• 제목/요약/키워드: Budget Constraint

검색결과 74건 처리시간 0.023초

자금제약하에서 동류전용이 허용될 때 수리가능한 동시조달부품의 적정소요량 결정 (Provisioning Quantity Determination of Repairable Concurrent Spare Part under Budget Constraint and Cannibalization Allowed)

  • 오근태;나윤균
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제12권3호
    • /
    • pp.225-238
    • /
    • 2012
  • In this paper determined is the quantity of repairable concurrent spare parts(CSP) of a new equipment system to maximize the operational availability under budget constraint and cannibalization allowed. When a part fails, the part is replaced and the failed part is repaired for later use while cannibalization is allowed. The failure of a part is assumed to follow a Poisson process and the availability in CSP is defined. The solution procedure consists of two parts. Firstly, a mathematical model is developed under the assumption that the failure rate is constant during the CSP period and cannibalization is not allowed. Secondly, proposed is a simulation search procedure which improves the heuristic solution to the near optimal solution in a reasonable amount of time under the assumption that the cannibalization is allowed.

다품종 예산제약을 고려한 중앙창고문제 해결방법론에 대한 연구 (A Study on A Methodology for Centralized Warehouse Problem Considering Multi-item and Budget Constraint)

  • 이동주
    • 산업경영시스템학회지
    • /
    • 제35권4호
    • /
    • pp.126-132
    • /
    • 2012
  • This paper deals with a centralized warehouse problem with multi-item and capacity constraint. The objective of this paper is to decide the number and location of centralized warehouses and determineorder quantity (Q), reorder point (r) of each centralized warehouse to minimize holding, setup, penalty, and transportation costs. Each centralized warehouse uses continuous review inventory policy and its budget is limited. A SA (Simulated Annealing) approach is developed and its performance is tested by using some computational experiments.

서비스 비용을 고려한 연속적 재고관리시스템 해결을 위한 근사법 (An Approximation Approach for Solving a Continuous Review Inventory System Considering Service Cost)

  • 이동주;이창용
    • 산업경영시스템학회지
    • /
    • 제38권2호
    • /
    • pp.40-46
    • /
    • 2015
  • The modular assembly system can make it possible for the variety of products to be assembled in a short lead time. In this system, necessary components are assembled to optional components tailor to customers' orders. Budget for inventory investments composed of inventory and purchasing costs are practically limited and the purchasing cost is often paid when an order is arrived. Service cost is assumed to be proportional to service level and it is included in budget constraint. We develop a heuristic procedure to find a good solution for a continuous review inventory system of the modular assembly system with a budget constraint. A regression analysis using a quadratic function based on the exponential function is applied to the cumulative density function of a normal distribution. With the regression result, an efficient heuristics is proposed by using an approximation for some complex functions that are composed of exponential functions only. A simple problem is introduced to illustrate the proposed heuristics.

The Application of Optimal Control Through Fiscal Policy on Indonesian Economy

  • SYAHRINI, Intan;MASBAR, Raja;ALIASUDDIN, Aliasuddin;MUNZIR, Said;HAZMI, Yusri
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제8권3호
    • /
    • pp.741-750
    • /
    • 2021
  • The budget deficit is closely related to expansionary fiscal policy as a fiscal instrument to encourage economic growth. This study aims to apply optimal control theory in the Keynesian macroeconomic model for the economy, so that optimal growth can be found. Macroeconomic variables include GDP, consumption, investment, exports, imports, and budget deficit as control variables. This study uses secondary data in the form of time series, the time period 1990 to 2018. Performing optimal control will result in optimal fiscal policy. The optimal determination is done through simulation, for the period 2019-2023. The discrete optimal control problem is to minimize the objective function in the form of a quadratic function against the deviation of the state variable and control variable from the target value and the optimal value. Meanwhile, the constraint is Keynes' macroeconomic model. The results showed that the optimal value of macroeconomic variables has a deviation from the target values consisting of: consumption, investment, exports, imports, GDP, and budget deficit. The largest deviation from the average during the simulation occurs in GDP, followed by investment, exports, and the budget deficit. Meanwhile, the lowest average deviation is found in imports.

CSP 적정소요 산출을 위한 모형개발에 관한 연구 (A Study on the Development of Models for the Optimal Requirement Level of the CSP)

  • 박상수;이규헌
    • 한국국방경영분석학회지
    • /
    • 제23권1호
    • /
    • pp.63-75
    • /
    • 1997
  • This study is concerned with a few models for optimal requirement level of CSP by improving and adjusting the existing models to determine CSP items and quantity as follows. First, by building a model with a objective function of the operating level and constrains of budget, quantity and items of CSP are simultaneously determined. Second, we removed some steps to improve initial solution by using a constraint of usable budget level. Third, we demonstrated a model to be applied with real operating situation by combining two models of Lee(1994) and above. Lastly, by assuming a failure probability distribution is a binomial distribution, the better solution can be obtained. Some facts with necessity of policy improvement were raised as follows: (1) necessity of improvement of the CSP acquisition system, (2) in case of the same kind, permission of diversion in order to execute budget effectively, (3) getting accurate failure rate.

  • PDF

비용 제약을 갖는 컴퓨터 네트워크의 최적화 (Optimization of Computer Network with a Cost Constraint)

  • 이한진;염창선
    • 산업경영시스템학회지
    • /
    • 제30권1호
    • /
    • pp.82-88
    • /
    • 2007
  • This paper considers a topological optimization of a computer network design with a cost constraint. The objective is to find the topological layout of links, at maximal reliability, under the constraint that the network cost is less or equal than a given level of budget. This problem is known to be NP-hard. To efficiently solve the problem, a genetic approach is proposed. Two illustrative examples are used to explain and test the proposed approach. Experimental results show evidence that the proposed approach performs more efficiently for finding a good solution or near optimal solution in comparison with a simulated annealing method.

반제품과 선택품의 재고관리 정책에 대한 연구 (A Study on Inventory Control Policy for Semi-Finished Product and Optional Components)

  • 이동주;이창용
    • 산업경영시스템학회지
    • /
    • 제36권4호
    • /
    • pp.31-37
    • /
    • 2013
  • In this paper, we develop an efficient approach to solve a continuous review inventory system with a budget constraint when the semi-finished product and optional components are required to be assembled. We are, in particular, interested in a budget constraint that includes a service level. The service cost, such as labor and facility costs, tends to increase as the service level increase, and it makes the problem difficult to solve. Assuming that the reorder point for a semi-finished product is given, we show that the order quantity for the semi-finished product and the order quantity and reorder point for optional components can be determined by minimizing the total cost that includes setup cost, inventory holding cost, and shortage cost. The performance of the proposed approach is tested by numerical examples. By using sensitivity analysis, we conclude that, as the reorder point for semi-finished product increases, the order quantity for semi-finished product increases, whereas the order quantity and reorder point of optional components decreases.

The Heterogeneity of Job Creation and Destruction in Transition and Non-transition Developing Countries: The Effects of Firm Size, Age and Ownership

  • Ochieng, Haggai Kennedy;Park, Bokyeong
    • East Asian Economic Review
    • /
    • 제21권4호
    • /
    • pp.385-432
    • /
    • 2017
  • This paper investigates how firm age, size and ownership are related with job creation and destruction, and how these patterns differ across transition and non-transition economies. The analysis finds that age is inversely related with gross job creation and net job creation in the two samples. This finding is consistent with the theory of the learning effect. The relationship between age and job destruction is indifferent in non-transition economies. On the contrary, old firms in transition economies destroy more jobs than young ones. The paper further establishes an inverse relationship between size and gross job creation in the two groups. However, there is divergence between the two samples; small firms in non-transition economies also exhibit a higher gross job destruction rate. Consequently large firms have a higher net job creation rate. In transition economies, small and large firms exhibit similar rates of job destruction. But small firms retain a higher net job creation rate. A more intriguing finding is that state owned firms do not underperform domestic private ones. This means these countries may be using soft budget constraint which allows state owned firms to overstaff. Finally, crowding out of SMEs by foreign owned firms is not evident in transition economies.

예산제약을 고려한 IT프로젝트 선정 모델 연구 (A Study on the IT Project Selection Considering Budget Constraints)

  • 박재희;조남욱;김우제
    • 한국전자거래학회지
    • /
    • 제18권4호
    • /
    • pp.327-338
    • /
    • 2013
  • IT프로젝트를 수행하는 기업은 정해진 예산범위 내에서 투자계획을 수립하고 실행하게 된다. 이 과정에서 IT프로젝트를 효과적, 효율적으로 선정하는 문제는 기업경쟁력과 직결되는 중요한 요소이다. 그동안 IT프로젝트의 선정을 위한 다양한 모형이 개발되었으나 예산제약을 고려한 효과적 프로젝트 선정에 대한 연구는 보고되지 않고 있다. 본 연구에서는 예산 제약을 고려하여 효과적으로 IT프로젝트를 선정하는 기법을 제시하였다. 본 연구에서 제안한 모델(AHP-K)에서는 AHP(Analytic Hierarchy Process : 계층분석법) 기법을 적용하여 평가 항목의 가중치와 프로젝트 후보군의 가중치를 산정한 후 배낭문제(Knapsack Problem)를 적용하여 예산 범위 내에서 프로젝트 효용을 최대화하는 선정안을 도출한다. 실제 적용단계에서 고려하는 대안이 많거나 신규대안이 추가되는 경우 쌍대비교의 수행이 어려운 점을 감안하여 대안 비교 단계에서 절대평가법을 적용하였다. 본 연구에서는 제시된 모델을 실제 사례에 적용하여 기존 AHP 모형과 비교 분석함으로써 효과성을 검증하였다.

예산제약하에서 수리부속 최적조달요구량 산정 연구 (A Study of the Optimal Procurement to Determine the Quantities of Spare Parts Under the Budget Constraint)

  • 이상진;김승철;황지현
    • 경영과학
    • /
    • 제27권2호
    • /
    • pp.31-44
    • /
    • 2010
  • It is very important to forecast demand and determine the optimal procurement quantities of spare parts. The Army has been forecasting demand not with actual usage of spare parts but with request quantities. However, the Army could not purchase all of forecasted demand quantities due to budget limit. Thus, the procurement quantities depend on the item managers' intuition and their meetings. The system currently used contains many problems. This study suggests a new determination procedure; 1) forecasting demand method based on actual usage, 2) determining procurement method through LP model with budge and other constraints. The newly determined quantities of spare parts is verified in the simulation model, that represents the real operational and maintenance situation to measure the operational availability. The result shows that the new forecasting method with actual usage improves the operational availability. Also, the procurement determination with LP improves the operational availability as well.