Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

  • Kim, JongHoon;Cohen, Fernando Castillo
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.47-52
    • /
    • 2015
  • This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.

A Case Study on Design of Educational Facility Appling BIM(Building Information Model) based Collaboration Process (BIM(Building Information Model) 기반의 협업프로세스를 적용한 교육시설 설계에 관한 사례연구)

  • Lee, Sang-Heon;Jang, Won-Jun;Jun, Han-Jong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.15 no.6
    • /
    • pp.39-46
    • /
    • 2008
  • The main purpose of this study is to find out the strengths and weaknesses of the application of BIM to the educational facilities. All the data information is drawn from the integrated design process which links various fields such as energy simulation, structure analyzation, and etc, and it is applied to the project combined as one data set. Moreover, we analyze the possible problems of the data exchange that can happen as collaborating with various fields while working on the project, and we present its solutions and the futher studies on this matter of a project.

Ontology-based Facility Maintenance Information Integration Model using IFC-based BIM data

  • Kim, Karam;Yu, Jungho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.280-283
    • /
    • 2015
  • Many construction projects have used the building information modeling (BIM) extensively considering data interoperability throughout the projects' lifecycles. However, the current approach, which is to collect the data required to support facility maintenance system (FMS) has a significant shortcoming in that there are various individual pieces of information to represent the performance of the facility and the condition of each of the elements of the facility. Since a heterogeneous external database could be used to manage a construction project, all of the conditions related to the building cannot be included in an integrated BIM-based building model for data exchange. In this paper, we proposed an ontology-based facility maintenance information model to integrate multiple, related pieces of information on the construction project using industry foundation classesbased (IFC-based) BIM data. The proposed process will enable the engineers who are responsible for facility management to use a BIM-based model directly in the FMS-based work process without having to do additional data input. The proposed process can help ensure that the management of FMS information is more accurate and reliable.

  • PDF

Government's Roles in Public Private Partnership Toll Road Projects

  • Rohman, Mohammad Arif;Doloi, Hemanta;Heywood, Christopher
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.381-385
    • /
    • 2015
  • This research aims to investigate critical factors of the government's role in achieving success in Public Private Partnership (PPP) toll road projects in Indonesia according to government and private sectors' perceptions. A preliminary interview Subsequently a questionnaire survey was also conducted involving 143 respondents across the two sectors from eight operating toll were five critical factors of the government's roles in achieving success in PPP toll road projects, namely; "Active involvement in overall project stage activities", "Establishment of good bureaucracy", "Provision of conducive environment", "Appropriate project planning and competitive tendering" and "Provision of appropriate government support and supervision". This research finding is expected to assist the government in defining clear roles and underlying responsibilities in development of PPP toll roads in Indonesia.

  • PDF

READINESS OF NIGERIAN BUILDING DESIGN FIRMS TO ADOPT BUILDING INFORMATION MODELLING (BIM) TECHNOLOGIES

  • Mu'awiya Abubakar;Yahaya Makarfi Ibrahim;Kabir Bala
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.640-647
    • /
    • 2013
  • Building Information Modelling (BIM) has become the new international benchmark for efficiency in design, construction and maintenance of buildings. It is the platform that brings about collaboration between project stakeholders and improvement of project outcomes. With all its potentials, not much of the impact of BIM technologies has been felt in the Nigerian construction industry. This research aimed at assessing the readiness of the Nigerian building design firms to adopt BIM technologies. The research was exploratory in nature. A field survey was conducted with the use of structured questionnaire, self administered to a sample of building design consultancy firms (architectural, structural, M&E, quantity surveying, and multi-disciplinary design firms) within Abuja and Kaduna. The questionnaire sought the perception of the responding firms on the factors affecting BIM adoption in the Nigerian construction industry, and their level of readiness to adopt BIM technologies in their practices based on the four categories of readiness-management, people, process and technology. 42.26% response rate was achieved and used for analysis. ANOVA and DUNCAN post-hoc tests were used to establish the differences between the responses of the groups of firms, while means and standard deviations were obtained to establish the important factors affecting BIM adoption in Nigeria. The survey revealed that all the groups of Nigerian design firms are appreciably ready for the adoption of BIM technologies in their practice, with slight variations in their respective levels of readiness. 'Lack of awareness of BIM technology among professionals' and clients and 'lack of knowledgeable and experienced partners' were identified as the most important barriers of BIM adoption in Nigeria; while the most significant drivers are 'availability of well trained professionals' and 'cooperation and commitment of professional bodies to the adoption'. Education and training of building design professionals and cooperation of all stakeholders in the design and construction supply chain were recommended as part of measures to ensure successful adoption of BIM in the Nigerian construction industry.

  • PDF

Establishing Risk Management Process for Improved Business Value of a Multi-Purpose Building Project (복합 시설 프로젝트의 사업 가치 향상을 위한 리스크 관리 프로세스 구축 방안)

  • Lee, Jong-Sik;Cho, Seung-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.64-71
    • /
    • 2018
  • Project Management Institute of America separates the types of risk with external risks and internal risks. The external risk is an uncontrollable risk in projects such as changes of policy and related systems, climate, natural disasters, exchange rates and so on. The internal risk is an existing risk in the project itself that is controllable items in the project. Technical risks in project management are cost, quality, time, safety and environment. Therefore, both the external and internal risks should be managed to perform the construction project successfully. In particular, we can secure the quality and safety of facilities through the technical risk management. The importance of potential risk management has been emerging as a major interest and the lack of risk management delays projects and increases construction costs with negative effects of the building safety since the complex building, which is composed of a great number of facilities, consists of many project units and there are conflicts between various participants and stake-holders. This study presents the ways of establishing risk management processes to ensure the safety of the complex building. To that end, establishing procedure of risk management processes is presented and types of risk and factors in construction projects and counter strategies are presented as available risk information on the stages.

Selection Method of Alternatives for Considering Correlation between Component Elements in Remodeling Design Process (리모델링 설계단계에서 부위구성요소의 상관관계를 고려한 대안선정 방법)

  • Park Chan-Gil;Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.53-61
    • /
    • 2004
  • As remodeling project is progressed in the constraint which is utilization of existing resource, the subject of remodeling and extend of construction are affected by the correlation between building element. Therefore, this research analyze the correlation between component of building element in the design phase and proposed the diagram model for correlation between building element and proposed selection method of alternative plan for optimized combination of building element in remodeling project.

A Study on the Expression Level of BIM Model for utilizing in Construction Phase (시공단계 활용을 위한 BIM모델의 표현수준에 관한 연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.253-254
    • /
    • 2016
  • In the trend of building enlargement, high-rise and irregular shaped building, domestic application of BIM in construction phase is increasing in recent years. BIM that is based on a three-dimensional, requires a specific building expression. Model expression level required for each phase such as design, construction, and maintenance of the construction project can be different. BIM model to apply in practice is difficult because it is not clear to set up the criteria for the expression level of construction BIM model. And it has a limit that is lower productivity in construction project. Therefore, this study considers the way of the improvement and analyzes the application for representation level of construction BIM model through the survey. By analyzing of the survey results, this study will be to present a basis for an appropriate expression level setting of construction BIM model.

  • PDF

APPLICATION OF SPACE SYNTAX FOR PARTITION SEQUENCING OF WORKING SPACE IN BUILDING CONSTRUCTION

  • Li-Wen Wu;Sy-Jye Guo
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.573-582
    • /
    • 2007
  • Working spaces in the construction site are much more complicated than completed spaces in the building. There are many researches focus on partition of building spaces. However, few discussed partition sequencing in building construction sites. Space syntax is a set of techniques for analyzing spatial configurations. It has become a useful tool in a variety of researches. Partition sequencing of working spaces should be related to the working direction. However, with convex space and axial line, the partition sequencing became unrelated to the working direction. When critical space is blocked, the partition sequencing with axial line will be changed. It is significant to reveal the impact of the entire spatial structure when some of the working spaces are blocked. This paper discussed the improved partition sequencing theory and highlighted the importance of critical space and analyzed the spatial structure of working space. A real case project was demonstrated in this paper.

  • PDF