• Title/Summary/Keyword: Booster Pump

Search Result 51, Processing Time 0.028 seconds

Development of Pilot Injection Plant for CO2 Underground Storage (이산화탄소 지중저장용 파일럿 주입플랜트 개발)

  • Yoon, Seok-Ho;Kim, Young;Lee, Jun-Ho;Lee, Kong-Hoon
    • Plant Journal
    • /
    • v.9 no.2
    • /
    • pp.42-45
    • /
    • 2013
  • The worldwide issue of greenhouse gas reduction has recently drawn great attention to carbon capture and storage(CCS). In this study, we developed a 10,000 ton/year pilot injection plant for geological storage of carbon dioxide. Major components of the pilot plant include a pressure pump, a booster pump, and an inline heater to bring liquid carbon dioxide into its supercritical state. The test results show that the pilot plant readily achieves the injection pressure and temperature, showing satisfactory control performance. The overall power consumption is 2,000 ~ 2,500 W, more than 75% of which consumed by the pressure pump. This study will facilitate varied research on greenhouse gas reduction as the only domestically developed system for geological injection.

  • PDF

A Power Management Unit for Solar Energy Harvesting (빛 에너지 하베스팅을 위한 전력관리회로)

  • Yoon, Eun-Jung;Hwang, In-Ho;Park, Jong-Tae;Yu, Chong-Gun
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2012.10a
    • /
    • pp.267-271
    • /
    • 2012
  • In this paper a power management unit for solar energy harvesting is proposed. If solar energy is sufficient, Power Management Unit(PMU) directly supplies load with solar energy. By contrast, if solar energy is insufficient to operate sensor nodes, voltage booster(VB) boosts the solar cell's output voltage, and then PMU supplies load with the harvested energy. The designed circuit had been fabricated using a 018um CMOS process. In the first case, the PMU supplies load with more energy than in the second case. In the second case where a VB is used, the PMU operates to supply load with solar energy even when illumination is low and minimum solar cells with very low output voltage are used.

  • PDF

Construction and Tests of the Vacuum Pumping System for KSTAR Current Feeder System (KSTAR 전류전송계통 진공배기계 구축 및 시운전)

  • Woo, I.S.;Song, N.H.;Lee, Y.J.;Kwag, S.W.;Bang, E.N.;Lee, K.S.;Kim, J.S.;Jang, Y.B.;Park, H.T.;Hong, Jae-Sik;Park, Y.M.;Kim, Y.S.;Choi, C.H.
    • Journal of the Korean Vacuum Society
    • /
    • v.16 no.6
    • /
    • pp.483-488
    • /
    • 2007
  • Current feeder system (CFS) for Korea superconducting tokamak advanced research(KSTAR) project plays a role to interconnect magnet power supply (MPS) and superconducting (SC) magnets through the normal bus-bar at the room temperature(300 K) environment and the SC bus-line at the low temperature (4.5 K) environment. It is divided by two systems, i.e., toroidal field system which operates at 35 kA DC currents and poloidal field system wherein 20$\sim$26 kA pulsed currents are applied during 350 s transient time. Aside from the vacuum system of main cryostat, an independent vacuum system was constructed for the CFS in which a roughing system is consisted by a rotary and a mechanical booster pump and a high vacuum system is developed by four cryo-pumps with one dry pump as a backing pump. A self interlock and its control system, and a supervisory interlock and its control system are also established for the operational reliability as well. The entire CFS was completely tested including the reliability of local/supervisory control/interlock, helium gas leakage, vacuum pressure, and so on.

Preliminary Study of Gas Generator After Burning Cycle Engine for Upper Stages (상단용 가스발생기 후연소 싸이클 엔진 기초연구)

  • Moon, In-Sang;Shin, Ji-Chul
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.159-162
    • /
    • 2008
  • In this study, various cycles of liquid rocket engines were surveyed and specifically gas generator after burning cycle was investigated for upper stage motors. The engines for the upper stage can be categorized into three group based on the cycles and propellants at the diagram. Kerosene engines which adapt the gas generator after burning cycle and are located in the region II, are characterized for high combustion pressure and complexity. This cycle usually needs more than two pumps to use the turbine power efficiently. The fuel line can be divided into the gas generator line and the combustor line, and only the gas generator line is need to be pressured more because the combustion pressure in the gas generator is much higher than that of the combustor. Basically, all the oxidizer goes into the gas generator and than to the combustor, thus the auxiliary LOx pump is not critically necessary. However, for the various reasons, the LOx line requires a booster pump. A gas generator after burning cycle engines produces relatively high specific impuls than that of the open cycle engines. Thus it is suitable for upper stages of launch vehicles.

  • PDF

Study on Vacuum Pump Monitoring Using Adaptive Parameter Model (적응형 인자 모델을 이용한 개선된 진공펌프 상태진단에 관한 연구)

  • Lee, Kyu-Ho;Lee, Soo-Gab;Lim, Jong-Yeon;Cheung, Wan-Sup
    • Journal of the Korean Vacuum Society
    • /
    • v.20 no.3
    • /
    • pp.165-175
    • /
    • 2011
  • This paper introduces statistical features observed from measured batch data from the multiple operation state variables of dry vacuum pumps running in the semiconductor processes. The amplitude distribution characteristics of such state variables as inlet pressures, supply currents of the booster and dry pumps, and exhaust pressures are shown to be divided into two or three distinctive regions. This observation gives an idea of using an adaptive parametric model (APM) chosen to describe their statistical features. This modelling, in comparison to the traditional dynamic time wrapping algorithm, is shown to provide superior performance in computation time and memory resources required in the preprocessing stage of sampled batch data for the diagnosis of running dry vacuum pumps. APM model-based batch data are demonstrated to be very appropriate for monitoring and diagnosing the running conditions of dry vacuum pumps.

The Replacement Plans for Aged Public Water Supply Pipes in Apartment Buildings : Especially Apartment Buildings in Bucheon (공동주택의 노후 급수관 개선방안에 관한 연구 : 부천시 공동주택을 중심으로)

  • Lee, Yong-Hwa;Heo, Yong-Chul
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.4
    • /
    • pp.228-232
    • /
    • 2015
  • The water supply galvanized steel pipes of apartment buildings in Bucheon city constructed with building permission before 1994 have many problems such as leaks, the water containing rust, and low water pressure due to corrosion. Therefore, this study aims to find a way to renew the water supply pipes under investigation through a survey. As a result, when replacing the galvanized steel pipe with the corrosion-resistant pipe, the water supply system should also be changed from the gravity tank system to the booster pump system and the hygienic water storage tank. It is necessary to redraft the long-term repair plan including the replacement of the water supply system. Also, it is necessary to save the allowance reserve according to the modified long-term repair plan.

A Study on the Transition & Expectation through Survey for Existing Building and Engineer's Opinion (기존 사무소 건물 및 설비전문가 조사를 통한 설비시스템의 변화와 전망에 대한 연구)

  • Lee, Gwan-Ho;Kim, Nam-Gyu;Park, Jin-Chul;Rhee, Eon-Ku
    • Journal of the Korean Solar Energy Society
    • /
    • v.25 no.2
    • /
    • pp.63-69
    • /
    • 2005
  • This study is the survey of a transition procedure of building services systems(heat source, HVAC, water supply) through the survey of existing office buildings, building design documents. The preference & major consideration of system selection is the engineer's opinions. The results of this survey can be used in selection of building services system design. In this survey, "Hot & cold water generator system" and "single duct CAV+FCU system", "Elevated water tank system" are selected. The most important consideration in system selection is the energy saving in heat source system, and comfort in HVAC system, and water pressure in water supply system. They prefer "steam boiler+absorption chiller system" for heat source system, "steam boiler+ice thermal storage system", "hot & cold water generator system", "district heating+absorption chiller system" : "single duct CAV+FCU system" and "single duct VAV+convector system" for HVAC system: and "booster pump system" for water supply system.

Numerical Analysis of the Energy-Saving Tray Absorber of Flue-Gas Desulfurization Systems (배연탈황설비의 에너지 절약형 트레이 흡수탑에 대한 수치 해석적 연구)

  • Hwang, Jae-Min;Choi, Ssang-Suk;Chung, Jin-Taek
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.34 no.8
    • /
    • pp.775-782
    • /
    • 2010
  • This study is performed to study the effect of the tray in the absorber of a flue-gas desulphurization (FGD) system by using a computational fluid dynamic (CFD) technique. Stagnant time of slurry and the pressure drop in the FGD absorber increase when a tray is used in the absorber. Stagnant time of slurry results in an increase in the desulfurization effect and a decrease in the power of the absorber recirculation pump; however, increased pressure drop requires more power of booster fan in the FGD system should be increased. The gas and slurry hydrodynamics inside the absorber is simulated using a commercial CFD code. The continuous gas phase has been modeled in an Eulerian framework, while the discrete liquid phase has been modeled by adopting a Lagrangian approach by tracking a large number of particles through the computational domain. It was observed that the power saved upon increasing the stagnant time of slurry was more than increased power with pressure drop.

Development of Optimal Network Model for Conjunctive Operation of Water Supply System with Multiple Sources (다수원 상수도시스템 연계운영을 위한 최적 네트워크 모형 구축)

  • Ryu, Tae-Sang;Ha, Sung-Ryong;Cheong, Tae-Sung
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.12
    • /
    • pp.1001-1013
    • /
    • 2011
  • Development of an optimal water supply system considering water quantity, quality, and economical efficiency is needed to decide optimal available area by combine water supply systems in overlapped area where are more than 2 water sources. The EPAnet and the KModSim were coupled to develop optimal network model. The developed network model was calibrated by measured data from water supply system in Geoje City, Korea in 2007 which have three water sources such as Sadeong booster pumping station, Guchun dam reservoir and Yoncho dam reservoir. The optimum network model was validated by operating results of 2011 to assess the economically optimized service area and optimal pump combination under the given hydraulic operating rules developed in this study. The developed model can be applied into designing water supply systems and operating rules for the conjunctive operation since the model can give the optimal solution satisfied with water quantity, economical efficiency and quality.

Influence of Pressure Reducing Valves on Flow Characteristics of the Water Supply System for an Apartment Complex (공동주택단지 급수계통의 유량특성에 미치는 감압밸브의 영향)

  • Kim, Tae Jin;Cha, Dong Jin
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.23-28
    • /
    • 2012
  • Pressure distribution in the water supply system of an apartment complex consisting of 12 buildings and 635 units in total have been investigated numerically. The complex incorporates two zone booster pump system, and around a half of units have pressure reducing valves (PRVs) in them. Calculated hydrostatic pressure without the water flow were compared with their designed and measured counterparts, and they agreed quite well with each other. Then, the pressure and volumetric water flow rate at all units were analyzed, indicating that there are noticeable differences in pressure and flow rate in one unit to another, although the aforementioned minimization technologies of pressure deviation were employed. In order to further reduce the difference in the water flow rate, it is suggested that all the units in the complex have PRVs installed in their water supply system. The effect of setting pressure of the PRVs on the non-uniformity of the flow in each unit and on the reduction of total water supply for the apartment complex have been studied. With the same PRV setting pressure of 3.952 bar (or the gauge pressure of $3.0kg_f/cm^2$), it has been estimated that the suggested system improves the non-uniformity (the coefficient of variation) of the flow rate of apartment complex over the current system, from 8.02% to 6.66%, and reduces the total water supply, from $0.02804m^3/s$ to $0.02766m^3/s$.