• Title/Summary/Keyword: Building Maintenance

Search Result 1,534, Processing Time 0.024 seconds

Estimation Model of the Carbon Dioxide Emission in the Apartment Housing During the Maintenance period (공동주택 사용부문의 이산화탄소 배출량 추정모델 연구)

  • Lee, Kang-Hee;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.8 no.4
    • /
    • pp.19-27
    • /
    • 2008
  • The carbon dioxide is brought from the energy consumption and regarded as a criteria material to estimate the Global Warming Potential. Building shares about 30% in national energy consumption and affects to environment as much as the energy consumption. But there is not enough data to forecast the amount of the carbon dioxide during the maintenance stage. Various factors are related with the energy consumption and carbon dioxide emission such as the physical area, the building exterior area, the maintenance type and location. Among these factors, the building carbon-dioxide emission can be estimated by the overall building characteristics such as the maintenance area, the number of household, the heating type, etc., The physical amount such as the thickness of the insulation and window infiltration could explained the limited scope and might not be use to estimate the total carbon-dioxide emission energy because the each value could not include or represent the overall building. In this paper, it provided the estimation model of the carbon-dioxide emission, explained by the overall building characteristics. These factors are shown as the maintenance area, no. of household, the heating type, the volume of the building, the ratio of the window to wall area etc., For providing the estimation model of th carbon-dioxide emission, it conducted the corelation analysis to filter the variables and suggested the estimation model with the power model and multiple regression model. Most of the model have a good statistics and fitted in the curve line.

The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure (비용구조분석에 의한 건축단계별 공사비용 절감방법)

  • Park, Keun-Joon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.1 s.15
    • /
    • pp.97-103
    • /
    • 2005
  • Building costs means capital costs which include cost of land, costs of acquiring and preparing the site, construction costs, professional fees, furnishings, cost of financing the project. and cost of management required to run and maintenance the building for use. There are several phases that determine the building costs : design phase, construction phase, and operation & maintenance phase. So, the cost of work could be set against the examining the full range of complexities that a building program might contain. To solve this problem, it needs to compute building cost systematically. This is still in the development stage, awaiting the organization of rational cost data base. The method of cost saving by cost control could be constituted by detailed knowledge of building costs for all possible combinations of components and subsystems that can be assembled into integration model of cost factor on each phase of project development. The model of cost saving in each building phase is available for procedures of cost control of building systems.

A Study on the Service life of the Building Components in the Apartment Housing (공동주택 구성재의 내용년수 산정방법에 관한 연구)

  • Lee Kang-Hee;Chang Jung-Hee;Chae Chang-U
    • Journal of the Korean housing association
    • /
    • v.16 no.5
    • /
    • pp.67-74
    • /
    • 2005
  • The performance of building should be deteriorated with time while the building would maintain and manage the function and performance to get a living condition. For the efficient maintenance of the building, the repair cycle would be provided and applied during the service-life time. The service-life time of the building components would be needed to determine the repair time and the repair scope. The service-life time of the building components would be calculated with the 1st repair time and the recovery rate of the performance, considering the recovery rate after repaired. In this paper, the 1st repair time would be estimated with the normal probability distribution, choice probability and 3rd quadratic function. The recovery rate of the building components assumes various level according to the research target and utility area. The results of this study are as follows ; first, most of the components of the building work would range about 30 years in the service-life time and the components of the mechanical works range from 28 years to 37 years, those of the electrical works would be about 31 years.

The Floor Area Characttics of the Elementary School Building Facilities by the District Office of Education in Seoul (서울시 지역교육청별 초등학교 교사시설의 면적특성)

  • Kim, Jong-Seok;Ryu, Ho-Seoup
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.17 no.3
    • /
    • pp.33-40
    • /
    • 2010
  • This paper considered 1) the relation between the number of student and the floor area of the school building facility, 2) the situation and the distribution of the school building facilities area, 3) the position between the district office of education by the school building facilities composition. Data were collected from 529 elementary school in seoul. 1) The number of student is have not an influence on the floor area of the school building facility in the middle school. 2) The floor area of the school building facilities per 1 student of the jungbu district office of education is larger than other the district office of education and distribution of area is wide. 3) As the position between the district office of education by the school building facilities composition is considered by principal component analysis, the maintenance of the need space is late in the gangdong gangseo district office of education, maintenance of support space is late in the gangdong dongbu district office of education, the maintenance of management space is late in the seobu bukbu district office of education.

Sensor-based Motion Planning Algorithm for High-rise Building Facade Cleaning of Built-in Guide Type Multi-Robot (Built-in guide 타입 다중 로봇의 고층 빌딩 외벽 청소를 위한 센서 기반 운동 계획 알고리즘)

  • Lee, Seung-Hoon;Kim, Dong-Hyung;Kang, Min-Sung;Gil, Myung-Soo;Kim, Young-Soo;Back, Sung-Hoon;Han, Chang-Soo
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.18 no.5
    • /
    • pp.445-452
    • /
    • 2012
  • With the increasing number of high-rise and large-scale buildings, modern buildings are becoming intelligent, and are incurring high construction costs and requiring careful maintenance. Maintenance works for high-rise buildings significantly depend on human labor, unlike other construction processes that are gradually being automated. The resulting accidents may produce very high social and economic losses. To address this problem, herein, this paper proposes robotic building maintenance system using multi-robot concept, in specific, cleaning a building facade which is directly subjected to minimize human labor; that improves the process efficiency and economic feasibility. The sensor for detecting contamination of building's outer-wall glass is proposed; Kalman filter was used for estimating robots' status with the contamination of the window glass. Task allocation of the sensor based multi-robots for an effective way of task execution is introduced and the feasibility was verified through the simulations.

Development of BIM for a Maintenance System of Subway Infrastructures (지하철 구조물 유지관리 시스템을 위한 BIM 개발)

  • Shim, Chang-Su;Kim, Seong-Wook;Song, Hyun-Hye;Yun, Nu-Ri
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.6-12
    • /
    • 2011
  • BIM(Building Information Modeling) technologies are the most effective for the maintenance of infrastructures because they provide information sharing througout the life-cycle of structures and support close communication between different project stages. Systematic and well-organized data play a fundamental role for the effective maintenance of subway tunnel. In this paper, 3D information models for maintenance of BIM-based subway tunnel structures are developed. Standard classifications for the maintenance and construction information classification system were adopted. A classification system based on construction information classification system was built considering procedures of maintenance work. It provides optimization and standardization of the work flow for the maintenance of subway structures by applying information modeling processes instead of the current maintenance practices. It can effectively reduces the life cycle cost and time for the maintenance. The proposed system can be utilized for the maintenance history management to enhance current maintenance system.

Development of Maintenance-Service Model for Small Photovoltaic Equipment (소형 태양광발전설비의 유지관리 서비스 모델 개발)

  • Kang, Seok-Hwa;Park, Byeong-Hun;Choei, Jong-Won;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.234-235
    • /
    • 2015
  • In South Korea, small photovoltaic equipment is increasingly adopted in more detached houses on the constant basis. With this broader use of small photovoltaic equipment, its systematic maintenance becomes all the more necessary. However, photovoltaic facility maintenance has been concentrated solely on large-scale solar energy generation plants in the country while hardly covering smaller facilities. In this research, the JEM rule and extant maintenance company services were analyzed to develop a proper maintenance model for small photovoltaic equipment. The maintenance service procedures designed herein are as follows: A small photovoltaic equipment user chooses a maintenance company and signs a contract. Once a contract is made, the Korea Energy Management Corporation provides a certain kind of incentive to the company. The company provides maintenance service to the user and receives a service fee. If such a maintenance service model is in place, small photovoltaic equipment efficiency is expected to increase and users could receive systematic maintenance services. Also the new creation of small photovoltaic equipment maintenance service would form a new market to generate more jobs for the society.

  • PDF

An Analysis of the Energy Saving Effect Through the Retrofit and the Optimal Operation for HVAC Systems (공조설비 운전방법 및 시설개선을 통한 에너지절약 효과분석)

  • Kim, Yong-Ki;Lee, Tae-Won
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.4
    • /
    • pp.343-350
    • /
    • 2012
  • The major goal of building energy management is to minimize the energy consumption while maintaining the comfortable environment condition. Nowadays building energy management to save HVAC energy and so on is the most critical issue for existing building service branch with high efficiency equipments and their optimal operation. The effects on the building energy savings of the building equipment retrofit and the improvement of its operation method, especially in the field of HVAC system, were analyzed in this study for domestic small and/or medium sized buildings. Over 8.8% of energy saving was achieved compared withe total energy consumption in commercial building. These results could be used for reasonable maintenance and efficient management of the various building service equipments and related systems.

A Study on the Improvement of Building Maintenance System - Focusing on Comparison with Japanese Case - (건축물 유지관리제도 개선방안 연구 - 한국과 일본의 유지관리 운영실태 비교분석 -)

  • Yoon, Hyo-Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.737-745
    • /
    • 2015
  • The purpose of this study is to clarify the challenges and suggest regulatory improvement strategy by investigating the Japanese building maintenance system which had been conducted for decades. The efficiency and problems of the current building maintenance system of Korea are analyzed by stake holders and purpose of management. The results show that several strategies are important to improve the quality of building maintenance. They include check list focusing on the purpose of maintenance, efficient and fair criteria, rational checking period considering owner's budget, cooperation with professionals in facilities, and promotion of professional companies participation. The results imply that the challenges should be solved systematically rather than individually.

A Web-based Long-Term Repair Planning System for Apartment House (웹 기반의 공동주택 장기수선계획 시스템)

  • La Hyo-Shin;Kim Tae-Hee;Han Choong-Hee;Kim Sun-kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.495-500
    • /
    • 2001
  • After the completion of an apartment housing project, deterioration of building materials will commence over time. Building maintenance consists of short-time and long-term repair projects. A long-term repair plan for organized maintenance management should be developed and implemented to maintain the longevity of the building. When forming such a plan, one should carefully predict when each part of the building will need repairs and how often subsequent repairs of each part will occur. The plan should be based on these predictions. Many apartment buildings in Korea have poor long-term maintenance management plans. This is because many of these plans are developed as mere legal formalities rather than as serious attempts to maintain the longevity of buildings. In this study, the materials used in the construction of each part of an apartment building we selected are taken into account to predict when the repairs will be required and how frequently subsequent repairs will be required. Furthermore, We suggest a long-term maintenance management plan for elongation so that apartment house managers can use to periodically check, diagnose, and replace old or malfunctioning parts using a web-based maintenance calender.

  • PDF