• Title/Summary/Keyword: BIM based Construction Management

Search Result 351, Processing Time 0.03 seconds

A Study on the development of Construction Field Management Model based on BIM (BIM기반 건설현장 관리모델 개발에 관한 연구)

  • Jun, Young-Woong;Lee, Myoung-Sik
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.3
    • /
    • pp.69-76
    • /
    • 2009
  • The importance of efficient construction site management has been growing as the amount of construction information increases which is used in the growing construction site. Accordingly in this study, we are trying to find out the application situation and possibility of BIM through theoretical examination and domestic & overseas case study of BIM and we are trying to suggest the way of efficient construction site management formulation through implementation phase-oriented and cooperation entity-oriented analysis in the construction site. We found out that it was possible to minimize time loss and financial loss by visualizing 2D drawings through 3D modeling of target building by applying BIM and that it was possible to improve accuracy of budget planning with quantitative information of 3D model, to plan construction process with more confidence due to accurate architectural information of drawings and quantitative information, and to manage cost and quality through process management based on construction information acquired by BIM including object information by part. It is concluded that we can improve efficiency of construction management between field and each cooperating entity by integrating and linking BIM information through this process.

  • PDF

Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project- (건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로-)

  • Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.11-24
    • /
    • 2012
  • Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.

Quantifying Values from BIM-projects life cycle with cloud-based computing

  • Choi, Michelle Mang Syn;Kim, Inhan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.271-275
    • /
    • 2015
  • A variety of evaluation application and initiatives on the adoption of Building Information Modelling (BIM) have been introduced in recent years. Most of which however, focused mainly on evaluating design to construction phase-processes, or BIM utilization performances. Through studying existing publications, it is found that continuous utilization of BIM data throughout the building's life cycle is comparatively less explored or documented. Therefore, this study looks at improving this incomplete life cycle condition with the concept that accumulated BIM data should be carried forward and statistically quantified for cross comparison, in order to facilitate practitioners to better improve the projects the future. Based on this conceptual theory of moving towards a closedloop BIM building life cycle, this study explores, through existing literature, the use of cloud based computing as the means to quantify and adaptively utilize BIM data. Categorization of BIM data relations in adaptive utilization of BIM data is then suggested as a initial step for enhancing cross comparison of BIM data in a cloud environment.

  • PDF

Existing Building Approval Submission Process Improvement Effect Analysis thru Utilization of BIM

  • Yeo, Chang-Jae;Yu, Jung-ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.664-664
    • /
    • 2015
  • Advanced countries have mandated applying BIM in construction projects. Also, Public Procurement Service has planned to mandate applying BIM to all construction project that ordered in PPS from 2016 in KOREA. However, now Seumter that is building administration system is not supported BIM based construction license BIM information from Seumter. Thus, despite the applicant is preparing a BIM model, they do not take advantage of BIM information in Seumter. In previous studies. We developed a BIM based building approval submission system. In this study, we verified the system that developed in previous research. As a result, requirement information input time reduction in Seumter system showed high satisfaction. But there was as low usability because building approval submission system cannot support some information for building approval in seumter. If the system will do utilization and management with the building approval system, the applicant can be using BIM base design document information and saving the time that takes at building approval submission. Study about the system improvement is required for application to building approval system.

  • PDF

Risk Identification and Management Strategies for BIM Projects

  • Ng, Ron C.W.;Cheng, Jack C.P.;Das, Moumita
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.103-113
    • /
    • 2020
  • The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.

  • PDF

Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.

A Study on the Construction Management Method based on BIM for Civil Engineering Project (토목시설물에 대한 BIM기반 공사관리 기법 연구)

  • Kim, Sung-Hoon;Lee, Sang-Ho;Nam, Sang-Hyeok;Sun, Oh-Young
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.24 no.4
    • /
    • pp.463-469
    • /
    • 2011
  • BIM(Building Information Modeling) technologies should be applied for the construction life cycle to maximize its efficiency, but the utilization for the construction phase has been significantly lower than that for the planning and design phase. Recently, some of BIM techniques such as 3D design review, 4D schedule management and so on are being introduced for efficient managing to the big national construction projects. In this study, the utilization plans of BIM are presented for the construction phase of civil engineering facilities. The methods of utilization of BIM are discussed for each type of construction, and the techniques applied to the Seoul Subway Lot No. 919 are analyzed for checking the applicability and usability. In particular, a web construction management system based on BIM can help field engineers, headquarters and contractors to use BIM more effectively, and it can be extended to maintenance phase for more efficiencies.

AR system for FAB construction management using BIM data under fast track condition (패스트트랙 환경에서 FAB신축을 지원하는 BIM기반 AR 시스템 개발)

  • Lee, Sang-Won;Lee, Kwang-Soo;Choi, Sung-In;Ryu, Seong-Chan;Park, Jung-Seo
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.1-18
    • /
    • 2022
  • New Fabrication Facility (FAB) construction is performed with Building Information Modeling (BIM) based design. The BIM design data keep updated during the FAB construction. To improve fast-track construction management, a Fabrication Facility Augmented Reality (FABAR) was developed. This study introduces a FABAR system development process and shows performance evaluation results of the FABAR prototype system. The FABAR is implemented with three major modules: Augmented Reality (AR) visualization unit (Room-box) to transfer big BIM data to AR data, AR registration and tracking unit to match AR with real scape and to keep AR coordination in real, and AR data management unit to enhance usability. The prototype performance results were as follows: visualization of design BIM data via AR within 24 hours, precise AR registration and tracking registration, and appropriate usability to support FAB construction management at site. The results indicate that the FABAR is applicable for FAB construction management. Especially, the BIM data transformation method using Room-box in this study signifies a new construction management approach using fluctuating BIM design data in the fast track construction condition.

BIM-GIS Interoperability for Highway Traffic Information Sharing

  • Hu, Xiaoqiang;Bao, Jieyi;Jiang, Yi;Li, Shuo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1051-1058
    • /
    • 2022
  • Information sharing is the main purpose of realizing interoperability between the application domains of Geographic Information System (GIS) and Building Information Modeling (BIM). This paper presents and describes the workflow of BIM-GIS interoperability for highway traffic information sharing. An innovative and automatic Dynamo process was presented to transfer the shapes and attributes of the shapefile from GIS to BIM. On the basis of the transformed BIM model, the detailed traffic data was added and expressed in the form of families and sheets to expand traffic information. Then, the shapes of the model were swept as solid geometries in the BIM environment applying Dynamo. The expanded BIM model was transferred back to the GIS system using the Industry Foundation Classes (IFC) scheme. The mutual communication between BIM and GIS was achieved based on Dynamo and IFC. This paper provides a convenient and feasible way to realize BIM-GIS interoperability for highway traffic information sharing according to the characteristics of highways in terms of graphic expression and model creation.

  • PDF

A Study on the good use of Construction Management Model based on BIM (CM(ConstructionManagement)에의 효율적 BIM활용에 관한 연구)

  • Min, Young-Gi;Kim, Kyung-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.87-95
    • /
    • 2010
  • The CM(Construction Manager) of D-university has been seeking the advice of my BIM-team to adopt CM(Construction Management) and BIM best practices to improve project delivery results, and has authored best practice reports for spatial validation, BIM, 3D, 4D and 5D performance. Building Information Modeling(BIM) Process, Integration, and Adoption looks at BIM implementation from a company and project level laying out a process for companies to use BIM. Following this studies, participants will be able to: 1. BIM participants has been creating a BIM process diagram for a project, and has been evaluating and selecting process options for a specific BIM project. 2. BIM participants has been describing the roles and responsibilities of participants in the BIM process, and has been communicating the BIM process to management, colleagues, and project stakeholders. 3. BIM participants has been identified consistent factors influencing BIM return on investment at the project level and the company level, and has been outlining a process for BIM adoption on the project level and company level.