• Title/Summary/Keyword: Back Calculation

Search Result 273, Processing Time 0.021 seconds

Back Tracing Calculation Method for the Leakage Detection in Water Distribution System (상수관망에서 누수탐지를 위한 역추적계산법)

  • Kwon, Hyuk Jae
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.5
    • /
    • pp.611-619
    • /
    • 2013
  • In this study, Back Tracing Calculation Method was developed to determine the leakage location and leakage amount. Previously developed determination method of monitoring location and newly developed Back Tracing Calculation Method were applied to the sample pipe network and real size pilot plant. After leakage was assumed in the pilot plant, leakage location and leakage amount could be traced by Back Tracing Calculation Method. From the results, it was found that Back Tracing Calculation Method can be applied for the leakage detection in water distribution system. Furthermore, this method can be applied for the pressure management or leakage detection as a pressure control method in water distribution system.

Back Analysis of the Earth Wall in Multi-layered Subgrade (다층지반에 근입된 흙막이 벽의 역해석에 관한 연구)

  • 이승훈;김종민;김수일;장범수
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.1
    • /
    • pp.71-78
    • /
    • 2002
  • This paper presents a back-calculation technique leer the prediction of the behavior of earth wall inserted in multi-layered soil deposit. The soil properties are back-calculated from the measured displacement at each construction stage and the behavior of earth wall far the next construction stage is predicted using back-calculated soil properties. For multi-layered soil deposit, the back-calculation would be very difficult due to the increase in the number of variables. In this study, to solve this difficulty, the back-calculation was performed successively from the lowest layer to the upper layers. An efficient elasto-plastic beam-column analysis was used for forward analysis to minimize the computation time of iterative back-calculation procedure. The coefficients of subgrade reaction and lateral earth pressure necessary for the formation of p-y curve were selected as back calculation variables, and to minimize the effect of abnormal behavior of the wall which might be caused by any unexpected action during construction, the difference between measured displacement increment and computed displacement increment at each construction stages is used as the objective function of optimization. The constrained sequential linear programming was used for the optimization technique to found values of variables minimizing the objective function. The proposed method in this study was verified using numerically generated data and measured field data.

Back calculation and solution Technique of E-modulus by FWD′s deflection data in Pavement (FWD 처짐치에 의한 포장층 탄성계수 역산 및 해석기법)

  • 위성동
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.188-200
    • /
    • 2002
  • In this study, a pavement evaluation method is introduced by a case study of the measurement data obtained in Incheon International Airport. Based on the results obtained by both visual inspection and automobile inspection equipments, the pavement surface condition is evaluated and used for maintenance and rehabilitation strategy for pavement. In addition, the special attention was given to the back calculation and solution technique of E-modulus by FWD's deflection data in Pavement.

  • PDF

Prediction of HIV and AIDS Incidence Using a Back-calculation Model in Korea (후향연산 모형 (Back-calculation model)을 이용한 국내 HIV 감염자와 AIDS 환자의 추계)

  • Lee, Ju-Young;Goh, Un-Yeong;Kee, Mee-Kyung;Kim, Jee-Yun;Hwang, Jin-Soo
    • Journal of Preventive Medicine and Public Health
    • /
    • v.35 no.1
    • /
    • pp.65-71
    • /
    • 2002
  • Objective : To estimate the status of HIV infection and AIDS incidence using a back-calculation model in Korea. Methods : Back-calculation is a method for estimating the past infection rate using AIDS incidence data. The method has been useful for obtaining short-term projections of AIDS incidence and estimating previous HIV prevalence. If the density of the incubation periods is known, together with the AIDS incidence, we can estimate historical HIV infections and forecast AIDS incidence in any time period up to time t. In this paper, we estimated the number of HIV infections and AIDS incidence according to the distribution of various incubation periods Results : The cumulative numbers of HIV infection from 1991 to 1996 were $708{\sim}1,426$ in Weibull distribution and $918{\sim}1,980$ in Gamma distribution. The projected AIDS incidence in 1997 was $16{\sim}25$ in Weibull distribution and $13{\sim}26$ in Gamma distribution. Conclusions : The estimated cumulative HIV infections from 1991 to 1996 were $1.4{\sim}4.0$ times more than notified cumulative HIV infections. Additionally, the projected AIDS incidence in 1997 was less than the notified AIDS cases. The reason for this underestimation derives from the very low level of HIV prevalence in Korea, further research is required for the distribution of the incubation period of HIV infection in Korea, particularly for the effects of combination treatments.

Leakage experiments and applications of leakage detection algorithm in the pilot plant of water distribution system (상수관망 파일럿플랜트에서의 누수실험 및 누수탐지 알고리즘의 적용)

  • Kwon, Hyuk Jae
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.9
    • /
    • pp.609-616
    • /
    • 2017
  • In this study, algorithm for the selecting the optimum monitoring location and leakage detection algorithm based on back tracing calculation method were developed and verified by the experiments in pilot plant of water distribution system. First of all, optimum monitoring locations were selected and pressure changes were measured due to artificial leakage by pressure gauges in pilot plant. Simulations of leakage detection was performed for the verification of back tracing calculation method as a leakage detection method. From the results, it was found that leakage locations and leakage amount were exactly estimated. Various leakage amount from $0.0005m^3/s$ to $0.0018m^3/s$ were reproduced and leakage location was detected by back tracing calculation method. It was verified that back tracing calculation method as a leakage detection method is effective.

Study on Solid Propellant Grain Burn-back Analysis Using Analytical Method (Analytical Method를 이용한 고체 추진제 그레인의 Burn-back 연구)

  • Sohn, Jihyun;Jang, Jinsung;Oh, Seokhwan;Roh, Taeseong
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.18 no.3
    • /
    • pp.40-47
    • /
    • 2014
  • The grain burn-back analysis has been performed for the internal ballistics analysis code to be used for the optimal design of the space launch vehicles. The grain burn-back has been used to calculate the burning surface that is essential to the internal ballistics. The calculation of internal ballistics code used in the optimal design is repeated until satisfying the required performance through the change of the design parameter. Therefore, the burn-back method applied to the internal ballistics analysis should be easy to change the design parameter and calculation time should be short. In this study, a burn-back analysis code has been developed using the analysis method. Also, geometric parameters of the grain have been selected and organized. The developed code has been verified by comparison of results of a numerical method.

An Evaluation Method of Deformation Moduli using Finite Element Analysis of Cyclic Plate Load Tests (반복재하 평판재하시험의 유한요소해석을 이용한 변형계수의 추정기법)

  • Oh, Seboong;Seo, Wonseok;Kwon, Ohkyun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.6
    • /
    • pp.61-68
    • /
    • 2007
  • The problem on cyclic plate load tests was analyzed by finite element method using an anisotropic hardening constitutive model. The constitutive model was coded to user subroutine in ABAQUS. Using the result of the analysis, Young's moduli corresponding to various strain levels were evaluated by a back calculation method and were very similar to those of input. On the basis of the back calculation method plate loading tests were verified. As a result, deformation moduli could be evaluated practically from cyclic plate load tests with respect site conditions.

  • PDF

Gain Optimization of Kinematic Control for Wire-driven Surgical Robot with Layered Joint Structure Considering Actuation Velocity Bound (와이어로 구동하는 적층형 다관절 구조를 지닌 수술 로봇의 구동 속도를 고려한 기구학적 제어기의 게인 최적화)

  • Jin, Sangrok;Han, Seokyoung
    • The Journal of Korea Robotics Society
    • /
    • v.15 no.3
    • /
    • pp.212-220
    • /
    • 2020
  • This paper deals with a strategy of gain optimization for the kinematic control algorithm of a wire-driven surgical robot. The proposed controller consists of the closed-loop inverse kinematics with the back-calculation method. The closed-loop inverse kinematics has 18 PID control gains, and the back-calculation method has 6 gains. An efficient strategy is designed to optimize 18 values first and then the remaining 6 values. The optimal gain sets are searched under the step input with performance indices. In this gain optimization, the objective function is defined as the minimum value of signal-to-noise ratio of the performance indices for 6 DoF (Degree-of-Freedom) motion that is based on the Taguchi method, and the constraints are applied to obtain stable responses for each motion evenly. The gain sets obtained are verified by simulations using the test trajectories. In comparative results, the optimal gain value based on the performance index combined with ISE (integral of square error) and settling time showed the best control performance.

Direct Torque Control of Brushless DC Motor (브러시리스 DC 전동기의 직접 토오크 제어)

  • Kang, Seog-Joo;Sul, Seung-Ki
    • Proceedings of the KIEE Conference
    • /
    • 1994.07a
    • /
    • pp.475-478
    • /
    • 1994
  • In this paper two methods of torque control for brushless DC motor with non-ideal trapezoidal back EMF are presented. One is the method of modulating the reference current so as to give a constant torque since the torque is given by the back EMF and the. phase currents. And the current control loop includes the feedforward control of back EMF and of the neutral voltage between the neutral points of the inverter and of the machine. The other is a direct voltage calculation algorithm for a given reference torque. In the two methods, the time delay due to the calculation is compensated by one sampling current prediction. The simulation results are presented to verify the proposed methods.

  • PDF

The Comparison of thrust computational methods of a brushless DC linear motor (브러시 없는 직류 선형 모터의 추력 계산 방법의 비교)

  • Choi, Moon-Suk;Kim, Yong-Yil
    • Proceedings of the KIEE Conference
    • /
    • 1997.11a
    • /
    • pp.32-34
    • /
    • 1997
  • For a given brushless DC linear motor, we suggest the numerical prediction methods to analyze it's thrust characteristics. First, we calculate the magnetic flux density by the finite element method, and we then compute the maximum thrust with three computational methods - a Lorentz equation, a Maxwell stress method and a virtual work method. To confirm the accuracy of the computational methods, we measure the thrust of the linear motor made by our laboratory with a force-torque sensor. Also, we calculate the thrust by the measured back electromotive force. To choose the appropriate method for a specified application, we compare the maximum thrusts of the computational method and the calculation by the back electromotive force with the measured one. We conclude that the Maxwell stress method is turned out the best because it has the most accurate results among three computational methods and it is more convenient than the calculation method by the back electromotive force.

  • PDF