• Title/Summary/Keyword: BIM based Information Management

Search Result 344, Processing Time 0.025 seconds

Rule-based Review and Automated Quality Management Process of BIM deliverables for Railway Infrastructures (철도인프라 BIM 성과물의 품질검토 절차 및 룰 기반 적용성 검토)

  • Kang, Jeon-Yong;Hasan, Syed Mobeen;Min, Ji-Sun;An, Joon-Sang;Choi, Jae-Woong
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.23-34
    • /
    • 2022
  • In the current 2D-based design, design reliability is lowered due to interference and inconsistency between plans, errors in drawings and quantities, etc. At the time of transition to BIM-based 3D design, it is necessary to expand the reliability and usability of BIM by eliminating these errors from the design stage through securing the quality of the BIM digital model. Therefore, in the railway infrastructure design stage, the quality management process and standards of the BIM digital model were defined and quality management index were developed. Based on the rule extracted from the quality management index, a pilot quality management was conducted in connection with the commercial Model-Checker rule, problems and improvement plans were derived, and a rule-based automated quality management plan was prepared.

Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project- (건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로-)

  • Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.11-24
    • /
    • 2012
  • Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF

Organizational Transformation Strategies for Adopting Building Information Modeling in the Engineering-Construction Industry

  • Yong Han Ahn;Young Hoon Kwak;Sung Jun Suk
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.94-102
    • /
    • 2013
  • The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.

  • PDF

BIM Based Intelligent Excavation System (BIM 기반 지능형 굴삭시스템)

  • Kim, Jeong-Hwan;Seo, Jong-Won
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.1-5
    • /
    • 2011
  • Earthwork is important in terms of construction time and duration, and highly related to the construction productivity. However, current earthwork system has stick to labor intensive process depending on skilled operator's heuristic decision making, so it is hard to improve overall productivity. To overcome this drawback, this paper presents a BIM based Intelligent Excavation System(IES). The BIM technology is applied in the excavation task planning system, Human-Machine Interface for remote-control/autonomous work environment, and web-based Project Management Information System(PMIS) in the IES integration process, and the results are addressed.

EBS for BIM based maintenance management of Thermal Power Plant (BIM기반 화력발전시설 유지관리를 위한 EBS(Elements Breakdown Structure)개발)

  • Kim, Chang-Soo;Cha, Sang-Hoon;Ji, Soung-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.81-82
    • /
    • 2015
  • BIM has been a reliable construction project management tool to handle various kinds of construction information generated in the facility life cycle. To take these advantages, researchers have been promoted numerous studies in a residential, a commercial, and an educational facilities with a large number of on-going projects. However, despite running as the role of essential energy supplier, power plant related BIM research is relatively insufficient than others. In particular, due to the extending of the facility service period and the requirement of the complicated construction project management for 'overhaul' and 'repowering' in the power plant maintenance phase, the needs for using BIM have been increased gradually. For using BIM based maintenance, it is needed to consider an information collecting methods and necessary to develop an appropriate breakdown structure to share information. Therefore, 'EBS' is produced by reviewing the previous research related to BIM and analyzing the repair activities in the maintenance phase. Proposed 'EBS' must be useful not only a judgment between capital expenditure versus revenue expenditure but also appropriate maintenance strategies development for property management.

  • PDF

A Study on the good use of Construction Management Model based on BIM (CM(ConstructionManagement)에의 효율적 BIM활용에 관한 연구)

  • Min, Young-Gi;Kim, Kyung-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.87-95
    • /
    • 2010
  • The CM(Construction Manager) of D-university has been seeking the advice of my BIM-team to adopt CM(Construction Management) and BIM best practices to improve project delivery results, and has authored best practice reports for spatial validation, BIM, 3D, 4D and 5D performance. Building Information Modeling(BIM) Process, Integration, and Adoption looks at BIM implementation from a company and project level laying out a process for companies to use BIM. Following this studies, participants will be able to: 1. BIM participants has been creating a BIM process diagram for a project, and has been evaluating and selecting process options for a specific BIM project. 2. BIM participants has been describing the roles and responsibilities of participants in the BIM process, and has been communicating the BIM process to management, colleagues, and project stakeholders. 3. BIM participants has been identified consistent factors influencing BIM return on investment at the project level and the company level, and has been outlining a process for BIM adoption on the project level and company level.

A Study on the Accuracy of BIM-based Quantity Take-Off of Apartment Interior (BIM기반 공동주택 마감 물량 산출 정확도 연구)

  • Lee, Moon-Kyu;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.12-22
    • /
    • 2013
  • Construction industry throughout the construction projects life cycle using BIM is able to manage information. Among them, BIM-based quantity take-off is directly connected to the data of the construction business as an important management element that is essential for one of the management factors of feasibility study and economic analysis. In addition, the result of BIM-based quantity take-off can be varied depending on modeler, so the exact guideline for BIM modeling is necessary. The BIM-based quantity take-off in terms of reliability and accuracy of the information is very important. Therefore, this study verified the BIM modeling of the apartment interior materials using both separate object and composite object was validated the quantitative comparison of the difference in BIM-based quantity take-off for accuracy & reliability judgment of BIM-based quantity take-off and realistic & desirable suggestion of BIM modeling way. As the result of this study, it is preferable to model various interior materials to use separate object for the purpose of correct BIM-based quantity take-off, but the realistic way of the BIM modeling using both separate object and composite object jointly was verified in order to judge BIM-based quantity take-off in terms of work productivity.

Analysis of Reliability and Suggestion on BIM design at Daegu Expressway Lot No.5 (대구순환고속도로 제5공구 BIM 시범설계의 신뢰성분석 및 제언)

  • Seol, Un-Ho;Bae, Byung-Hoon;Park, Jong-Seo;Shin, Jae-Choul;Lee, Geun-Il
    • Journal of KIBIM
    • /
    • v.4 no.4
    • /
    • pp.1-12
    • /
    • 2014
  • As interest for visualization and real time processing of construction management information was heightened recently, a diversity of management tools have been developed and corresponding systems also have been changed. In the case of BIM(Building Information Modeling) which is being spotlighted as such kind of management tool, its outcome such as technical innovation and time saving through overseas success case, reducing effect of unnecessary work, and so forth has continuously been established. The BIM in which various information related with life cycle of project are managed with the base of 3D object is useful as an information management tool of construction project which becomes complex and large in its scale. The aim of this paper is analysis or reliability on BIM design for expressway. To solve these issues, this study analyzes the design document, road design handbook, guide. Also this paper performed analysis of reliability 2D vs. BIM quantity calculation. This pilot projects "BIM design at Daegu expressway Lot No.5" lays the foundation for future work on BIM based civil engineering design.

CRITICAL FACTORS FOR ASSESSMENT OF BIM BASED QUANTITY-TAKE OFF

  • Seong-Ah Kim;Chang-Hee Lee ;Sangyoon Chin;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.7-11
    • /
    • 2011
  • Quantity take-off (QT) is one of the most important tasks for determining the total cost of a construction project, and it requires accuracy and reliability for the result. Accuracy and reliability in BIM-based QT are also required to assure the completeness of the result. However, there has been no basis to measure the completeness of the BIM-based QT result. As BIM is increasingly being adopted in the construction industry with a wide variety of purposes, it becomes more important to have a method to improve the completeness of BIM-based QT and criteria to measure it. This research focuses on the hypothesis that the completeness of BIM-based QT relies on the accuracy and reliability of BIM and the BIM-based QT process. As a basic research to determine the completeness of BIM-based QT, this research analyzes and derives factors that affect the completeness of BIM-based QT.

  • PDF