Evaluating Effectiveness of BIM-based Idea Bank during VE Workshop

  • Kim, Hojun;Park, Heetaek;Park, Chansik
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.650-651
    • /
    • 2015
  • Value Engineering has been recognized as one of the construction management techniques for improving the value and benefits of whole project. However, due to the lack of the past data and inefficient free-thinking techniques, the idea generation during VE workshop is still inefficient and ineffective. Even though various studies related to theoretical methodology and technical systems relevant to database were conducted, VE team still mainly rely on their experience for idea generation. With this regard, this study suggests an approach of BIM-based idea bank and assesses its effectiveness by interviewing 20 VE experts in the industry. This approach covers the three steps of idea generation, consisting of 1) Developing BIM based VE database, 2) Generating VE ideas, 3) Updating VE ideas. The result showed that the proposed approach has great potentials to support VE team and improve the quality of VE ideas during creativity phase.

  • PDF

3D스캐닝을 이용한 건설공사 스마트 품질점검 방안에 관한 연구 (Smart Quality Inspection Scheme for Construction Project Using 3D Scanning Technology)

  • 이돈수;김광희
    • 한국건축시공학회지
    • /
    • 제20권2호
    • /
    • pp.191-198
    • /
    • 2020
  • 건설산업에도 스마트 건설기술들이 많이 도입되고 있으며, 여러 기술 중 3D 스캐닝과 BIM을 이용한 품질관리를 시도하는 회사가 증가하고 있다. 따라서 본 연구에서 3D 스캐닝과 BIM을 현장 품질점검 사례에 적용하여 활용가능성과 효용성을 확인하였다. 그 결과 3D 스캐닝과 BIM을 활용한 품질점검은 기존에 시행했던 품질점검보다 시간적으로 단축되고 적은 인력으로도 실현이 가능하다는 것을 확인하였다. 따라서 품질점검의 다양한 분야에 3D 스캐닝과 BIM을 활용한 기술을 적용할 수 있을 것으로 사료된다.

항만 BIM 데이터의 상호운용성 확보를 위한 IFC 표준 개발 (Development of IFC Standard for Securing Interoperability of BIM Data for Port Facilities)

  • 문현석;원지선;신재영
    • 한국BIM학회 논문집
    • /
    • 제10권1호
    • /
    • pp.9-22
    • /
    • 2020
  • Recently, BIM has been extended to infrastructures such as roads and bridges, and the demand for BIM standard development for ports is increasing internationally. Due to the low level of utilization of classification system and drawing standards compared to other infrastructures, and the closed nature of national security facilities, ports have insufficient level of connection and sharing environment among external systems or users. In addition, since the standardization of data for port facilities is not made, it is still necessary to establish an independent DB for each system and to ensure interoperability of data between these systems since it does not have a shared environment among similar data. Therefore, the purpose of this study is to develop and verify IFC, the international standard for BIM, in order to cope with the BIM environment and to be commonly used in the design, construction, and maintenance of port facilities. To this end, we build a standard schema with port-specific Express Notation according to buildingSMART International's standard development methodology. First, domestic and international reference model standards were analyzed to derive components such as space and facilities of port facilities. Based on this, the components of the port facility were derived through the codification, categorization, and normalization process developed by the research team. This was extended based on the port BIM object classification system developed by the research team. Normalization results were verified by designers and associations. Then, IFC schema construction was based on Express-G data modeling based on IFC 4 * 2 Candidate, which is a bridge candidate standard based on IFC4 (ISO16739), and IFC 4 * 3 Draft, which is developed by buildingSMART International. The final schema was validated using the commercialized validation tool. In addition, in order to verify the structural verification of the port IFC schema, the transformation process was verified by converting the caisson model into a Part21 file. In the future, this result will not only be used as a delivery standard for port BIM products, but will also be applied as a linkage standard between systems and a common data format for port BIM platforms when BIM is used in the maintenance phase. In particular, it is expected to be used as a core standard for data exchange in the port maintenance stage.

구조안전진단에서의 3D 레이저 스캐너 투입 성과 분석 (Analysis of 3D Laser Scanner Input Performance in Structual Safety Diagnosis)

  • 성도윤;백인수;김재준;함남혁
    • 한국BIM학회 논문집
    • /
    • 제11권3호
    • /
    • pp.34-44
    • /
    • 2021
  • This study quantitatively analyzes the work performance of the structural safety diagnosis team that diagnoses pipe racks. To this end, a method for evaluating the performance of the structural safety diagnosis team using the queuing model was proposed. For verification, the case of applying the existing method and the method of introducing a 3D laser scanner for one site was used. The period, number of people, and initial investment cost of each project were collected through interviews with case project experts. As a result of analyzing the performance of the structural safety diagnosis team using the queuing model, it was possible to confirm the probability of delay in the work of each project and the amount of delayed work. Through this, the cost (standby cost) when the project was delayed was analyzed. Finally, economic analysis was conducted in consideration of the waiting cost, labor cost, and initial investment cost. The results of this study can be used to decide whether to introduce 3D laser scanners.

BIM의 공정과 기성 관리 적용을 위한 CBS 수량 분개 및 코드 정립 방안 (Methods for Quantitative Disassembly and Code Establishment of CBS in BIM for Program and Payment Management)

  • 김한도;남정용;김용주;류인혜
    • 한국전산구조공학회논문집
    • /
    • 제36권6호
    • /
    • pp.381-389
    • /
    • 2023
  • BIM에서 가장 중요한 요소 중의 하나가 디지털 데이터이다. 체계적인 디지털 데이터 관리를 위해 최근까지 연구를 통해 객체분류체계(OBS)와 속성분류체계(Pset)가 제시되어 왔다. 특히 공정 및 기성 관리에 사용되는 디지털 데이터는 WBS와 CBS로 나뉘고 이를 BIM 객체와 매핑하려면 CBS의 수량 분개가 필요한데 CBS는 양이 매우 방대하고 공종이나 규격, 명칭 및 CBS 코드가 발주처마다 상이하여 WBS나 BIM 모델에 맞는 수량 분개 작업을 엑셀 등을 이용해서 수작업으로 한다는 것은 사실상 어렵다. 이러한 문제점을 극복하기 위해 BIM 모델에 의해 산출하기 힘든 수량 중에서 대부분을 차지하는 연장에 근거한 수량의 전체분을 분개하는 방안, 축적된 WBS-CBS 이력으로부터 최적 CBS를 도출하는 방안과 합리적인 CBS 데이터베이스 구축을 위해 필수적인 CBS 코드 통합 표준화 방안을 제시하였다.

3D BIM을 활용한 골조 거푸집 공사의 생산성 분석에 관한 연구 (Productivity Analysis for Strutural Formwork Using 3D BIM)

  • 최창훈;박영진;소지윤;김성연;이준복
    • 한국건축시공학회지
    • /
    • 제14권4호
    • /
    • pp.292-300
    • /
    • 2014
  • 건설 프로젝트에 BIM기술이 적용되기 시작하면서, BIM은 전 생애주기 동안 다양한 분야의 정보를 생산하고 활용될 수 있도록 활발한 연구가 진행되고 있다. 따라서 본 연구는 BIM기반의 물량산출 데이터를 활용하여 생산성을 분석할 수 있는 방안을 제시할 목적으로 진행되었다. 본 연구에서는 3D BIM기반 모델을 기반으로 부재의 물량정보를 활용하여 물량을 산출하였으며, 이를 활용하여 현장 생산성을 도출하여 통합 생산성 기준과 비교 분석하였다. 향후 본 논문의 연구 결과를 기반으로 생산성 저하요인을 분석하여 현장생산성을 향상시킬 수 있는 관리방안 도출이 가능할 것으로 사료된다.

린 기법의 BIM 기반 설계조율 프로세스 접목 - 설비전기 설계조율 프로세스 재설계 사례연구 - (Application of Lean Theory to BIM-Based Coordination - A Case Study on Process Re-Engineering of MEP Coordination -)

  • 장세준
    • 한국건축시공학회지
    • /
    • 제18권1호
    • /
    • pp.67-79
    • /
    • 2018
  • 이 논문은 프로세스 재설계 관점에서의 린 (lean) 개념의 이론적 변형과 BIM 프로세스 개선 사례를 제시한다. 최근에는 BIM을보다 효율적으로 사용하기위해 린 개념을 접목하는 연구들이 증가하고 있다. 린 이론과 성격과 기능은 제조업을 기반으로 하며 제조업에서의 프로세스는 린 개념의 프로세스 재설계 과정에 의해서 변형된 하나 프로세스로 개선된다. 하지만 제조 공정과 건설 공정은 다른 특성을 가지고 있다. 두 산업의 서로 다른 차이점으로 인해 전통적인 린의 프로세스 재설계 기능의 5 단계에는 이론적으로 BIM 프로세스에 그대로 적용하기에는 어려운 단계들이 포함되어 있다. 본 연구는 부분적으로 적용되는 린 개념의 접목을 해결하기 위해 제조 공정 및 BIM 프로세스의 특징을 분석했다. 이를 통해 이론적으로 린의 프로세스 재설계 단계를 수정하고 확장했다. 변형된 프로세스 재설계 단계는 설비전기 설계조율 프로세스에 적용했다. 본 연구에서 제안한 8단계의 프로세스 재설계 단계를 통해 일체화된 BIM 프로세스로 변형할 수 있었다. 또한 사례연구 결과는 공정 단계의 감소 및 비용절감의 가능성을 나타냈다. 본 연구의 결과는 BIM 프로세스 뿐만 아니라 다양한 프로세스에 접목될 수 있는 린 개념의 이론적 기초가 될 수 있다.

4D CAD시스템의 기능분석 및 선형시설물 적용을 위한 기능 개선 방안 (Functional Analysis of 4D CAD System and Improvement of Function for Applying Linear Construction Project)

  • 김현승;강인석
    • 한국산학기술학회논문지
    • /
    • 제19권9호
    • /
    • pp.269-278
    • /
    • 2018
  • 국내 BIM기술은 건축공사를 중심으로 적용되고 있으나, 최근 정부에서 인프라시설물 BIM적용 의무화를 검토하고 있으므로 토목공사까지 급속히 확대 적용될 것으로 예상된다. 인프라시설물은 광범위한 수평적 공간에서 공정이 진행되므로 BIM기술의 적용은 설계단계의 간섭관리보다는 시공단계의 공정관리 등 사업관리 전반에서 더욱 활용성을 갖게 된다. 4D CAD시스템은 시공단계의 공정관리에 적용되는 대표적인 BIM기술이나 실무적으로 활용할 수 있는 기능의 부족으로 실제 프로젝트에 적용되는 사례는 제한적이다. 본 연구에서는 상용화된 대표적인 4종류의 4D CAD시스템의 기능을 비교분석하여 프로젝트 특성별 선택 기준을 제공하고 실무적 활용성을 갖기 위해 개선되어야 할 기능을 분석하였다. 기능 분석결과로서 시스템별 장단점을 제시하였으며 시스템별 특성 분석으로 사용자의 활용 편리성을 제시하였다. 또한 토목시설물에 적용 가능한 기능 개선을 위하여 선형 4D시뮬레이션 방법론을 개발하여 인프라 시설물의 시공단계 BIM으로 활용성을 높일 수 있는 방안을 제시하였다. 철도 및 도로시설 공사에서 토공, 교량, 터널 등의 대부분 공정들은 수평적 공간에서 거리 축에 따라 작업이 진행된다. 따라서 단순히 기존 Gantt chart 방식의 4D 표현방법보다는 거리 축에 따라 공정이 표현되는 선형 4D 시뮬레이션 방법이 보다 실무적으로 도움이 될 수 있다.

철도 선형중심의 객체 정보연계를 통한 철도 궤도부 정보모델 생성 방안 (Information Modeling of Railway Track using Information Iinkage of Railway Alignment and Alignment-based Objects)

  • 권태호;박상일;신민호;이상호
    • 한국전산구조공학회논문집
    • /
    • 제30권6호
    • /
    • pp.507-514
    • /
    • 2017
  • 건축분야에서 BIM이 널리 사용되면서, 토목구조물에 BIM을 적용하려는 노력이 최근 급속히 증가하고 있다. 그러나 기존 상용 BIM 소프트웨어의 기능은 건물 등의 건축물 중심으로 특화되어 있기 때문에 선형 중심의 토목구조물에 적용하기에 많은 어려움이 따른다. 본 연구에서는 철도 궤도부의 객체 정보를 관리하기 위하여 선형을 다룰 수 있는 소프트웨어와 BIM 소프트웨어간의 정보공유를 통해 캔트가 반영된 정보모델 생성방법을 제시하였다. 철도 궤도부 모델링은 궤도부 구조물을 연속 구조물과 비연속 구조물로 분류한 후, 연속 구조물을 선형 소프트웨어에서 생성하고, 이후 공유된 선형정보를 이용하여 비연속 구조물의 정보모델을 생성하는 절차로 이루어진다. 이 때 비연속 구조물은 BIM 소프트웨어에 전달한 이산화된 궤도 선형 및 캔트 정보를 바탕으로 비연속 구조물 각각의 위치, 회전 정보를 계산하는 알고리즘을 통하여 생성된다. 본 연구에서 제시한 방법을 오송 철도종합시험선로에 적용하여 그 실용성을 검증하였으며, 생성된 정보모델을 기반으로 명확한 객체 식별과 속성정보 추출 및 객체별 물량산출이 가능함을 확인하였다.

BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구 (A Case Study of BIM-based Framework on Constructability Tasks)

  • 이승일;권남하;조영상
    • 한국건축시공학회지
    • /
    • 제10권5호
    • /
    • pp.45-54
    • /
    • 2010
  • 오늘날 건설 프로젝트는 초고층화, 복잡화, 인텔리전트화 되면서 그에 따른 관리 및 생산성 향상을 위해 린 건설과 같은 업무의 통합 관리 시스템이 요구된다. 특히 건설 정보 통신기술 (Information Technology) 분야에서는 건축물의 전 생애주기 동안에 필요한 데이터를 생산하고 관리하는 프로세스인 건축정보모델링 (Building Information Modeling) 에 대한 관심이 높아지고 있고, 기술적 측면에서는 프로젝트의 목적인 비용-공기-품질을 최적화하기 위해 시공지식과 경험의 통합을 달성하기 위한 시스템인 시공성분석(Constructability)에 대한 연구가 진행되고 있다. 하지만, 현재 진행되는 시공성분석 업무는 기존의 2D 도면이나 문서로 수행되어 각 분야 전문가들이 업무에 활용되는 정보의 일관성과 정확성이 부족하고, 분석된 업무내용을 공유하기 어려우며, 생산된 정보의 활용이 효율적이지 못하다. 본 연구에서는 건설 프로젝트 단계 가장 긴 공기를 차지하는 건축공사의 골조공사단계로 연구범위를 한정하여 골조공사 단계에서 설계와 시공의 협업을 통한 BIM 기반 시공성분석 업무를 실 프로젝트 중심으로 분석하여 업무개선 방법 및 효과를 제시하고자 한다.