• Title/Summary/Keyword: Backup system

Search Result 314, Processing Time 0.024 seconds

The Switch Installation Criteria For Satisfying Future Reliability Goal (향후 신뢰도 목표를 만족하는 개폐기 설치 기준 제시)

  • Jo, Nam-Hun;O, Jeong-Hwan;Ha, Bok-Nam;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.9
    • /
    • pp.433-440
    • /
    • 2002
  • The addition of switches to a distribution feeder does, in general, increase reliability by decreasing the duration of the outage of many to the customers on the feeder. To cover its service area so that feeder-level delivery reaches sufficiently close to all customers, feeders typically split their routes many times, in what is often called a lateral feeder. It is interesting to note, however, that the effectiveness of a switch is very much dependent on the types of lateral feeder. The types of lateral are classified into two types. The first is loop lateral feeder that can connect its load to an adjacent feeder through a tie line in case that a fault occurs in its feeder and it is laid out so that every feeder has complete fault backup through re-switching of its loads to other sources like a main feeder The second is the radial lateral feeder cannot connect its load to an adjacent line, no provision is made for contingency backup of feeders. There are no other circuits in the radial lateral feeder form which to restore power. In this study, we evaluate the effectiveness of a switch installation between on the radial and loop lateral feeders to increase reliability by decreasing the duration of the outage. These results can help power utility to design the switch layouts on the radial and loop lateral feeder system.

Efficient Replication Protocols for Mobile Agent Systems (이동 에이전트 시스템을 위한 효율적인 중복 프로토콜)

  • Ahn, Jin-Ho
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.33 no.12
    • /
    • pp.907-917
    • /
    • 2006
  • In this paper, we propose a strategy to improve fault-tolerance and scalability of replicated services in mobile agent systems by applying an appropriate passive replication protocol for each replicated service according to whether the service is deterministic or non-deterministic. For this purpose, two passive replication protocols, PRPNS and PRPDS, are designed for non-deterministic and deterministic services respectively. They both allow visiting mobile agents to be forwarded to and execute their tasks on any node performing a service agent, not necessarily the primary agent. Especially, in the protocol PRPDS, after a backup service agent has received each mobile agent request and obtained its delivery sequence number from the primary service agent, the backup is responsible for processing the request and coordinating with the other replica service agents. Therefore, our strategy using the two proposed protocols can promise high scalability of replicated services a large number of mobile agents attempt to access in mobile agent systems. Our simulation results show that the proposed strategy performs much better than the one using only the traditional passive replication protocol.

A Study on the Implementation of Integrated Management System for CATV Network (CATV망 관리를 위한 통합관리 시스템 구현 사례 연구)

  • 곽윤식
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.7 no.5
    • /
    • pp.1082-1088
    • /
    • 2003
  • This study is about the development of a system related to the CATV network. It intends to develop an automatically centralized Headend system and a distributive system to remove the ineffectiveness of the established manual system. To achieve this goal, we took a put of bandwidth, which is not used for the transmission of video signals in the established frequency bandwidth, and used it for the transmission and receiver of controlling signals. By this way we could design a system of transmission and receiver and a automatic distributive system. We developed an information management system for the 9600bps CATV using RS-232 of forward/backward communication and backward communication. Based on window, It consist of ID generation, transmitter/receiver, control and backup part.

Reliability analysis of nuclear safety-class DCS based on T-S fuzzy fault tree and Bayesian network

  • Xu Zhang;Zhiguang Deng;Yifan Jian;Qichang Huang;Hao Peng;Quan Ma
    • Nuclear Engineering and Technology
    • /
    • v.55 no.5
    • /
    • pp.1901-1910
    • /
    • 2023
  • The safety-class (1E) digital control system (DCS) of nuclear power plant characterized structural multiple redundancies, therefore, it is important to quantitatively evaluate the reliability of DCS in different degree of backup loss. In this paper, a reliability evaluation model based on T-S fuzzy fault tree (FT) is proposed for 1E DCS of nuclear power plant, in which the connection relationship between components is described by T-S fuzzy gates. Specifically, an output rejection control system is chosen as an example, based on the T-S fuzzy FT model, the key indicators such as probabilistic importance are calculated, and for a further discussion, the T-S fuzzy FT model is transformed into Bayesian Network(BN) equivalently, and the fault diagnosis based on probabilistic analysis is accomplished. Combined with the analysis of actual objects, the effectiveness of proposed method is proved.

The Implementation of Integration Management System for CATV Network (CATV망을 위한 통합 관리 시스템 구현)

  • 김인호;곽윤식;김윤호;류광렬
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2003.05a
    • /
    • pp.179-182
    • /
    • 2003
  • This study is about the development of a system related to the CATV network. It intends to develop an automatically centralized Headend system and a distributive system to remove the ineffectiveness of the established manual system. To achieve this goal, we took a part of bandwidth, which is not used for the transmission of video signals in the established frequency bandwidth, and used it for the transmission and receiver and a automatic distributive system. We developed an information management system for the 9600bps CATV using RS-232 of forward/backward communication and backward communication. Based on window, It consist of ID generation, transmitter/receiver, control and backup part.

  • PDF

Design of a Prototype Fibre Optic Based Monitoring and Control System for Future KEPCO's 765kV Substation (765kV 변전소 감시제어용 시범시스템)

  • Jiang, Moon-Myung;Chung, Sang-Jin;Choi, Jong-Hyoub;Park, Jong-Myung
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.883-886
    • /
    • 1996
  • Instead of point-to-point hard wiring between substation yard equipments and SCADA RTU(Remote Terminal Unit), fibre optic cable will be used in the portion between Local Units and Central Unit in the future KEPCO 765kV substation. The connections between substation yard equipments and nearby Local Unit remain the same hard wiring. The new fibre optic system will provide security especially during ground faults and is immune to electrical noise. A prototype system will be manufactured and installed in the existing 154kV Yeosan Substation by the end of July this year and operated for one year. By incorporating the operation experiences acquired in the system, an improved system will be commercially applied to 765kV Shin-An-Seong Substation where 345kV GIS will be installed initially and act as the switching station in the year 1998. The system is composed of one Central Unit and several Local Units. The Central Unit is composed of two workstation level computers, one is in operation and the other backup, and a Communication Control Unit. The Local Unit uses the existing SCADA RTU technology and takes the form of a distributed one. Between the Communication Control Unit and Local Units, the fibre optic system with star-coupler is used.

  • PDF

Operation optimization of auxiliary electric boiler system in HTR-PM nuclear power plant

  • Du, Xingxuan;Ma, Xiaolong;Liu, Junfeng;Wu, Shifa;Wang, Pengfei
    • Nuclear Engineering and Technology
    • /
    • v.54 no.8
    • /
    • pp.2840-2851
    • /
    • 2022
  • Electric boilers (EBs) are the backup steam source for the auxiliary steam system of high-temperature gas-cooled reactor nuclear power plants. When the plant is in normal operations, the EB is always in hot standby status. However, the current hot standby operation strategy has problems of slow response, high power consumption, and long operation time. To solve these problems, this study focuses on the optimization of hot standby operations for the EB system. First, mathematical models of an electrode immersion EB and its accompanying deaerator were established. Then, a control simulation platform of the EB system was developed in MATLAB/Simulink implementing the established mathematical models and corresponding control systems. Finally, two optimization strategies for the EB hot standby operation were proposed, followed by dynamic simulations of the EB system transient from hot standby to normal operations. The results indicate that the proposed optimization strategies can significantly speed up the transient response of the EB system from hot standby to normal operations and reduce the power consumption in hot standby operations, improving the dynamic performance and economy of the system.

Design and Implementation of Automatic Installation System for PDA (휴대 정보터미널을 위한 애플리케이션 자동설치 시스템의 설계 및 구현)

  • 나승원;오세만
    • The Journal of Society for e-Business Studies
    • /
    • v.8 no.3
    • /
    • pp.165-176
    • /
    • 2003
  • Instead of existing cell phones, PDAs are observed as leading wireless Internet devices recently Numerous applications are developed by extended usage of PDAs and it should be installed appropriately according to devices. Furthermore, when battery is discharged, all data stored in RAM(Random Access Memory) becomes obsolete. So it should be recovered or reinstalled from flash memory, backup media or something. In this paper, we present an automatic application installation system(PAIS : PDA Automatic Installation System) to solve problems that users have to install applications by themselves whenever it is necessary. With this system, users feel comfortable by saving time and effort to install each applications and application development companies save cost needed to make materials illustrating installation process. Consequently PAIS may flourish wireless Internet business.

  • PDF

PSPICE Modeling of Solar Cells for Use in Emergency Power System (비상발전용 전원으로 사용하기 위한 태양전지의 PSPICE 모델링)

  • Baek, Dong-Hyun;Song, Ho-Bin
    • Fire Science and Engineering
    • /
    • v.24 no.2
    • /
    • pp.52-57
    • /
    • 2010
  • Power supply to the motor using the emergency power system is being used. However, this system is rarely used except during emergency power is not inefficient. On the other hand, the use of solar power systems Emergency backup power supply as well as in normal maintenance savings, as many have benefits. In this paper, general-purpose simulator PSPICE simulations performed using the PV system to be used in the various models made by the library. In addition, for use as an emergency power generation solar power system design, modeling and analysis of the characteristics and practical use make an effective device was confirmed.

A Study on the Remote Monitoring and Control of Ship's Emergency Lighting System (선박 비상조명 원격 모니터링 제어)

  • Yang, Hyun-Suk;Kim, Kun-Woo;Lim, Hyun-Jung;Moon, Jung-Pil;Lee, Sung-Geun;Kim, Yoon-Sik
    • Proceedings of the KIPE Conference
    • /
    • 2005.07a
    • /
    • pp.207-210
    • /
    • 2005
  • This paper describes a design of several ship's emergency lighting system(SELS) that power factor is improved and power is controlled extensively, and techniques to control and monitor this system in remote distance by PC serial communication. The remote monitoring control system is composed of emergency power supply system (EPSS), half bridge(HB)inverter, fluorescent lamp(FL), microprocessor, multi communication interface. EPSS checks the voltage of the emergency backup battery in real time. In case that the voltage of 13[V] or less has been detected for 5[msec] or longer for 3 times in a row, charger circuit is connected for battery charging. Experimental works using proposed system confirm that speedy and stable power to be supplied when main power source cut-off, compared with conventional analog type, and input power up to 35.0[%] by adjusting of pulse frequency of the HB inverter.

  • PDF