interviews targeting system developers and construction managers in pilot project site, and critical factors is selected using AHP.

  • PDF

The Assurance of Quality by Contractors in Korea Construction Project (국내 건설 프로젝트에서의 수급자 중심의 품질확보방안)

  • Cha, Sang-Ho;Koo, Jai-Dong;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.71-72
    • /
    • 2011
  • The construction industry in Korea has seen significant improvements in quality management techniques, driven by the dramatic development of new technology through enlargements, but compared with technical development, the level of building quality improvement is still lagging behind. Therefore, in this study, a work process and system improvement plan for payment regulations is proposed, with which contractors can secure quality voluntarily in the building construction project.

  • PDF

An Analysis on Relations between Design Errors Detected during BIM-based Design Validation and the Impacts Using Logistic Regression (로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.264-265
    • /
    • 2017
  • This paper aims to analyze relations between design errors prevented by building information modeling (BIM)-based design validation and their impacts in order to identify critical consideration factors for successfully implementing BIM-based design validation in the architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to its causes and work types. The relations between causes and work types of design errors and project delay, cost overrun, low quality, and rework generation that can be caused by the errors are analyzed through conducting logistic regression. Characteristics of each design error are analyzed by conducting face-to-face interviews with practitioners in the two BIM-based projects. As the results, the impacts of design error causes on predicting project delay, cost overrun, low quality, and rework generation were the highest.

  • PDF

Design Alternative Assessment Method using Discrete Event Simulation and Building Information Model (이산사건 시뮬레이션과 BIM을 활용한 설계대안 평가에 관한 연구)

  • Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.158-159
    • /
    • 2016
  • Construction project consists of several stages such as planning, design, construction, operation/maintain, etc. Decisions made in the planning and design stage have a significant impact on the construction and operation/maintain stages. Identifying key resources contributing to duration and cost of design alternatives is an important measure to achieve effective coordination between design and construction. This study proposes a method which finds an optimal design alternative by taking into account of resource planning, expected duration, and cost in construction stage. Base on literature review relative to the assessment of design alternatives, a method which predicts required resources, duration, and cost of the design alternative is established. Then, a method that identifies an optimal design alternative based on the preference of a certain project criteria is developed. Finally, a case study is presented.

  • PDF

A Basic Study for Building VET/CM Leading Construction VE Process (VET/CM 주도형 시공VE 프로세스 구축을 위한 기초연구)

  • Song, Hyun-Jang;Cha, Yong-Woon;Lee, Hyun-Jong;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.233-234
    • /
    • 2016
  • Design phase VE that is mandatory conducted in public construction project more than 10 billion won in accordance with the relevant laws and regulations has been activated in domestic application case of Value Engineering. But construction VE has been applied in specific project. Therefore, this study aims to deduce problems of poor performed construction VE through review of precedent researches and depth interviews of expert group. As one of the improvements this study suggest that a building plan which is VE process leading VET/CM.

  • PDF

W350 - The Roadmap Of Super High-Rise Timber Building -

  • Harada, Hiroaki;Fukushima, Takashi;Hatori, Tatsuya;Aoyagi, Hajime
    • International Journal of High-Rise Buildings
    • /
    • v.9 no.3
    • /
    • pp.255-260
    • /
    • 2020
  • This research and technology development project is based on the concept and plan of Sumitomo Forestry Co., Ltd., and designed by Nikken Sekkei Ltd., and is aiming to realize 350 m supertall timber-framed buildings in urban areas by 2041, the 350 year anniversary of Sumitomo Forestry's founding(Fig. 1). By constructing office-based multi-use buildings which have 70 stories above ground with GFA of 455,000 ㎡, using a huge amount of timber of 185,000 ㎥, this project envisions to connect forests and cities, and to solve the problems in both of forests and cities. At the present stage, the main objective is to identify the issues related to wood, such as building structural systems, construction methods, materials used, and resource development, and to create a roadmap for future technologies to be researched and developed.

STUDY ON LCC ANALYSIS OF BUILDING ACCORDING TO STRUCTURES - FOCUSING ON MILITARY ESTABLISHMENTS -

  • Hyo-Joong Kim;Jung-Whan Oh ;Min Yu ;Mi-Hye Lee ;Young-Dong Yu ;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1187-1192
    • /
    • 2005
  • Approximately 25% of military establishments became superannuated to unable perform their function, and it influences on the environment by construction wastes and the waste of national budget, as there is no rational and objective standard even though old facilities have been replaced through modernization project. Therefore, it has been searched to introduce industrial building system that can cope with the new building-construction and transference for the improvement of existing military establishments. However, as there is no economical estimation standard for practical use, industrial building-construction is still remaining at the initial stage, and the study is insufficient too. So. in this study, I would like to develope LCC cost model for rational LCC comparative analysis between industrial construction system (Modular) and existing reinforced concrete structure and cage, and to evaluate economical efficiency through case analysis.

  • PDF