A Case Study on Assessing the Productivity of a BIM team in a Construction Company

  • Huang, Chien-Hsun;Hsieh, Shang-Hsien
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.259-262
    • /
    • 2015
  • Due to the labor-intensiveness, high investment cost, long execution time, frequent change orders, and many stakeholders in a BIM project, a BIM manager is bound to face a lot of risks to make decisions in cost managing process. Since the productivity of a BIM team will affect the execution cost, this study investigates a simple method of assessing the productivity of a BIM team using the working timesheet records of the team. In this research, the productivity of a BIM team is defined as the effective working floor area (in square meters) of BIM uses per labor-time (in man-months) spent by the team. After the applicability of this method is tested by regression analysis using data from 5 real BIM projects in the construction phase, it is found that the simple productivity definition adopted in the method, although easy-to-implement, does not produce a statistically constant productivity value. More research is therefore needed in the future to devise better indicator(s) for assessing the productivity of a BIM team.

  • PDF

A Study on the Development of the BIM Process for Improvement of the BIM Application Ability of the Construction Industry (건설산업의 BIM 적용능력 제고를 위한 BIM 프로세스 개발에 관한 연구)

  • Kim, Ji-Won;Lee, Min-Cheol;Choi, Jeong-Min;Ock, Jong-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.738-743
    • /
    • 2008
  • Recently BIM is utilized to improve productivity for Life Cycle Cost of construction projects. Therefore, the establishment of BIM process by each construction project is a necessary element. However, cases and the pertinent researches that BIM process by each project is established are still not enough in Korea. The study proposed construction of BIM process through how to set up BIM application, how to organize a BIM team, how to set up a family and modeling method in the early stage. To achieve the purpose, the study examined application ability of BIM process by carrying out basic setting and modeling work through pilot study model, examination of the amount of materials and information interchange with IFC. The study attempted making a foundation of domestic BIM guideline construction through the above examination.

  • PDF

Key Indicators for Evaluating BIM Collaboration Performances.

  • Sacchettini, Lou;Park, Moonseo;Lee, Hyun-Soo;Lee, Jin Gang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.236-240
    • /
    • 2015
  • The accelerating adoption of BIM (Building Information Modeling) is challenging collaboration practices established in the construction industry. The implementation of BIM involves changes in participants work, organization, processes and collaboration methods. Therefore there is a need to be able to measure effectively and accurately collaboration, in order to analyze and determine current practices and their performances in organizations (company, team project) as well as changes required. Previous researches scope from evaluating BIM maturity of an organization to BIM collaboration requirements but lack of proper tools and methods to analyze collaboration performances. This is especially true when it comes to evaluate the efficiency and collaboration performances of processes rather than systems or organizations. Thus this research aims to analyze systematically and comprehensively previous researches proposing diversified methods to evaluate BIM performances and collaboration. Furthermore it aims to suggest key indicators to evaluate collaboration performances of processes and project organizations. This research may contribute to better understanding of collaboration performances within organizations using BIM and further development of evaluation method for analyzing BIM design project.

  • PDF

Development of Automatic BIM Modeling System for Slit Caisson (슬릿 케이슨의 BIM 모델링 자동화 시스템 개발)

  • Kim, Hyeon-Seung;Lee, Heon-Min;Lee, Il-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.510-518
    • /
    • 2020
  • With the promotion of digitalization in the construction industry, BIM has become an indispensable technology. On the other hand, it has not been actively utilized in practice because of the difficulty of BIM modeling. The reason is that 3D modeling is less productive not only because of the difficulty of learning BIM software but also the modeling work is done manually. Therefore, this study proposes a method and system that can improve the productivity of BIM-based modeling. For this reason, in the study, a slit caisson, which is a typical structure of a port, was selected as a development target, and various parameters were derived through interviews with experts so that it could be used in practice. This study presents a UI construction plan that considers user convenience for efficient management and operation of diverse and complex parameters. Based on this, this study used visual programming and Excel VBA to develop a BIM-based design automation system for slit caissons. The developed system can use many parameters to quickly develop slit caisson models suitable for various design conditions that can contribute to BIM-based modeling and productivity improvement.

A STUDY ON THE CONSTRUCTION OF BIM DATA INTEROPERABILITY FOR ENERGY PERFORMANCE ASSESSMENT BASED ON BIM

  • Jungsik Choi;Hyunjae Yoo;Inhan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.267-273
    • /
    • 2013
  • Early design phase energy modeling is used to provide the design team with first order of magnitude feedback about the impact of various building configurations. For better energy-conscious and sustainable building design and operation, the construction of BIM data interoperability for energy performance assessment in the early design phase is important. The purpose of this study is to suggest construction of BIM data interoperability for energy performance assessment based on BIM. To archive this purpose, the authors have investigated advantage of BIM-based energy performance assessment through comparison with traditional energy performance assessment and suggested requirement for construction of open BIM environment such as BIM data creation, BIM data software practical use, BIM data application and verification. In addition, the authors have suggested BIM data interoperability and BIM energy property mapping method focused on materials.

  • PDF

Development and Application of Tunnel Design Automation Technology Using 3D Spatial Information : BIM-Based Design for Namhae Seomyeon - Yeosu Shindeok National Highway Construction (3D 공간정보를 활용한 터널 설계 자동화 기술 개발 및 적용 사례 : 남해 서면-여수 신덕 국도 건설공사 BIM기반 설계를 중심으로)

  • Eunji Jo;Woojin Kim;Kwangyeom Kim;Jaeho Jung;Sanghyuk Bang
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.209-227
    • /
    • 2023
  • The government continues to announce measures to revitalize smart construction technology based on BIM for productivity innovation in the construction industry. In the design phase, the goal is design automation and optimization by converging BIM Data and other advanced technologies. Accordingly, in the basic design of the Namhae Seomyeon-Yeosu Sindeok National Road Construction Project, a domestic undersea tunnel project, BIM-based design was carried out by developing tunnel design automation technology using 3D spatial information according to the tunnel design process. In order to derive the optimal alignment, more than 10,000 alignment cases were generated in 36hr using the generative design technique and a quantitative evaluation of the objective functions defined by the designer was performed. AI-based ground classification and 3D Geo Model were established to evaluate the economic feasibility and stability of the optimal alignment. AI-based ground classification has improved its precision by performing about 30 types of ground classification per borehole, and in the case of the 3D Geo Model, its utilization can be expected in that it can accumulate ground data added during construction. In the case of 3D blasting design, the optimal charge weight was derived in 5 minutes by reviewing all security objects on the project range on Dynamo, and the design result was visualized in 3D space for intuitive and convenient construction management so that it could be used directly during construction.

A Study on the good use of Construction Management Model based on BIM (CM(ConstructionManagement)에의 효율적 BIM활용에 관한 연구)

  • Min, Young-Gi;Kim, Kyung-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.87-95
    • /
    • 2010
  • The CM(Construction Manager) of D-university has been seeking the advice of my BIM-team to adopt CM(Construction Management) and BIM best practices to improve project delivery results, and has authored best practice reports for spatial validation, BIM, 3D, 4D and 5D performance. Building Information Modeling(BIM) Process, Integration, and Adoption looks at BIM implementation from a company and project level laying out a process for companies to use BIM. Following this studies, participants will be able to: 1. BIM participants has been creating a BIM process diagram for a project, and has been evaluating and selecting process options for a specific BIM project. 2. BIM participants has been describing the roles and responsibilities of participants in the BIM process, and has been communicating the BIM process to management, colleagues, and project stakeholders. 3. BIM participants has been identified consistent factors influencing BIM return on investment at the project level and the company level, and has been outlining a process for BIM adoption on the project level and company level.

BIM Awareness Assessment among Hydropower Professionals in Nepal

  • Bhattarai, Sushmit Sharma;Kisi, Krishna P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1154-1161
    • /
    • 2022
  • Building Information Modelling (BIM) has evolved into a comprehensive, collaborative method in construction project delivery. Most industrialized and developed countries have made BIM mandatory in the government and public projects, whereas developing countries are embracing and catching up BIM technologies to improve their professional's abilities and reduce claims in the construction projects. However, BIM awareness and professional's competence have become critical in implementing BIM in infrastructure projects in Nepal, particularly hydropower projects. The objectives of this study are to find the BIM awareness among hydropower professionals in Nepal and assess their response. The study used a questionnaire survey to assess the awareness. The results showed that only few professionals (12 percentage in this study) are aware of BIM and its application in Hydropower infrastructures. Majority of the respondents (more than 50%) were interested in BIM trainings and believed BIM implementation in future projects. The study indicated that lack of BIM training and lack of BIM awareness were the top factors affecting BIM implementation in hydropower projects in Nepal. The findings showed that about 66 percent of the respondents who used BIM in their projects mainly used during construction phase. More than 80 percent believed that BIM should be mandated for the hydropower projects in Nepal. The findings presented in this study could promote awareness among different professionals, organization, and construction team and encourage BIM implementation in Hydropower projects. The findings could raise awareness of BIM in Nepal's infrastructure sectors and its invaluable benefits in construction.

  • PDF

Development of Automated 3D Modeling System to Construct BIM for Railway Bridge (철도 교량의 BIM 구축을 위한 3차원 모델 생성 자동화 시스템 개발)

  • Lee, Heon-Min;Kim, Hyun-Seung;Lee, Il-Soo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.31 no.5
    • /
    • pp.267-274
    • /
    • 2018
  • For successful BIM settlement, it is a key technic for engineer to design structures in the 3-dimensional digital space and to work out related design documents directly. Lately many BIM tool has been released and each supports their 3-dimensional object libraries. But it is not easy to apply those libraries to design transportation infra structures that were placed along the route(3-dimensional line). Moreover, in case of design changes, it is so difficult to reflect those changes with the integrated model that was assembled by them. Because of they were developed without consideration for redundancy of parameters between objects that were placed nearby or were related each other. In this paper, a method to develop module for modeling and placing 3-dimensional object for transportation infra structures is presented. The modules are employed by a parametric method and can deal with design changes. Also, for a railroad bridge, through developing user interface of the integrated 3-dimensional model that was assembled by those modules the applicability of them was reviewed.

A Study on Development of Framework Based BIM Guideline System (BIM지침의 통합관리를 위한 구조화에 관한 연구)

  • Han, Jisu;Lee, Seip;Jo, Chanwon;Kim, Gutaek;Cho, Joowon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.2
    • /
    • pp.210-219
    • /
    • 2015
  • As various contractors have been asking BIM data in the construction industry, BIM guidelines and standards has become increasingly important these days. Above all, BIM guidelines should be established properly because it is utilized at the earliest stage of BIM data creation. However, each of the existing BIM guidelines was totally different by contractors, disciplines or phases so that it caused problems about repetitious work, inefficient management and so on. In order to overcome these problems, we suggest integrated management system for BIM guidelines. We firstly collected and analyzed existing guidelines, secondly standardized guideline phrases and lastly constructed data structure of integrated management system. This integrated management system is expected to increase work efficiency to avoid working error for designers and enable easy creation or revision of BIM guidelines for contractors.