Blasting Utilizing Non-electric Detonator and Its Principle Planning and Operation (비전기 뇌관의 발파와 기본 설계 및 시공)

  • Choi Young-Cheon
    • Explosives and Blasting
    • /
    • v.22 no.4
    • /
    • pp.23-29
    • /
    • 2004
  • Non-electric detonator was developed to improve the blasting efficiency of electric detonator. It is increasingly utilized in surface and tunnel blasting due to its safety in external electric shock, precise delayed time, and decrease in blasting vibration and noise. The paper describes the detonating system of non-electric detonator, principle operating and planning methods, and case history so that it can be contributed to improve blasting technology.

A Comparison of Operation Time between the Standard of Estimate and Actual Operations in Tunnel Blasting (터널발파시 실제 작업시간과 품셈의 비교 분석)

  • Kim, Yang-Kyun;Kim, Hyung-Mok
    • Explosives and Blasting
    • /
    • v.33 no.3
    • /
    • pp.14-20
    • /
    • 2015
  • Tunnel blasting that plays the most important role in the construction of a drill & blast tunnel, shows a big difference in operation time according to various factors such as rock mass quality, tunnel dimension, machine performance, and the skill level of tunnel crews. This paper analyzes the differences between the time calculated by the standard of estimate and actual operation time based upon field investigations on blasting operation time in three tunnels of Korea. The result shows that actual blasting time is generally about 8%~16% less than the standard of estimate in cases that normal operations are performed. If the time delayed by unforeseen situations is included, however, it is presumed that the number of cases that actual operation time exceeds the standard of estimate are considerable. This study aims to help make a judgement over the appropriacy of the standard of estimate through continuous investigations on actual operation time, as well as improve the productivity of tunnel excavation.

Study of the Blast Pattern to Improve the Effect on Fragmentation in a Small Sized Silica Mine in Korea (국내 소규모 규석광산의 파쇄효과 향상을 위한 발파패턴 연구)

  • Yang, Hyung-Sik;Kim, Jeong-Gyu;Ko, Young-Hun;Kim, Seung-Jun;Mun, Hee-Sook;Kim, Won-Beom;Jang, Hyong-Doo
    • Explosives and Blasting
    • /
    • v.30 no.1
    • /
    • pp.52-59
    • /
    • 2012
  • Fragmentation is one factor to affect productivity and economic efficiency of mine. Authors investigate the blasting pattern and improve it step by step while observing the fragmentation results. Final pattern was suggested and the fragmentation improved 24 % compared to traditional pattern, with 50 % is passing rate.

A Numerical Study on the Reduction Effect of Blasting Vibration with Cut Method (심발공법에 따른 발파진동 저감효과에 대한 수치해석적 연구)

  • Son, Ji-Ho;Kim, Byung-Ryeol;Lee, Seung-Joong;Kim, Nam-Soo;Lee, Hyo;Choi, Sung-Oong
    • Explosives and Blasting
    • /
    • v.37 no.1
    • /
    • pp.1-13
    • /
    • 2019
  • The repeated blasting vibration, which is induced commonly in NATM excavation site, can cause a severe damage to the nearby facilities. It is known that the most effective method for reducing blasting vibration includes the use of electronic detonator, deck charge and change of cut method, and so forth. In order to analyze the effect of blasting vibration reduction, in this study, three-dimensional FDM (Finite Difference Method) program FLAC3D has been used for reflecting the blasting hole, delayed time and charging amount. Also the numerical analysis has been performed by applying a dynamic load to each blasting hole. The cut method has been applied with several methods, such as V-cut and Double-drilled parallel cut, which are common in tunnel construction sites. Also, the field test blasting has been carried out in order to compare the measured data with results of numerical analysis. It was shown that the numerical analysis and the field measurement coincide well.

Prediction of Principal Frequency of Ground Vibration from Delayed Blasting (지연시차에 따른 발파진동의 주파수 특성 예측)

  • Chung, Doo-Sung;Kang, Choo-Won;Ko, Jin-Seok;Chang, Ho-Min;Ryu, Pog-Hyun
    • Tunnel and Underground Space
    • /
    • v.20 no.2
    • /
    • pp.112-118
    • /
    • 2010
  • Before blasts that can have direct impacts on human bodies or structures, it is necessary to assess impacts of ground vibration. Therefore, frequency has been recognized as an important factor in order to assess impact on ground vibration and damages. There have been many studies on impacts of frequency. But, there have been no studies on relations between vibration and frequency according to delay time difference. In this study, we examined the relations between delay time difference and frequency according to each frequency with which reinforcement and destructive intervention repeat through delay time difference obtained using superposition modeling of single hole blasting waveform based on the theory of time difference developed by Langefors.

Displacement and Stress Monitoring for Excavation Deep Foundation (인접지역의 깊은 터파기 굴착에서 변위 및 응력의 계측)

  • 원연호
    • Explosives and Blasting
    • /
    • v.17 no.1
    • /
    • pp.27-55
    • /
    • 1999
  • The excavation works for deep foundation in urban areas have recently increased complaints of blasting vibration and settlement of ground level. Foundation must be excavated approximately up to 24-28m depths from the surface. The roads and subway line pass through the excavation area. The Dae-chung station is also located at the nearest distance 5-35m from the working site. To protect subway station and adjacient some structures from blasting and settlement, the level of ground vibration, displacements and stress were monitored and analyzed. The results can be summarized as follows ; 1. An empirical particle velocity equation were obtained by test blasts at Nassan Missi 860 Office tel construction site. $V{\;}={\;}K(D/\sqrt{W})^{-n}$, where the values for n and k are estimated tobe 0.371 and 1.551. From this ground vibration equation, the max. charge weight per delay time against distance from blasting point is calculated. Detailed blasting method is also presented. 2. To measure the horizontal displacement in directions perpendicular to the borehole axis, 6 inclinometers installed around working sites. The displacement at the begining was comparatively high because the installation of struts was delayed, but after its installation the values showed a stable trend. Among them, the displacement by 3 inclinometers installed on a temporary parking area showed comparatively high values, for example, the displacement measured at hole No. IC-l recoded the max. 47.04mm for 6 months and at hole No. IC-2 recorded the max. 57.33mm for 7 months. So, all of these data was estimated below a safe standard value 103mm. 3. Seven strain gauge meter was installed of measure the magnitude and change of stress acted on structs. The measured value of maximum stress was $-465{\;}kgf/\textrm{cm}^2,{\;}-338.4{\;}kgf/\textrm{cm}^2,{\;}302.3{\;}kgf/\textrm{cm}^2$ respectively. In compareto the allowable stress level of steel, they are estimated to be safe.

  • PDF

A Survey on the Magnitude of the Sound, Ground Vibration and Properly Delayed Interval of a Plasma Rock-Splitting Machine driven by Electric Shocks (플라즈마 지발 전력충격파암기의 적정 지발시차 및 진동과 소음크기 고찰)

  • Won, Yeon-Ho;Kang, Choo-Won;Kim, Il-Jung
    • Explosives and Blasting
    • /
    • v.27 no.1
    • /
    • pp.7-20
    • /
    • 2009
  • In this study, 5 steps of different delay intervals are applied to a plasma rock-breaking machine that is driven by electric shocks in order to improve the workability of the traditional single-shot type plasma rock-breaking operation. The sequential steps use the electrolyte volume per delay of 1, 2, 3, 4, 5 kg and it has been analyzed to measure the delay time and level of the ground vibration and noise according to exploding. The delay time of the rock-breaking machine by an electric shock of 5 steps has used about 40~50ms at the electrolyte connected from 1 to 3 holes, about 70~80ms at the electrolyte connected from 4 to 5 holes. It is identified that the extents of the ground vibration is low to 1 over 3~6 compared with that of the emulsion explosives.

A Case Study of Minimizing Construction Time in Long and Large Twin Tube Tunnel (대단면 장대터널 공기단축 사례연구)

  • No Sang-Lim;Noh Seung-Hwan;Lee Sang-Pil;Kim Moon-Ho;Seo Jung-Woo
    • Tunnel and Underground Space
    • /
    • v.15 no.3 s.56
    • /
    • pp.177-184
    • /
    • 2005
  • The Sapaesan tunnel, the longest twin tube tunnel (4km) in Korea with 4 lanes each, is under construction with two years of delayed schedule because of the strong opposition from environmental bodies. Therefore, maximizing the construction efficiency was needed in tunnel project to compensate for time delay. This study includes improvements in the construction of the Sapaesan tunnel such as increasing excavation length and changing excavation sequence. In this paper the system for predicting tunnel face ahead is also introduced. Bulk-Emulsion explosive and Cylinder-Cut method were adopted in tunnel blasting to increase the excavation length. Optimum tunnel excavation step was designed to make up delayed time. Tunnel foe mapping, TSP survey and geological prediction system using computerized jumbo-drill were performed fnr safe construction of long and large twin tube tunnel.

System Analysis of Dust Concentration at the Field of Tunnel Excavation (터널 굴착시 작업현장의 분진농도 실태조사)

  • Park, Jong-Soon;An, Dae-Hyun;Shim, Myeong-Jin;Jung, Ji-Seung;You, Jin-O;Um, Myeong-Heon;Kim, Jae-Yong
    • Applied Chemistry for Engineering
    • /
    • v.18 no.2
    • /
    • pp.126-129
    • /
    • 2007
  • In order to ruduce traffic-jam, it is requested to extend road. As a result, the construction of tunnels is inevitable considering our mountatinous topography. In tunnel construction work, major contamination materials occur from rock drilling, blasting rock, rock transporting, and short-creat. After rock blasting, a very high concentration of particles over $5000{\mu}g/m^3$ is maintained for 4 h when air is supplied by pans, by which the construction work has to be delayed at least 30 min. Although dry dust collectors are used, the effective operation time span is limited to 3 h. In this work, the behavior of particles in air and use of particle removal instruments are investigated. As a result, it was important to compare efficiencies of dry and hydro dust collectors.

Experimental and Numerical Approach foy Optimization of Tunnel Blast Design (터널 발파설계 최적화를 위한 실험 및 수치해석적 접근)

  • 이인모;김상균;권지웅;박봉기
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.2
    • /
    • pp.75-85
    • /
    • 2003
  • Laboratory model blast and in-situ rock blast tests were conducted to determine blast-induced stress wave propagation characteristics under different explosive types, different loading conditions and different mediums. Dynamic numerical approaches were conducted under the same conditions as experimental tests. Stress magnitudes at mid-point between two blast holes which were detonated simultaneously increased up to two times those of single hole detonation. The rise time of maximum stress in a decoupled charge condition was delayed two times that of a fully charged condition. Dynamic numerical analysis showed almost similar results to blast test results, which verifies the effectiveness of numerical approaches fur optimizing the tunnel blast design. Dynamic numerical analysis was executed to evaluate rock behavior and damage of the contour hole, the sloping hole adjacent to the contour hole in the road tunnel blasting pattern. The rock damage zone of the sloping hole from the numerical analysis was larger than that of the contour hole. Damage in the sloping hole can be reduced by using lower density explosive, by applying decoupled charge, or by increasing distance between the sloping hole and the contour hole.