• Title/Summary/Keyword: BTL(Build-Transfer-Lease)

Search Result 73, Processing Time 0.025 seconds

A Survey on the Persons in Charge for Economic Estimation Analysis and Improvement of BTL Projects (BTL사업의 경제성 평가 현황조사 및 개선을 위한 실무자 설문조사연구)

  • Lee, Chun-Kyong;Cho, Bong-Ho;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.73-80
    • /
    • 2007
  • As BTL(Build-Transfer-Lease) private investment business benchmarking PHI(Private Finance Initiative) of USA and Japan is introduces to Korea since 2005, as a part of supplying high leveled public service and early expanding required facilities for SOC, Value for Money on private investment business from treasury investment business at the beginning gets to be needed. Accordingly, this survey has been conducted in order to analyse BTL projects status, propriety of economic analysis method(VFM analysis, calculation of estimated business expenses, valuation of bidding price, etc.) by business advance phases from the viewpoint of person in charge, necessity of improvement and alternative plants. As the result of conducting cross tabulation analysis and correlation analysis by occupational group, BTL project advance phases and alternative plans for improvement, it is necessary ye prepare standardized service level against business expense and basis for calculating and evaluation operation expenses. Based on the necessity of quantitative analysis (LCC analysis) of VFM, standard for calculating management, maintenance and administration expenses is required. In addition, reliable economic valuation system considering domestic BTL environment should be setup, for business efficiency.

Architectural Work Cost Rate Analysis of Elementary, Middle, and High School Delivered by BTL (초·중등학교 민간투자사업(BTL)의 건축공사비의 공종별 비율 분석)

  • Ryu, Hanguk;Kim, Hyungeun
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.14 no.1
    • /
    • pp.1-9
    • /
    • 2015
  • The accurate estimation of construction cost is critical for effective budgeting and financing of the project. Accurate estimates also allow for informed decisions when considering the responsiveness of bids or proposals and for a contractor to better monitor construction progress. However, current method for construction cost of the public educational facility uses a basic criteria in Korea, e.g, construction cost per unit floor area. Therefore, the purpose of this study is to examine present architectural work cost rate of elementary, middle, and high school delivered by BTL(Build-Transfer-Lease). We examined real construction cost of educational facility according to level of school, such as elementary, middle, and high school. The examination revealed that unit price of BTL educational construction cost are different to the level of school, but the composing rate of architectural work cost of the educational facility are very similar. As a result, it is recommended that future researches are initiated to create specific methods to support the accurate cost estimation of educational facility.

School Facilities for the Development of BTL Business Management System based on Comprehensive Research (BTL사업 종합관리 시스템 구축을 위한 기능 분석 -학교시설을 중심으로-)

  • Kim, Hyung-Eun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.13 no.1
    • /
    • pp.5-13
    • /
    • 2013
  • BTL business-related systems were developed by the Ministry of Education, Korea Development Institute, Korea Education Development Institute. These systems were effectively support to BTL projects schools that expanding in size. However, compatibility of information is difficult between systems that specific information system developed for the purpose of functional redundancy. In this study, operational readiness, facility management, operations and the assessment phase are divided in the BTL school projects process. And the business functions were analyzed in the related systems. In addition, we are contributed to improve standards and the school BTL business processes to improve the reliability of the process.

An overall valuation about propriety of school facilities BTL through AHP (AHP를 이용한 학교시설 민간투자사업(BTL)의 타당성 종합평가)

  • Ha, Ho-Sung
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.5 no.1
    • /
    • pp.22-39
    • /
    • 2006
  • The purpose of this study is an overall valuation about propriety study of school facilities BTL(Build-Transfer-Lease) by means of AHP(Analytic Hierarchy Process). The search point includes these questions. Is BTL of school facilities a reasonable project for school, or is the former government financial project on the position of comparative superiority? And, is a partial BTL possible as an alternative plan? The result of this study shows that preference rate about BTL is 39%, that of former government financial project is 32%, and that of partial BTL is 29%.

  • PDF

A Study on Maintenance Bundle Alternatives of BTL Project for Educational Facilities Using Complete Linkage Algorithm (컴플리트 링키지 알고리즘을 이용한 교육시설물 BTL사업 유지관리번들 구성방안에 관한 연구)

  • Cho, Chang-Yeon;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.15 no.3
    • /
    • pp.4-16
    • /
    • 2008
  • BTL(Build-Transfer-Lease) Project for Education Facilities is contracted as a package which consists of several education facilities and its maintenance period is 20 years. Thus, total cost variation largely depends on the accuracy of the maintenance cost forecasting in the early stage in the life cycle of the BTL Projects. This research develops a method using complete linkage algorithm and branch & bound algorithm to help in finding optimal bundling combination. The result of this research suggests more reasonable and effective forecasting method for the maintenance bundle in BTL projects.

How to improve the governance for PPPs on special purpose facilities in Korea - based on the UK PFI failure case study - (특수목적 시설 민간투자사업 거버넌스 개선 방향 -영국 국립물리연구소 실패 사례 분석을 중심으로-)

  • Choi, Seok-Joon;Lee, Ji-Hae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.32-40
    • /
    • 2011
  • The PPPs(public private partnerships) which was introduced in the later part of the 1990s has grown since 2005, with the beginning of BTL(Build Transfer Lease) type which retrieves the investment by receiving the lease payment from the government. As application areas and scale of the PPPs have been further expanded, it is expected the demand on special purpose facilities will be increased. We do know only successful foreign practices of the PPPs but have rarely consider the failure cases. Therefore, this paper derives implications by analyzing the case of National physical laboratory project which is known as a typical failure case of UK's PFI. We find that from the perspective of governance, the reasons leading to the failure of business are an insufficient of technical rationality, unsettled social relationships and inefficient risk management. Based on the case study, this study shows how to improve management system for special purpose PPPs business in Korea.

A Quantity Prediction Model for Reinforced Concrete and Bricks in Education Facilities Using Regression Analysis

  • Lee, Jong-Kyun;Kim, Boo-Young;Kim, Jang-Young;Kim, Tae-Hui;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.506-512
    • /
    • 2013
  • Since the amendment of the law on the private sector investment in social infrastructure in January of 2005, the government has been actively promoting Build-Transfer-Lease (BTL) projects. Notably, most new educational facilities have been built as BTL projects. For these facilities, the unit cost per unit area has been applied to predict construction costs. However, since construction costs are mostly managed after the detailed design phase, the costs can be estimated incorrectly. For this reason, cost management is needed in the planning phase, with a sound approximate estimate to prevent the wasteful use of funds. To address this shortcoming, this study aims to develop a quantity prediction model for education facilities using regression analysis in the planning phase. The developed model is focused on the required quantities of reinforced concrete and bricks. In order to achieve the objective, the data of 44 educational facility projects collected from Gyeonggi-do was used in the regression model. This study can be utilized by major stakeholders to accurately predict construction costs by estimating the appropriate quantities of reinforced concrete and bricks in the planning design phase.

Value Management of Private Finance Initiative Projects (민간투자사업을 위한 VE 적용방안)

  • Lim, Jong-Kwon;Kim, Seoung-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.123-130
    • /
    • 2006
  • Recently, Korean government promotes BTL(Build-Transfer-Lease) for their public construction project to apply private sector's experience and finance initiatives. Many of public buildings and civil infrastructure projects were planned to be delivered by BTL and it helps to continue public projects under tight budget conditions. Since the characteristics of BTL projects, creative ideas for the project function, performance and its LCC (Life Cycle Cost) become more important than usual public work project. This paper introduces the systematic "VE job Plan" application techniques for BTL project and shows the process. This study shows the application of "VE job Plan" for BTL project to help decision making and value improvement. Also, Project cost was estimated by LCC (Life Cycle Cost) analysis. Technical "FAST diagram"was developed and used to find major functions of the project. So, it helps to improve performance of functions and make creative ideas. FAST diagram also help to find relationships between functions and cost. A case study (Daegu Art Gallery BTL Project) was conducted using proposed "VE job Plan. Study demonstrates how value management helps save money and increase functional performance. Researcher found that project can save cost and improve performance of functions significantly by using appropriate VE analysis process at appropriate time.

  • PDF

Comparative Analysis between GDP Deflator Method and Index Adjustment Rate Method on BTL Sewer Rehabilitation Projects in Jeju (제주도 내 하수관거정비 BTL사업의 GDP 디플레이터 방식과 지수조정률 방식과의 비교 분석)

  • Yang, Du-Suck;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.217-227
    • /
    • 2015
  • This study conducted case studies in order to suggest the improvement of GDP (Gross Domestic Product) deflator method which is adopted on calculating fluctuation rate on BTL (Build-Transfer-Lease) sewer rehabilitation projects in Jeju. As a result, because GDP deflator method calculates fluctuation rate by each quarterly, the fluctuation rate of GDP deflator method is higher than it of index adjustment rate method. And GDP deflator method cannot reflect real price because of applying fixed index in whole construction cost for calculating fluctuation rate. Especially, the notification day - the base point influences fluctuation rate and fluctuation amount strongly in GDP deflator method.