• Title/Summary/Keyword: Branch-line

Search Result 387, Processing Time 0.029 seconds

Vibration Related Branch Line Fatigue Failure (분기관 진동에 의한 피로파괴)

  • 전형식;박보용
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1990.10a
    • /
    • pp.113-124
    • /
    • 1990
  • Tap lines are small branch piping generally less than two inches in diameter. They typically branch off of header piping having a much larger diameter. An example of a common tap line is a 3/4 inch size high point vent or low point drain. Most tap lines have at least one valve near the header tap connection to provide isolation. Two valves are often required for double isolation. A light water reactor(LWR) nuclear power plant will have several hundred tap lines. These lines come in many sizes and shapes and serve numerous functions. A single process piping valve may have three different tap lines associated with it (figure 1). Table 1 delineates the different categories of tap lines. Vibration failures of tap lines are a common occurrence in all industrial plants including nuclear and fossil power plants. These types of failures constitute a significant percentage of all piping related failures. An unscheduled plant shutdown or outage resulting from the failure of a tap line decreases plant reliability and may have a detrimental effect on plant safety. Most tap line vibration failures can be avoided through the use of appropriate routing and support techniques. Standardized designs can be developed for use in a myriad of applications. These designs will not only minimize failures but will also reduce the necessary analysis and installation efforts.

  • PDF

Understanding Driver Compliance Behaviour at Signalised Intersection for Developing Conceptual Model of Driving Simulation

  • Aznoora Osman;Nadia Abdul Wahab;Haryati Ahmad Fauzi
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.3
    • /
    • pp.142-150
    • /
    • 2024
  • A conceptual model represents an understanding of a system that is going to be developed, which in this research, a driving simulation software to study driver behavior at signalised intersections. Therefore, video observation was conducted to study driver compliance behaviour within the dilemma zone at signalised intersection, with regards to driver's distance from the stop line during yellow light interval. The video was analysed using Thematic Analysis and the data extracted from it was analysed using Chi-Square Independent Test. The Thematic Analysis revealed two major themes which were traffic situation and driver compliance behaviour. Traffic situation is defined as traffic surrounding the driver, such as no car in front and behind, car in front, and car behind. Meanwhile, the Chi-Square Test result indicates that within the dilemma zone, there was a significant relationship between driver compliance behaviour and driver's distance from the stop line during yellow light interval. The closer the drivers were to the stop line, the more likely they were going to comply. In contrast, drivers showed higher non-compliant behavior when further away from stop line. This finding could help in the development of conceptual model of driving simulation with purpose in studying driver behavior.

An On-line Algorithm for Machine Layout Problem (기계 배치 문제의 온라인 알고리즘)

  • Wang, Gi-Nam
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.12 no.6
    • /
    • pp.27-36
    • /
    • 1995
  • This paper covers algorithms to determine a machine assignment strategy to locations on a single straight track by minimizing the total backtrack distance. Three different algorithms ar presented: an efficient heuristic procedure, the branch-and-bound algorithm, and the nerual network approach. Simulation results show that the proposed algorithms have potential power to design an on-line optimizer.

  • PDF

Performance Analysis of Improved Direct Conversion Six-port Phase Correlator (대역폭이 향상된 직접변환 Six-port 위상 상관기 성능분석)

  • Yu, Jae-Du;Kim, Young-Wan
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2007.06a
    • /
    • pp.91-94
    • /
    • 2007
  • In this paper, the six-port phase correlator using $90^{\circ}$ hybrid branch-line coupler and three-arm branch $90^{\circ}$ hybrid coupler were designed. The performances for two six-port phase correlators were analyzed by using ADS2003A tool. Three-arm six-port phase collerator provides more wide dynamic frequency range than that of six-port using the conventional hybrid coupler in range of circa five times. Six-port phase correlators were fabricated to evaluate the performance of two six-port phase correlators. The measured performances for two six-port phase correlators show the good accordance with the simulation data.

  • PDF

Sequencing for a mixed model assembly line in just-in-time production system (JIT 상황하에서 다품종 조립라인 작업물 투입 순서 결정 방안)

  • Hwang, Hark;Jeong, In-Jae;Lim, Joon-Mook
    • Korean Management Science Review
    • /
    • v.11 no.1
    • /
    • pp.91-106
    • /
    • 1994
  • In mixed model assembly lines, products are assembled seqeuntially that have different combination of options specified by customers. In just in time (JIT) environment, production smoothing becomes an important issue for sub-lines which supply the necessary parts to each workstation of the assembly line. Another important issue is to avoid line stopping caused by work overload in workstations. To find a sequence which minimizes the costs associated with line stoppage and the option parts inventory level, a nonlinear mixed integer programming is formulated. Recognizing the limit of the Branch and Bound technique in large sized problems, a heuristic solution procedure is proposed. The performance of the heuristic is compared with the Branch and Bound technique through randomly generated test problems. The computational results indicate that on the average the heuristic solutions deviate approximately 3.6% from the optimal solutions.

  • PDF

Scheduling for a Two-Machine, M-Parallel Flow Shop to Minimize Makesan

  • Lee, Dong Hoon;Lee, Byung Gun;Joo, Cheol Min;Lee, Woon Sik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.56
    • /
    • pp.9-18
    • /
    • 2000
  • This paper considers the problem of two-machine, M-parallel flow shop scheduling to minimize makespan, and proposes a series of heuristic algorithms and a branch and bound algorithm. Two processing times of each job at two machines on each line are identical on any line. Since each flow-shop line consists of two machines, Johnson's sequence is optimal for each flow-shop line. Heuristic algorithms are developed in this paper by combining a "list scheduling" method and a "local search with global evaluation" method. Numerical experiments show that the proposed heuristics can efficiently give optimal or near-optimal schedules with high accuracy. with high accuracy.

  • PDF

Ultimate Strength of branch-rotated T-joints in Cold-formed Square Hollow Sections - Chord flange failure mode - (지관이 회전된 냉간성형 각형강관 T형 접합부의 최대내력(I) - 주관 플랜지 파괴모드 -)

  • Bae, Kyu Woong;Park, Keum Sung;Kang, Chang Hoon;Moon, Tae Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.14 no.5 s.60
    • /
    • pp.657-664
    • /
    • 2002
  • This paper described the ultimate strength and deformation limit of the new uniplanar T-joints in cold-formed square hollow sections. In the configuration of the new T-joint, only a branch member is orientated to a chord member at 45 degrees in the plane of the truss. This study focused on the branch-rotated T-joints that were governed by chord flange failure in previous studies. Test results of the T-joint in cold-formed square hollow sections revealed a deformation limit of 3%B for $16.7{\leq}2{\gamma}(=B/T){\leq}33.3$ and $0.27{\leq}{\beta}(=b1/B){\leq}0.6$. The existing strength formulae for traditional T-joint were determined and a new yield-line model for the branch-rotated T-joint proposed. Finally, the strength formula on the yield-line analysis was compared with test results and the application range of the proposed formula recommended.

Design of A Asymmetric Branch Line Coupler Using Artificial Dielectric Substrate (가유전체 기판을 이용한 비대칭 브랜치 라인 커플러의 설계)

  • Lim, Jong-Sik;Lee, Jae-Hoon;Kwon, Kyung-Hoon;Ahn, Dal
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.5
    • /
    • pp.2319-2324
    • /
    • 2012
  • In this paper, the design of asymmetric branch line couplers using artificial dielectric substrate (ADS) is described. The effective permittivity and permeability increase in ADS because of the lots of the inserted via-holes. So the physical length and width of transmission lines realized on ADS are reduced compared to the standard lines. This enables one to design size-reduced microwave circuits. As an instance in this work, an asymmetric branch line coupler with the ratio of 3:1 is designed at 2GHz. The designed coupler has a small size of 53.4% compared to the normal circuit while the same performances are preserved. A good agreement between the simulated and measured asymmetric power dividing ratio is shown. The measured loss is only less than 0.2dB, which is a very small value.

Distribution Line Voltage Impact Analysis of Wind Power Generation System (풍력발전시스템의 배전선로 전압 영향분석)

  • Na, Kyoung-Yun;Ko, Sheng-Min;Kim, Se-Ho;Yi, Sue-Muk;Shin, Sam-Kyun;Kim, Moon-Chan
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1759-1761
    • /
    • 2005
  • The exploitation of the resource wind energy is a rapidly growing area world-wide. The number of installed units is continuously increasing, and therefore, it is important to respect and to deal with the impact of wind power generation system. From the view of an electric grid utility, there is a major problem with the impact of the wind system on the voltage of the electric grid, to which a turbine in connected. The problem is rather common in the connection of a wind power system to an already existing grid, since the grid is very seldom designed for the transmission of additional power. In this paper, it is investigated the voltage impact of distribution line, to which wind power generation system is connected.

  • PDF

A study on line balancing for serial assembly line (직렬 조립라인의 라인밸런싱에 관한 연구)

  • 장석호;이노성;안인석;박승규;최준열;우광방
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10a
    • /
    • pp.1123-1128
    • /
    • 1993
  • In this paper, utilizing the line balancing algorithm proposed to deal with various situations of automated assembly line, the optimal solution can be derived by the branch and bound method of analysis. By the application of line balancing algorithm to telephone assembly line, thoughput is improved by 3.38%. Therefore, in the proposed line, blicking phenomena were reduced and smooth line-flow was achieved, and uniform distribution of utilization rate of each machine is obtained.

  • PDF