• Title/Summary/Keyword: Breaking Time

Search Result 480, Processing Time 0.024 seconds

An Analysis on Ice Load Signals Measured from Repetitive Ramming in Heavy Ice Condition (두꺼운 해빙에 대한 충격쇄빙 시 빙하중 신호 분석)

  • Ahn, Se-Jin;Lee, Tak-Kee;Choi, Kyungsik
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.55 no.4
    • /
    • pp.306-312
    • /
    • 2018
  • To navigate in ice-covered waters, the ice-breaking process is required. The ice-breaking mode depends on material properties of sea ice and ice conditions. The ice-breaking mode is classified into ramming and continuous ice-breaking. The ramming is effective on large ice features, such as thick ice ridge and icebergs, and the continuous ice-breaking is on level ice. In general, the impact time duration of crushing or bending on ice sheets is from 0.2 to 1.0 second. However, impact duration in ramming will be increased. The Korean ice-breaking research vessel ARAON conducted her research voyage in the Antarctic sea during the winter of 2012. The IBRV ARAON measured strain in ramming and continuous ice-breaking. Strain gauge signals were recorded during the planned ice-breaking performance and the unplanned ice transits in heavy ice conditions. The aim of this study is to investigate the ice load signals measured in ramming processes under the heavy ice condition. Based on the time history of the signals, a raising time, a half-decaying time and time duration were investigated and compared with the previous study which was suggested the five profiles of the ice load signals.

Chip Breaking Characteristics of S, PbS, and BiS Free Machining Steels (S, PbS 및 Bi S 쾌삭강의 칩절단 특성)

  • Lee, Young-Moon;Bae, Dae-Won;Jang, Jun-Ho
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.4 no.2
    • /
    • pp.3-9
    • /
    • 2005
  • In this study, the chip breaking characteristics of S, PbS and BiS free machining steels have been assessed. PbS free machining steel shows the lowest value of chip thickness ($t_c$) under the same cutting conditions. SM10C steel has the largest value of the chip cross-section area ratio ($R_{CA}$). As the feed rate becomes larger the chip breaking cycle time ($T_B$) decreases and the chip breaking index ($C_B$) increases. The properly controlled-C type chip has been obtained with the value of $C_B$ between 0.05 and 0.2. Free machining steel, PbS produces the properly controlled-C type chip in a wider feed rate range than other steels.

  • PDF

Assessment of cutting performance and chip breaking characteristics with a nondimensional parameter consists of cutting condition and tool shape factor(l) -Orthogonal cutting- (절삭 조건과 공구 형상 인자로 구성된 무차원 파라미터에 의한 절삭 성능 및 칩절단 특성 평가(I))

  • LEE, Young-Moon;CHOI, Won-Sik;SEO, Seok-Won
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.11 no.6
    • /
    • pp.179-184
    • /
    • 1994
  • In this study a nondimensional parameter, feed/land length(F/L) was introduced, and using this parameter, cutting performance and chip breaking characteristics of the groove and the land angle type chip formers were assessed. Specific cutting energy consumed and shape of broken chip with its breaking cycle time were appraised to find out the ranges of F/L value where efficient cutting and effective chip breaking could be achieved. C type chip was found out to be the most preferable in terms of cutting efficiency.

  • PDF

Data Acquisition and Analysis for Running Performance Evaluation of the Electric Train (전동차 주행성능평가를 위한 데이터취득 및 분석)

  • Lee, K.W.;Kim, M.Y.;Baik, K.S.;Shim, J.B.;Chang, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.1099-1100
    • /
    • 2006
  • The running of the electric train are done by powering, breaking and coasting. Powering to start and accelerate the rolling stock means driving the three-phase electric induction motors controlled by VVVF inverters which are connected to overhead power line directly(DC) or indirectly(AC, DC/AC). Breaking is achieved by blending control which is the proportional combination between regenerative breaking of VVVF inverter and air pressure control of breaking operating unit(BOU). Therefore, Data obtained during two operation are very important items to evaluate the running performance of RS. This paper has investigated in real time data acquired from VVVF inverter and measured by pressure sensor directly connected to air breaking line(motor car and trailer car). By analyzing data in the region of time and frequency, fundamental methods for eavaluating the running performance of RS quantitatively and objectively have been suggested.

  • PDF

Chip Breaking Characteristics of Cold-Drawn Free Machining Steel (냉간 인발된 쾌삭강의 칩절단특성)

  • 최원식
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.8 no.4
    • /
    • pp.45-51
    • /
    • 1999
  • In this study to assess chip breaking characteristics of cold-drawn free machining steels a newly developed non-dimensional parameter chip breaking index CB has been adopted. And for comparison with free machining steels chip breaking characteristics of conventional carbon steels were investigated. Properly controlled chips were produced with the CB value of 0.05-0.2 regardless of steel types. In case of cold-drawn free machining steels however cycle times of chip breaking are relatively shorter than those of conventional steels. And properly controlled chips were obtained from wider range of feed rate.

  • PDF

Chip Breaking Characteristics of Cold-Drawn Free Machining Steel (냉간 인발된 쾌삭강의 칩절단특성)

  • 장은실;최원식;이용주;강태봉;이영문
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 1999.05a
    • /
    • pp.21-26
    • /
    • 1999
  • In this study, to assess chip breaking characteristics of cold-drawn free machining steels, a newly developed non-dimensional parameter, chip breaking index, C/sub B/ has been adopted. And for comparison with free machining steels, chip breaking characteristics of conventional carbon steels were investigated. Properly controlled chips were produced with the C/sub B/ value of 0.05∼0.2, regardless of steel types. In case of cold-drawn free machining steels, however, cycle times of chip breaking are relatively shorter than those of conventional steels. And properly controlled chips were obtained from wider range of feed rate.

  • PDF

Numerical Simulation of Incipient Breaking Waves (초기 쇄파의 수치모사)

  • 김용직;김선기
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.39 no.4
    • /
    • pp.1-10
    • /
    • 2002
  • For the time-domain simulation of incipient breaking waves, usually the boundary integral method has been used so far, and it seems to be successful except a problem of too much computation time. The present paper shows a new computation technique for the simulation of breaking wave experiment. This technique uses the high-order spectral/boundary element method and the boundary integral method in sequence, and reduces the computation time remarkably. The wave generation and energy focusing process is efficiently simulated by the high-order spectral/boundary element method. Only the wave over-turning process is simulated by the boundary integral method. In the example calculation result, salient features of breaking waves such as high particle velocities and accelerations are shown.

A Study on the High Speed Interruption of Parallel Arcing (병렬아크의 고속차단에 관한 연구)

  • Kil, Gyung-Suk;Ji, Hong-Keun;Park, Dae-Won;Kim, Il-Kwon;Kim, Young-Il;Cho, Young-Jin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.12
    • /
    • pp.95-100
    • /
    • 2008
  • Conventional Earth Leakage Circuit Breakers (ELCBs) have defects of a breaking failure or a long breaking-time against parallel arc current. In this paper, breaking characteristics of conventional ELCBs were analyzed by simulation of parallel arc in a low-voltage indoor wiring system, and an air-core current sensor and a signal converter being most available for parallel arc detection were developed and applied to a conventional ELCB. The proposed tripped the ELCB regardless of the location of parallel arc. The breaking-time was in ranges of $1.74{\sim}8.3[ms]$ depending on the phase of arc generation, which is about 5 times as fast as conventional ELCBs with the breaking-time of 50[ms].

Effect of Boundary Condition History on the Symmetry Breaking Bifurcation of Wall-Driven Cavity Flows

  • Cho, Ji-Ryong
    • Journal of Mechanical Science and Technology
    • /
    • v.19 no.11
    • /
    • pp.2077-2081
    • /
    • 2005
  • A symmetry breaking nonlinear fluid flow in a two-dimensional wall-driven square cavity taking symmetric boundary condition after some transients has been investigated numerically. It has been shown that the symmetry breaking critical Reynolds number is dependent on the time history of the boundary condition. The cavity has at least three stable steady state solutions for Re=300-375, and two stable solutions if Re>400. Also, it has also been showed that a particular solution among several possible solutions can be obtained by a controlled boundary condition.

Chilling Requirement for Breaking of Internal Dormancy of Main Apple Cultivars in Korea (국내 사과 주요 품종들의 자발휴면 타파에 필요한 저온요구도)

  • Kweon, Hun-Joong;Sagong, Dong-Hoon;Song, Yang-Yik;Park, Moo-Yong;Kwon, Soon-Il;Kim, Mok-Jong
    • Horticultural Science & Technology
    • /
    • v.31 no.6
    • /
    • pp.666-676
    • /
    • 2013
  • The study was carried out to examine the initial point of dormancy, breaking time of internal dormancy, and to find out the accumulated hours of low temperature (under $7.2^{\circ}C$ from $0.0^{\circ}C$ to $7.2^{\circ}C$) for bud-breaking. Over-all, the chilling requirement for breaking of internal dormancy in the commercial apple cultivars ('Fuji' and 'Tsugaru') and apple cultivars bred in Korea ('Hongro', 'Sunhong', 'Honggeum', 'Hongan', 'Hongso', 'Gamhong', 'Summer dream') at the Gunwi region for 4 years (from 2009 to 2012) was investigated. Also, the breaking time of internal dormancy in the field at the Gunwi region and the breaking time of dormancy if air temperature of Gunwi region rises $4^{\circ}C$ higher than the current one were investigated using the same data. The initial point of dormancy was set at the time when the lateral bud breaking did not occurred (when heading back cutting was done in the middle of terminal shoots). The occurrence of the breaking of internal dormancy was decided if the breaking of the terminal bud of bourse shoot occurred within 15 days or not in growth chamber. About 100 bourse shoots were collected by cultivar classification in early December every year and were stored at $5.0^{\circ}C$, and they were placed in growth chamber at one week interval. The chilling requirement of cultivars was expressed in accumulated hours in the field and in the growth chamber under $7.2^{\circ}C$ and $0.0-7.2^{\circ}C$ from the initial point of dormancy to the breaking time of internal dormancy. The results showed that the initial point of dormancy in selected cultivars could occur at the end of September. The breaking time of internal dormancy could occur from the end of January to the early of February. The accumulated hours under $7.2^{\circ}C$ for breaking of internal dormancy were 1,600-2,000 hours, while those of $0.0-7.2^{\circ}C$ were 1,300-1,800 hours. In comparing the different apple cultivars, the chilling requirement of the early flowering cultivars seemed lower than that of the late-flowering cultivars. Based on these results, if the air temperature of Gunwi region rises about $4.0^{\circ}C$ higher than the current one, the breaking time of internal dormancy will be delayed by 2-4 weeks.