• Title/Summary/Keyword: BTL 사업

Search Result 138, Processing Time 0.023 seconds

A Study on Evaluation of Optimal Construction Method of BTL Projects - Focused on Educational Facilities - (BTL 적용 교육시설의 최적 건축공법 평가에 관한 연구)

  • Park, Yoo-Young;Cho, Bong-Ho;Kim, Ki-Hyun;Lee, Chun-Kyong;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.22-31
    • /
    • 2009
  • In the buildings of educational facilities ordered by BTL projects, the competent authorities, private business, and users of school get to have a deep conflict, due to extra expenses resulted from shortening of construction period and establishment of temporary school building, and inconveniences users of school have to undergo during semester. This study aims at solving immediate problems in the aspect of construction method, proposing several alternative plans, including RC construction method generally applied to construction of the existing school, and modular construction method that is emerged as an alternative method for educational facilities lately, along with the method of construction appropriate for BTL projects of educational facilities, calculating cost of construction required for each alternative plan, analyzing and evaluating period of construction.

A Study on Diversification of Financing Method for BTL Private Participation in Infrastructure by Introduction of ABS (자산유동화증권 도입을 통한 BTL 민간투자사업에서의 재원 조달 다양화 방안 연구)

  • Park, Young-Min;Kim, Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.378-383
    • /
    • 2006
  • This study presents the results from an investigation into ABS to revitalize small and medium construction enterprises, and to analyze merits and demerits of ABS introduction using sensitivity analysis some realistic cases. According to some available procedures, this study suggests ABS introduction structure of new education facilities construction in BTL projects of two different types. In order to analyze the effectiveness of introduction, a model was built as new education facilities construction in this paper. In addition, this study tried to put a figure on finance interest changes by analyzing changes for earning rates and money that payed by the government. Moreover, this study also presents merits and demerits of ABS introduction.

  • PDF

Architectural Work Cost Rate Analysis of Elementary, Middle, and High School Delivered by BTL (초·중등학교 민간투자사업(BTL)의 건축공사비의 공종별 비율 분석)

  • Ryu, Hanguk;Kim, Hyungeun
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.14 no.1
    • /
    • pp.1-9
    • /
    • 2015
  • The accurate estimation of construction cost is critical for effective budgeting and financing of the project. Accurate estimates also allow for informed decisions when considering the responsiveness of bids or proposals and for a contractor to better monitor construction progress. However, current method for construction cost of the public educational facility uses a basic criteria in Korea, e.g, construction cost per unit floor area. Therefore, the purpose of this study is to examine present architectural work cost rate of elementary, middle, and high school delivered by BTL(Build-Transfer-Lease). We examined real construction cost of educational facility according to level of school, such as elementary, middle, and high school. The examination revealed that unit price of BTL educational construction cost are different to the level of school, but the composing rate of architectural work cost of the educational facility are very similar. As a result, it is recommended that future researches are initiated to create specific methods to support the accurate cost estimation of educational facility.

A Study on the Analysis of Issue Items on Negotiation Stage of Build Transfer Lease Project (건축분야 임대형 민자사업 협상단계 쟁점 분석에 관한 연구)

  • Park, Yeong-Cheol;Lee, Gun;Lee, Hyun-Chul;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.57-66
    • /
    • 2009
  • This study aimed to find major issues on negotiations of the BTL project, to analysis the degree, and to investigate the underlying cause and propose solutions. Data were collected from authorities in charge and the companies which have participated in BTL projects. Also, the weights of major issues were analyzed using Analytic Hierarchy Process method(AHP), which uses pair-wise comparison between variables, and the degree of them were listed in the quantitative way. As a result, 4 part had each 2 reasons and others had one reason among 6 negotiation parts of first step. In addition, the solutions were indicated.

A Life Cycle Cost Case Analysis on the Build-Transfer-Lease(BTL) Projects of School (학교 임대형민자사업(BTL)의 LCC 사례 분석)

  • Cho, Seung-Yun;Ahn, Jang-Won;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.145-150
    • /
    • 2007
  • This study is a LCC case analysis on the school one of the BTL projects which is constructed by private organizations and rented to government. According to the RFP to make out documents, it is performed the case analysis based on the results of LCC calculation about maintenance & conservation costs; repairing costs and replacement costs. It is analyzed LCC on maintenance & conservation costs for 20 years(rent period) and 65 years(life cycle). As a result of LCC analysis, about more than 50% of total LCC are architectural works and the rest of them are machinery works, electric works, and civil works in the order. And it is also suggested some problems and their solutions to perform LCC analysis on the current BTL projects of school.

  • PDF

A Study on School Facilities Build Transfer Lease Project - Centering on the improvement of the assessment - (학교시설 임대형민자사업의 평가기준 개선연구)

  • Kwon, Byoung-Koo;Lee, Jae-Rim;Jo, Jin-Il
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.7 no.2
    • /
    • pp.30-46
    • /
    • 2008
  • In this study, were prepared after statistical analysis was conducted of assessment items and marks distribution for the selection of executors of the BTL project. When tests of the degree of dispersion and degree of appropriateness for each assessment item were analyzed, it was found that the degree of dispersion among assessment points has the power of discrimination since it is highly marked in the design field and operation management field. In contrast, 'business management plan' and 'investment composition for economic quality assessment' have a low level of the power of discrimination since points given to them have smaller difference between business projects.

  • PDF