• 제목/요약/키워드: Building Project

검색결과 2,456건 처리시간 0.026초

국내 대학의 BIM 기반 IPD 교육 현황 분석에 관한 연구 (An Analysis of IPD Education Based on BIM in a Korean Universities)

  • 함미화;손정욱
    • 한국BIM학회 논문집
    • /
    • 제5권3호
    • /
    • pp.11-18
    • /
    • 2015
  • Integrated Project Delivery (IPD) is a new trend in the building industry and a key feature of IPD is the use of BIM to support project collaboration. Therefore, engineers should learn the use of BIM and IPD in the construction industry. In this study, the authors draw necessary components for developing an IPD course curriculum through analyzing a project case and current courses provided by universities in Korea. The authors make several suggestions for effective IPD education in universities.

PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구 (A Basic Study on the Improvement of PC Project Management System Process)

  • 김창훈;안용한
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF

건설프로젝트 하도급 입찰금액 상승요인을 고려한 리스크인자의 중요도에 관한 분석 (An Analysis on the Importance of the Risk Factors Considering the Reasons for the Increase of the Subcontract Construction Project Bid Cost)

  • 이성구;신현인
    • 한국건축시공학회지
    • /
    • 제7권1호
    • /
    • pp.63-70
    • /
    • 2007
  • The aims of this study are to draw the project risk factors by grasping the relation especially between the construction preparation cost calculation and the project risk factors in the project's bidding stage, and to draw the cost estimate based on the risk when the orderer or the constructer performs the project and the main factors in calculating the most suitable construction cost by clarifying the understanding degree of the influence between the risk factors and the construction cost. In addition, this study can give a help to the proper decision -making through the prediction of the construction preparation cost, and this study is expected to give the basic data in developing the assessment tool for the most suitable construction cost of the project.

식스시그마 프로젝트 만족도 측정과 실증적 분석 (Measurement of Satisfaction and Empirical Analysis in Six Sigma Project)

  • 이도경;이명호
    • 산업경영시스템학회지
    • /
    • 제33권4호
    • /
    • pp.193-200
    • /
    • 2010
  • In this study, we took the census of the project satisfaction level of the employees who have participated in Six Sigma projects. We divided and measured the project satisfaction by the steps of performing the project (team building, execution, ownership and support step). We performed the analysis of variance to show the main factors of project satisfaction level, and the tests of homogeneity to know the relationship the business parts and among the job positions each. The results of analysis showed that the satisfactions of the team building and execution step were significant.

Real-time Impact Evaluation of a Capacity-Building Health Project in Lao PDR

  • LEE, KYE WOO;KIM, TAEJONG
    • KDI Journal of Economic Policy
    • /
    • 제37권4호
    • /
    • pp.75-88
    • /
    • 2015
  • This study presents a real-time impact evaluation of a human capacity-building health project in Laos, financed by a Korean aid agency and executed jointly by Laotian and Korean higher educational agencies. The project aims to improve the health status of Laotians by enhancing practicing doctors' clinical performance capacity, to be attained by advancing academic achievement at the University of Health Sciences (UHS) in Laos. Therefore, this real-time impact evaluation adopted the difference-in-differences regression analysis method, showing that the project improved the academic achievement of the UHS students who were taught by the project fellowship awardees more, compared to the UHS students who were taught by non-fellowship faculty members. It remains to be evaluated whether these UHS students taught by the project fellowship recipients would also perform better clinically in public hospitals in the future.

  • PDF

한국형 PDRI(Project Definition Rating Index)기법 개발 방향 (A Study on the Direction for Developing the Korean PDRI(Project Definition Rating Index))

  • 홍심희;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.168-169
    • /
    • 2016
  • Risk management at an early stage of projects is known as an effective method expected various benefits. The PDRI(Project Definition Rating Index) by the CII(Construction Industry Institute) is defined project scope for reducing risks. In addition, the PDRI is one of the verified methods for achieving benefits by a risk management. The literature review in Korea about risk management is all about focusing on construction works and the construction phase. Thus, we need to extend the perspective of a project management such as the PDRI. To develop the Korean PDRI, However, we have to consider Korean situations. Therefore, in this study, we analyze some previous studies of PDRI' indexes and its using methods, and suggest the new direction for using PDRI in Korea. This method will enable to improve the scoring method of a project management with PDRI in Korea.

  • PDF

사례연구 분석을 통한 발주방식별 성과비교 (Project Performance Comparison Based on Different Types of Project Delivery System)

  • 이수경;정영수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.207-209
    • /
    • 2011
  • Numerous reports show that alternative project delivery systems (PDSs) such as design-build (DB), construction management at risk (CMR), and design-build-maintain (DBM) are increasingly used in many countries. This study compared characteristics of each PDS (design-bid-build (DBB), DB, CMR, or DBM) by analyzing quantitative data from 9 research articles. In order to compare characteristics between DBB and alternative PDSs, the study is based on principal 3 factors - Time, Cost, and Quality. DB shows the best performance in the time part and also the cost performance depending on facility type and project size. The performance of quality has minor difference among different PDSs. These results support the fact that using an appropriate PDS by the characteristic of a project makes high value of efficiency and productivity.

  • PDF

리스크관리에 의한 건설안전관리의 분석 및 발전방안 (Improvement Plan and Analysis of Construction Safety Management for Risk Management)

  • 정병화;김성득
    • 한국건축시공학회지
    • /
    • 제6권4호
    • /
    • pp.53-60
    • /
    • 2006
  • Quality control and safety represent increasingly important concerns for project managers. In the worst case, failures may cause personal injuries or fatalities. Accidents during the construction process can similarly result in personal injuries and large costs. We present the results of a study designed to identify the tools that are most widely used and those that are associated with successful project management in general, and with effective project risk management in particular. The study is based on a questionnaire administered to a sample of project managers from construction enterprises. The response data was analyzed in order to find which tools are more likely to be used in the those organizations that report better project management performance and in those that value the contribution of risk management processes.

CNC T-BAR 형상제어 시스템을 활용한 비정형 건축물의 곡면 파사드의 시공사례 검토 (Review of Freeform Buildings using CNC T-BAR System)

  • 김성진;박영미;박정준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.58-59
    • /
    • 2017
  • Through the case study, we surveyed the performance of a CNC-T BAR system on irregular-shaped building construction project. By CNC T-BAR system, we mean a surface curvature control system has been used in aircraft and ship manufacturing by controlling entire surface points on shape. For the past 10 year, the number of irregularly-shaped building design and construction project has been increased, and also the studies on irregular-shaped construction methods have been conducted. However, the previous studies did not review on the performance of the CNC T-BAR system. We collected construction-completed cases in Korea, which applied the CNC T-BAR system, and we studied its performance by comparing with a segment system in terms of construction duration and its quality. The result shows that the CNC T-BAR system can shorten the construction duration comparing with segment-assembly system while maintaining high quality. The CNC T-BAR system is expected to apply on the more number of irregularly-shape building construction project.

  • PDF

건설현장 RTLS 활용을 위한 전파의 벽체 투과손실에 관한 실험적 연구 (Experimental Study on Wall Transmission Loss of Electric wave for the RTLS Application of Building Construction Project)

  • 이종국;이영훈;박정현;손민지
    • 한국건축시공학회지
    • /
    • 제9권1호
    • /
    • pp.95-101
    • /
    • 2009
  • Although the concept of RTLS is very unfamiliar to construction industry, recently it is popular in other industry, such as logistics, ship building, mobile telecommunication based on state-of-the-art information technology. Effective resource management using cutting-edge information technology makes it possible to succeed a project with saving the time and cost. And effective information management in construction project can be achieved by the new technologies such as RFID, WEB-based internet, DB technology, real-time monitoring technology, etc. This paper suggest the characteristics and applicability of the international standard electric waves to be used for the real-time locating system (RTLS) on the viewpoint of transmission loss in construction field to monitor and manage resources of construction project effectively The two types of electric waves based on the international standard is to be suggested after surveying the as-is technology in the related industries and then is analyzed to find out the characteristics of those by the concept of the electric wave transition loss in the several construction situations. Two main electric waves, the 2.4GHz and the 433MHz technologies as the international standard is researched on the applicability to the indoor environment of construction site.