• Title/Summary/Keyword: Building Construction

Search Result 11,196, Processing Time 0.036 seconds

The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure (비용구조분석에 의한 건축단계별 공사비용 절감방법)

  • Park, Keun-Joon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.1 s.15
    • /
    • pp.97-103
    • /
    • 2005
  • Building costs means capital costs which include cost of land, costs of acquiring and preparing the site, construction costs, professional fees, furnishings, cost of financing the project. and cost of management required to run and maintenance the building for use. There are several phases that determine the building costs : design phase, construction phase, and operation & maintenance phase. So, the cost of work could be set against the examining the full range of complexities that a building program might contain. To solve this problem, it needs to compute building cost systematically. This is still in the development stage, awaiting the organization of rational cost data base. The method of cost saving by cost control could be constituted by detailed knowledge of building costs for all possible combinations of components and subsystems that can be assembled into integration model of cost factor on each phase of project development. The model of cost saving in each building phase is available for procedures of cost control of building systems.

The Development of Automated Building Equipment Design Process System Using 3D CAD (3차원 CAD정보를 활용한 건축설비설계 프로세스 시스템 개발방향)

  • Lee, Dong-Hyun;Jung, Woo-Shin;Kim, Young-Don;Song, Kyoo-Dong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.269-274
    • /
    • 2008
  • It is attempted that the standardization of the construction, globalization of the engineering construction and an information oriented construction spread by setting a goal of the advanced construction industry and productivity increase of human resources within the country. Hence, it has been brought in the information oriented construction of BIM based technology for the field of construction and equipment of Korea. The current study that examines the possibility of application of 3D ; that is BIM based programs of building equipment, and make better the problems of 3D building equipment system through the Pilot Test, indicates the way of growth development about the construction of building equipment process system.

  • PDF

Key Technologies for Super Tall Building Construction: Lotte World Tower

  • Kim, Gyu Dong;Lee, Joo Ho
    • International Journal of High-Rise Buildings
    • /
    • v.5 no.3
    • /
    • pp.205-211
    • /
    • 2016
  • This paper addresses the key technologies for supertall building construction based on the Lotte World Tower project in Korea. First, the mega-mat foundation construction technologies are shown, including ultra-low heat concrete, heat of hydration control programs, and the logistics plan. Then, high strength concrete technologies of 50~80 MPa are introduced and discussed within the context of the highest pumping record in Korea at 514.25 meters. Structural design concepts of gravity load and lateral force resistance systems are introduced, along with surveying systems using GNSS and temporary installation plans of special heavy equipment like tower cranes, hoists, and high pressure concrete pumps. If it is possible to coordinate these key technologies and others, optimizing for the building's design and construction, supertall building construction can be successfully completed.

The Study on Integrated ACS and Lift Car System for Early Beginning of Windows Work in Tall Building Construction (초고층 창호공사 조기착공을 위한 ACS-Lift Car 연계 시스템 기초연구)

  • Lee, Dongyoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.72-73
    • /
    • 2014
  • Recently the concurrent construction method of framework and windows work has been applied for early beginning of exterior finishing works in tall building construction. However, the conventional method makes difficulties in auto-climbing of gang-form and climbing work of lift car since the removal of ACS(auto climbing system) should be preceded for operation of lift car up to the top floor. This study propose a concept model of integrated ACS and lift car system to resolve these problems and begin windows works early in tall building construction.

  • PDF

Development of Two-Sided Multi-Press Technology for FCP Shape Implementation (FCP 형상구현을 위한 양면다점프레스 기술 개발)

  • Jeong, Kyeong-Tae;Kin, Ki-Hyuk;Lee, Dong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.83-84
    • /
    • 2019
  • Free-form buildings refer to geometric external structures in curved form, unlike conventional structures with straight lines. The development of construction technologies for the implementation of these Free-form buildings is ongoing. However, there are still many restrictions on the construction technology of Free-form buildings, resulting in problems such as increased construction period and increased construction costs. Therefore, it is urgent to develop building technology for the construction of Free-form building in order to secure competitiveness in the global Free-form building market. Accordingly, this study proposes Two-sided multi-point press technology that can solve problems of existing technology and implement FCP(Free-form Concrete Panel).

  • PDF

A STUDY ON THE SAFETY INFORMATION SYSTEM TO PREVENT HAZARD OF BUILDING CONSTRUCTION

  • Han-Min Lee;Seong-Seok Go;Hyuk Song;Hyun-Chul Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1048-1052
    • /
    • 2005
  • In Korean cases, the occupation of building construction is below 10% of the total industry workers but from a accident rate point of view, it is a risk serious industry and it's hazard is very considerable which accident rate is up to 30% of the total industry workers. The reason of high accident rate of the building construction is its own characteristic, hazard of the work in which is implicated and the shortage of safety counter plan and information, so it is most required to the building construction that educating, training, short and long period approaching to prevent the hazard. The safety information of building construction which is related to safety accident is divided into human and material such as hazard, work situation, cause and counter plan. The existing hazard cases imply all of the information about the work type and work progress of the building construction, so if the research of the every fact is well accomplished, we can obtain the useful information and prevent the hazard of building construction. From this point of view, the emphasis of this study is based on analyzing the cause of hazard first, suggesting the safety information each part of work type and work progress second, and finally making the all existing hazard cases to the Data Base and developing the safety information system.

  • PDF

Forecasting of building construction cost variation using BCCI and it's application (건축공사비지수를 이용한 건설물가 변동분석 및 공사비 실적자료 활용방안 연구)

  • Cho Hun Hee;Kang Kyung In;Kim Chang Duk;Cho moon Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.64-71
    • /
    • 2002
  • This research developed construction cost forecasting model using Building Construction Cost Index, time series analysis and Artificial Neural Networks. By this model, we could calculate the forecasted values of construction cost precisely and efficiently. And we also could find out that the standard deviation of forecasted values is 0.375 and it is a very exact result, so the standard deviation is just 0.33 percent of 112.28, the average of Building Construction Cost Index. And it show more exact forecasting result in comparison with Time Series Analysis.

  • PDF

A Study on The Possibility of BIM(Building Information Modeling) Application of Construction Management (건설사업관리의 BIM(Building Information Modeling) 적용 가능성에 관한 연구)

  • Shim, Jin-Kyu;Yi, Hye-In;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.2
    • /
    • pp.49-60
    • /
    • 2010
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But the each role of participants is individually changed to step in construction process stage and moreover it has complicated, entangled interests. The Construction Management was inducted for the effective management and operation of construction project. The Key of the Construction Management success depends on the cooperative relationship relation to major participants. The domestic construction system is difficult with many trial and errors for the frequent plan change. As the building are more bigger and complicated, Building Information Modeling is demanded design and maintenance. This evaluation was done by the trust on the system as well as Construction Management. And then it applies the BIM it analyzes the example of construcrion project.

Application Period and Participants for Construction Engineering at the Design Phase in Tall Building Construction (초고층 건축공사 설계단계에서의 시공엔지니어링 업무 적용시기 및 수행주체 분석)

  • Lee, Jin Woong;Cho, Kyuman;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.179-180
    • /
    • 2017
  • In order to improve the constructability of tall building construction, there is increasing needs to derive the design output by performing construction engineering at the design phase. It contributes to minimizing wastes such as design changes and reworks as well as improving project performance. Therefore, in this study, we analyzed the application period and participants for engineering tasks derived from a previous study, and then regrouped to efficiently reflect them at the design phase. Considering similarity of application period and attributes, the existing 22 engineering tasks, which were classified into 5 factors, were reclassified into 13 groups. The results of this study can be used as basic data for efficient construction engineering execution at the design phase.

  • PDF

Citic Tower Construction Key Technology

  • Xu, Lishan
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.185-192
    • /
    • 2019
  • Citic Tower is the first over-500 m-tall super highrise building in the world, located in the high seismic intensity area with paek ground acceleration over 0.2g in 475 years. This project is unique in its complexity, large volume, and challenging site conditions (zero site for construction). The traditional techniques can hardly meet safty, quality and schedule requirements of the construction. This article introduces the key construction technologies that are innovatively developed and applied in Citic Tower project construction, including intelligent super-high-rise building integrated construction platform system, independently developed by the CCTEB; Jump-Lift Elevator, which is the first of the kind with service height over 500 meters; combined temporary-and-permanent fire protection systems. The BIM technology is also applied in this project. Through technical innovation, and utilization of technologies, construction speed and safety had been greatly improved.